Clayville
4087 S Lincoln Avenue, Vineland, NJ 8361Plant Summary Information
Clayville is ranked #23 out of 378 power plants in New Jersey in terms of total annual net electricity generation.
Clayville is comprised of 1 generator and generated 20.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Clayville |
---|---|
Utility Name | City of Vineland - (NJ) |
Location | Cumberland County, NJ |
Initial Operation Date | November 2015 |
Last Update | Dec 2023 |
Annual Generation | 87.4 GWh |
Annual Consumption | 885.8 k MMBtu |
Ranked #3,324 out of 11,835 Power Plants Nationwide | |
Ranked #936 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #23 out of 378 New Jersey Power Plants | |
Ranked #17 out of 55 New Jersey Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Clayville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clayville.
Monthly Net Generation for Clayville
Clayville Details
Summary Information | |
---|---|
Plant Name | Clayville (58235) |
Plant Address | 4087 S Lincoln Avenue, Vineland, NJ 8361 |
Utility | City of Vineland - (NJ) (19856) |
Latitude, Longitude | 39.42444, -75.02 |
Generation Dates on File | Nov 2015 to Dec 2023 |
Initial Operation Date | November 2015 |
Annual Generation | 87.4 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTH JERSEY GAS COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating November 2015
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | LINCOLN3 |
Nameplate Capacity | 73 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 55 MW |
Winter Capacity | 61 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2015 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Clayville Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#926 | Bellingham Cogeneration Facility | Bellingham, MA | 102.2 GWh |
#927 | Anson County Generation Facility | Lilesville, NC | 92.2 GWh |
#928 | Castleton Energy Center | Castleton, NY | 89.9 GWh |
#929 | Archbald Power Station | Archbald, PA | 112.6 GWh |
#930 | Washington County Power LLC | Sandersville, GA | 88.5 GWh |
#931 | Niland Gas Turbine Plant | Niland, CA | 88.4 GWh |
#932 | Pea Ridge | Pace, FL | 88.4 GWh |
#933 | Stillwater Energy Center | Stillwater, OK | 88.4 GWh |
#934 | Friendswood Energy | Houston, TX | 88.2 GWh |
#935 | Wayne County | Goldsboro, NC | 90.7 GWh |
#937 | Macon Energy Center | Macon, MO | 87.3 GWh |
#938 | Howard Down | Vineland, NJ | 87.2 GWh |
#939 | Mooreland | Mooreland, OK | 86.8 GWh |
#940 | Ashdown | Ashdown, AR | 561.1 GWh |
#941 | Iowa State University | Ames, IA | 86.8 GWh |
#942 | Winchester Power Park | Winchester, TX | 86.2 GWh |
#943 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#944 | Gravel Neck | Surry, VA | 89.3 GWh |
#945 | Jonesboro City Water & Light Plant | Jonesboro, AR | 84.7 GWh |
#946 | NASA Johnson Space Center CHP | Houston, TX | 84.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clayville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.2 GWh | 6.6 mi |
Calpine Vineland Solar LLC | Vineland, NJ | 5.6 GWh | 3.7 mi |
Carlls Corner | Upper Deerfield Twp, NJ | 4.5 GWh | 9.9 mi |
Cedar Branch | Buena Vista Township, NJ | 9.7 GWh | 6.2 mi |
Cornerstone Power Vineland I LLC | Vineland, NJ | 3.9 GWh | 1.7 mi |
Corning Pharmaceutical Glass | Vineland, NJ | 2.9 GWh | 5 mi |
Cumberland (NJ) | Millville, NJ | 65.6 GWh | 4.5 mi |
Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh | 4.3 mi |
DG New Jersey Solar RLS Logistics | Newfield, NJ | 3.8 GWh | 10.4 mi |
Howard Down | Vineland, NJ | 87.2 GWh | 4.5 mi |
KDC Solar ASGM | Bridgeton, NJ | 6.2 GWh | 10.6 mi |
Maple Solar | Vineland, NJ | 3.3 GWh | 4.8 mi |
Millville City Sewer Auth WTP | Millville, NJ | 1.5 GWh | 3.4 mi |
NJ Oak Solar Plant | Bridgetown, NJ | 15.4 GWh | 9.5 mi |
Seabrook Solar Plant | Seabrook, NJ | 8.9 GWh | 11.2 mi |
Sherman Avenue | Vineland, NJ | 32.9 GWh | 2.7 mi |
The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh | 5.7 mi |
The City of Vineland at West Vineland | Vineland, NJ | 3.5 GWh | 3.7 mi |
Vineland Headquarters | Vineland, NJ | 1.2 GWh | 4.6 mi |
Vineland Mays Landing Solar | Millville, NJ | 6.7 GWh | 2.5 mi |