Clear Solar I, LLC
587 Pine Street Extension, Forest City, NC 28043Plant Summary Information
Clear Solar I, LLC is ranked #524 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Clear Solar I, LLC generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Clear Solar I, LLC |
---|---|
Utility Name | Clear Solar I, LLC |
Location | Rutherford County, NC |
Initial Operation Date | September 2020 |
Last Update | Dec 2023 |
Annual Generation | 6.5 GWh |
Annual Consumption | 23.2 k MMBtu |
Ranked #7,115 out of 11,835 Power Plants Nationwide | |
Ranked #2,414 out of 5,643 Solar Power Plants Nationwide | |
Ranked #607 out of 862 North Carolina Power Plants | |
Ranked #524 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Clear Solar I, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clear Solar I, LLC.
Monthly Net Generation for Clear Solar I, LLC
Clear Solar I, LLC Details
Summary Information | |
---|---|
Plant Name | Clear Solar I, LLC (65817) |
Plant Address | 587 Pine Street Extension, Forest City, NC 28043 |
Utility | Clear Solar I, LLC (65069) |
Latitude, Longitude | 35.30831, -81.84183 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | September 2020 |
Annual Generation | 6.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator CLEA1 Details Operating September 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3.6 MW |
Summer Capacity | 3.6 MW |
Winter Capacity | 3.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 4.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Clear Solar I, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Clear Solar Holding, LLC | 11330 Vanstory Drive, Suite 101, Huntersville, NC 28078 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2404 | US Foods Solar | Perth Amboy, NJ | 6.5 GWh |
#2405 | Innovative Solar 6 | Leicester, NC | 6.5 GWh |
#2406 | Phoenix Solar South Farms LLC Solar Farm | Champaign, IL | 6.5 GWh |
#2407 | Carina Community Solar | Zumbro Falls, MN | 6.5 GWh |
#2408 | Cranbury | Cranbury, NJ | 6.5 GWh |
#2409 | Tiller CSG | Clear Lake, MN | 6.5 GWh |
#2410 | SSD Clackamas 1, LLC | Boring, OR | 6.5 GWh |
#2411 | SR Bolivar | Bolivar, TN | 6.5 GWh |
#2412 | Murdock Solar | Clayton, NC | 6.5 GWh |
#2413 | Ware Avra I | Waycross, GA | 6.5 GWh |
#2415 | Oxford Solar | Oxford, MA | 6.5 GWh |
#2416 | Bethel Price Solar, LLC | Bethel, NC | 6.5 GWh |
#2417 | Holdrege Solar Center | Lincoln, NE | 6.5 GWh |
#2418 | Lawrence Creek Solar | Shafer, MN | 6.5 GWh |
#2419 | Waihonu North Solar | Mililani, HI | 6.4 GWh |
#2420 | Fairmont-FLS 100 | Fairmont, NC | 6.4 GWh |
#2421 | Hecate Energy West Newberry, LLC | Newberry, SC | 6.4 GWh |
#2422 | Millersport GM 1 | Amherst, NY | 6.4 GWh |
#2423 | Lincoln WWTF Hybrid | Lincoln, CA | 6.4 GWh |
#2424 | Forest Lake Solar CSG | Scandia, MN | 6.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clear Solar I, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
233 Randolph 74 Solar I, LLC | Shelby, NC | 3.7 GWh | 14.2 mi |
Amethyst Solar | Forest City, NC | 5.9 GWh | 4.8 mi |
Audrey Solar | Shelby, NC | 4.9 GWh | 12.5 mi |
Ayrshire | Shelby, NC | 35.4 GWh | 12.9 mi |
Beetle Solar | Mooresboro, NC | 6.0 GWh | 13.4 mi |
Broad River Solar, LLC | Mooresboro, NC | 91.9 GWh | 9.8 mi |
Charlotte Solar | Forest City, NC | 9.4 GWh | 3.4 mi |
Gamble Solar | Bostic, NC | 6.0 GWh | 3.1 mi |
Innovative Solar 15, LLC | Ellenboro, NC | 3.1 GWh | 4.4 mi |
Innovative Solar 18, LLC | Bostic, NC | 3.3 GWh | 5.5 mi |
James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh | 7.7 mi |
Lincoln Solar, LLC (NC) | Bostic, NC | 9.2 GWh | 5.1 mi |
Old Caroleen Solar Farm | Forest City, NC | 3.8 GWh | 1.8 mi |
Ruff Solar LLC | Ellenboro, NC | 42.0 GWh | 4.5 mi |
Rutherford Farm | Forest City, NC | 137.8 GWh | 3.5 mi |
Shelby Randolph Road Solar 1, LLC | Shelby, NC | 3.4 GWh | 14.3 mi |
Shelby Solar Energy Generation Facility | Shelby, NC | 1.1 GWh | 14.4 mi |
Sophie Solar | Mooresboro, NC | 8.1 GWh | 8.2 mi |
Spartanburg Water System | Chesnee, SC | 2.0 GWh | 15.4 mi |
Warbler Holdings | Shelby, NC | 7.6 GWh | 12.3 mi |