Clearwater Paper APP CB
5082 Hwy 4 North, Arkansas City, AR 71630Plant Summary Information
Clearwater Paper APP CB is ranked #39 out of 73 power plants in Arkansas in terms of total annual net electricity generation.
Clearwater Paper APP CB is comprised of 1 generator and generated 27.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Clearwater Paper APP CB |
---|---|
Utility Name | Clearwater Paper Corporation |
Location | Desha County, AR |
Initial Operation Date | November 1977 |
Last Update | Dec 2023 |
Annual Generation | 110.7 GWh |
Annual Consumption | 9.4 M MMBtu |
Ranked #3,056 out of 11,835 Power Plants Nationwide | |
Ranked #73 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #39 out of 73 Arkansas Power Plants | |
Ranked #3 out of 3 Arkansas Black Liquor Power Plants | |
Fuel Types | Black Liquor : 63.6% Natural Gas : 36.3% |
Map of Clearwater Paper APP CB
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clearwater Paper APP CB.
Monthly Net Generation for Clearwater Paper APP CB
Clearwater Paper APP CB Details
Summary Information | |
---|---|
Plant Name | Clearwater Paper APP CB (50638) |
Plant Address | 5082 Hwy 4 North, Arkansas City, AR 71630 |
Utility | Clearwater Paper Corporation (56225) |
Latitude, Longitude | 33.7061, -91.2371 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | November 1977 |
Annual Generation | 110.7 GWh |
Fuel Types | Black Liquor : 63.6% Natural Gas : 36.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 85-710-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Paperboard Mills (32213) |
Sector | Industrial CHP (7) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Arkansas Inc (814) AR |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | Enterpaint Energy ARKLA |
Natural Gas Storage | No |
Generator GEN1 Details Operating November 1977
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 28 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1977 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas / Distillate Fuel Oil |
Startup Source | Black Liquor / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Supercritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | BLQ / NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 28 MW |
Net Winter Capacity With Natural Gas | 28 MW |
Net Summer Capacity With Oil | 28 MW |
Net Winter Capacity With Oil | 28 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Clearwater Paper APP CB Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#63 | Longview Fibre | Longview, WA | 170.9 GWh |
#64 | U S Alliance Coosa Pines | Coosa Pines, AL | 139.3 GWh |
#65 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#66 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#67 | International Paper Riverdale Mill | Selma, AL | 462.7 GWh |
#68 | Brunswick Cellulose | Brunswick, GA | 377.9 GWh |
#69 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#70 | Johnsonburg Mill | Johnsonburg, PA | 137.2 GWh |
#71 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh |
#72 | Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh |
#74 | IP Springfield Oregon | Springfield, OR | 91.2 GWh |
#75 | St Francisville Mill | St. Francisville, LA | 116.0 GWh |
#76 | Ticonderoga Mill | Ticonderoga, NY | 187.1 GWh |
#77 | Interstate Paper LLC Riceboro | Riceboro, GA | 103.9 GWh |
#78 | Mosinee Mill | Mosinee, WI | 118.3 GWh |
#79 | Georgia-Pacific Toledo Mill | Toledo, OR | 59.6 GWh |
#80 | Port Townsend Paper | Port Townsend, WA | 35.3 GWh |
#81 | Androscoggin Mill | Jay, ME | 69.3 GWh |
#82 | Packaging of America Tomahawk Mill | Tomahawk, WI | 112.9 GWh |
#83 | Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clearwater Paper APP CB.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 50.5 mi |
C&L | Star City, AR | 2.2 GWh | 42.4 mi |
CF Industries Yazoo City Complex | Yazoo City, MS | 153.6 GWh | 74.4 mi |
Chicot Solar | Lake Village, AR | 210.7 GWh | 17 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 50.8 mi |
Dam 2 | Dumas, AR | 342.3 GWh | 19.9 mi |
Delta Wind Farm (MS) | Dundee, MS | 169.9 GWh | 71.5 mi |
Delta's Edge Solar | Greenwood, MS | 169.1 GWh | 67 mi |
General Dynamics | Hampton, AR | 3.4 GWh | 75.3 mi |
Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh | 57.7 mi |
Gerald Andrus | Greenville, MS | 221.5 GWh | 25.6 mi |
Harry L. Oswald | Little Rock, AR | 941.0 GWh | 83 mi |
Harvest Gold Solar | Indianola, MS | 25.9 GWh | 37.3 mi |
L L Wilkins | Clarksdale, MS | 90.0 MWh | 50.9 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.3 TWh | 52 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 52.4 mi |
Stuttgart Solar | Stuttgart, AR | 157.5 GWh | 52 mi |
Sunflower County | Ruleville, MS | 143.6 GWh | 40.4 mi |
Union Power Station | El Dorado, AR | 11.6 TWh | 82.9 mi |
White Bluff | Redfield, AR | 2.8 TWh | 71.6 mi |