Clean Energy Future-Lordstown, LLC
1853 Henn Parkway, Lordstown, OH 44481Plant Summary Information
Clean Energy Future-Lordstown, LLC is ranked #10 out of 183 power plants in Ohio in terms of total annual net electricity generation.
Clean Energy Future-Lordstown, LLC is comprised of 3 generators and generated 1.7 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Clean Energy Future-Lordstown, LLC |
---|---|
Utility Name | Clean Energy Future-Lordstown, LLC |
Location | Trumbull County, OH |
Initial Operation Date | October 2018 |
Last Update | Sep 2024 |
Annual Generation | 6.5 TWh |
Annual Consumption | 46.8 M MMBtu |
Ranked #148 out of 11,852 Power Plants Nationwide | |
Ranked #62 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #10 out of 183 Ohio Power Plants | |
Ranked #6 out of 54 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Clean Energy Future-Lordstown, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clean Energy Future-Lordstown, LLC.
Monthly Net Generation for Clean Energy Future-Lordstown, LLC
Clean Energy Future-Lordstown, LLC Details
Summary Information | |
---|---|
Plant Name | Clean Energy Future-Lordstown, LLC (60376) |
Plant Address | 1853 Henn Parkway, Lordstown, OH 44481 |
Utility | Clean Energy Future-Lordstown, LLC (60170) |
Latitude, Longitude | 41.14889, -80.85162 |
Generation Dates on File | Jul 2018 to Sep 2024 |
Initial Operation Date | October 2018 |
Annual Generation | 6.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Systems Inc (56162) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | EAST OHIO GAS COMP DOMINION EAST OH |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG1 Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | PJM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM |
Nameplate Capacity | 311 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 271.9 MW |
Winter Capacity | 308.3 MW |
Minimum Load | 121 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2023 |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | PJM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM |
Nameplate Capacity | 311 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 270.7 MW |
Winter Capacity | 308.5 MW |
Minimum Load | 121 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2023 |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC01 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | PJM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM |
Nameplate Capacity | 340 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 321.4 MW |
Winter Capacity | 328.6 MW |
Minimum Load | 136 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2023 |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Clean Energy Future-Lordstown, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#52 | Tenaska Westmoreland Generating Station | Smithton, PA | 6.7 TWh |
#53 | Chouteau | Pryor, OK | 6.7 TWh |
#54 | Victor J Daniel Jr | Escatawpa, MS | 8.2 TWh |
#55 | Chuck Lenzie Generating Station | Apex, NV | 6.6 TWh |
#56 | Waterford Power, LLC | Waterford, OH | 6.6 TWh |
#57 | Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh |
#58 | Oregon Clean Energy Center | Oregon, OH | 6.6 TWh |
#59 | Dania Beach 7 | Ft. Lauderdale, FL | 6.6 TWh |
#60 | Marcus Hook Energy LP | Marcus Hook, PA | 6.6 TWh |
#61 | Magnolia Power Plant | Ashland, MS | 6.5 TWh |
#63 | Hamilton Patriot Generation Plant | Montgomery, PA | 6.4 TWh |
#64 | Cape Canaveral | Cocoa, FL | 6.3 TWh |
#65 | Allen | Memphis, TN | 6.2 TWh |
#66 | P L Bartow | St. Petersburg, FL | 6.2 TWh |
#67 | Bethlehem Power Plant | Bethlehem, PA | 6.1 TWh |
#68 | Montgomery County | Willis, TX | 6.1 TWh |
#69 | Belews Creek | Belews Creek, NC | 8.9 TWh |
#70 | Midlothian Energy Facility | Midlothian, TX | 6.0 TWh |
#71 | Santan | Gilbert, AZ | 6.0 TWh |
#72 | Hamilton Liberty | Towanda, PA | 6.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clean Energy Future-Lordstown, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.9 GWh | 37.3 mi |
Beaver Solar LLC | Beaver, PA | 514.0 MWh | 41.9 mi |
Beaver Valley | Shippingport, PA | 15.2 TWh | 42.5 mi |
Beaver Valley Patterson Dam | Beaver Falls, PA | 4.8 GWh | 39.5 mi |
Carroll County Energy | Carrollton, OH | 5.3 TWh | 39.2 mi |
Clevelandcliffs Warren | Warren, OH | 53.3 GWh | 4.7 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 707.0 MWh | 32.4 mi |
Foxconn Ohio | Warren, OH | 2.0 GWh | 1.7 mi |
General Electric Diesel Engine Plant | Grove City, PA | 5.6 GWh | 38.8 mi |
Hickory Run Energy Station | New Castle, PA | 5.7 TWh | 24.4 mi |
IGS AKC1 | Akron, OH | 2.3 GWh | 38.6 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 9 mi |
Mahoning | New Springfield, OH | 28.9 GWh | 21.3 mi |
New Castle Plant | West Pittsburg, PA | 898.1 GWh | 29.1 mi |
Niles RTO BTM | Niles, OH | 418.0 MWh | 5.3 mi |
Pine 1 Solar | Hookstown, PA | 623.0 MWh | 42.1 mi |
Pine 2 Solar | Hookstown, PA | 978.0 MWh | 41.9 mi |
South Field Energy | Wellsville, OH | 8.6 TWh | 36.6 mi |
Summit Street Power Plant | Kent, OH | 31.3 GWh | 25.5 mi |
Townsend Hydro | New Brighton, PA | 17.6 GWh | 40.1 mi |