Clay Boswell
1200 NW 3rd St, Cohasset, MN 55721Plant Summary Information
Clay Boswell is ranked #28 out of 132 coal plants nationwide in terms of total annual net electricity generation.
Clay Boswell is comprised of 3 generators and generated 989.3 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Clay Boswell |
---|---|
Utility Name | ALLETE, Inc. |
Location | Itasca County, MN |
Initial Operation Date | July 1958 |
Last Update | Oct 2024 |
Annual Generation | 4.5 TWh |
Annual Consumption | 54.3 M MMBtu |
Ranked #240 out of 11,866 Power Plants Nationwide | |
Ranked #28 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #4 out of 737 Minnesota Power Plants | |
Ranked #2 out of 10 Minnesota Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 99.7% |
Previous Operator |
Minnesota Power Inc (2013 to 2013) ALLETE, Inc. (2014 to 2023) |
Map of Clay Boswell
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clay Boswell.
Monthly Net Generation for Clay Boswell
Clay Boswell Details
Summary Information | |
---|---|
Plant Name | Clay Boswell (1893) |
Plant Address | 1200 NW 3rd St, Cohasset, MN 55721 |
Utility | ALLETE, Inc. (12647) |
Latitude, Longitude | 47.2611, -93.6528 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | July 1958 |
Annual Generation | 4.5 TWh |
Fuel Types | Subbituminous Coal : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | North Blackwater Lake |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | ALLETE, Inc. (12647) MN |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NORTHWEST GAS OF CASS COUNTY |
Natural Gas Storage | No |
Generator 3 Details Operating May 1973
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MP.BOS233 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MP.BOS233 |
Nameplate Capacity | 364.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 352 MW |
Winter Capacity | 352 MW |
Minimum Load | 75 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1973 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Subbituminous Coal / Natural Gas / Refined Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Supercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Generator D4 Details Standby April 1980
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | April 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating May 1980
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | MP.MP_BOS4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MP.MP_BOS4 |
Nameplate Capacity | 558 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 585 MW |
Winter Capacity | 585 MW |
Minimum Load | 185 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Subbituminous Coal / Natural Gas / Refined Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Supercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Clay Boswell Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
ALLETE, Inc. | 30 West Superior Street, Duluth, MN 55802 | Generator 4 | 80.00% |
WPPI Energy | 1425 Corporate Center Drive, Sun Prairie, WI 53590 | Generator 4 | 20.00% |
ALLETE, Inc. | 30 West Superior Street, Duluth, MN 55802 | Generator D4 | 80.00% |
WPPI Energy | 1425 Corporate Center Drive, Sun Prairie, WI 53590 | Generator D4 | 20.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#18 | Jim Bridger | Point of Rocks, WY | 7.9 TWh |
#19 | Independence Steam Electric Station | Newark, AR | 5.5 TWh |
#20 | Belle River | China Twp, MI | 6.2 TWh |
#21 | Comanche (CO) | Pueblo, CO | 5.6 TWh |
#22 | Shawnee | West Paducah, KY | 5.5 TWh |
#23 | La Cygne | La Cygne, KS | 5.5 TWh |
#24 | Jeffrey Energy Center | St. Mary's, KS | 5.3 TWh |
#25 | Limestone | Jewett, TX | 5.1 TWh |
#26 | Elm Road Generating Station | Oak Creek, WI | 6.9 TWh |
#27 | Craig (CO) | Craig, CO | 4.9 TWh |
#29 | Rockport | Rockport, IN | 4.6 TWh |
#30 | Columbia (WI) | Pardeville, WI | 4.3 TWh |
#31 | Weston | Rothschild, WI | 4.0 TWh |
#32 | Welsh | Pittsburg, TX | 3.9 TWh |
#33 | Iatan | Weston, MO | 3.9 TWh |
#34 | Dave Johnston | Glen Rock, WY | 3.7 TWh |
#35 | Gallatin (TN) | Gallatin, TN | 4.0 TWh |
#36 | Plum Point Energy Station | Osceola, AR | 3.1 TWh |
#37 | Coronado | St Johns, AZ | 2.9 TWh |
#38 | Sandy Creek Energy Station | Riesel, TX | 2.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clay Boswell.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brainerd Airport | Brainerd, MN | 10.4 GWh | 64.4 mi |
Brainerd Public Utilities | Brainerd, MN | 10.9 GWh | 66.1 mi |
Fond Du Lac | Duluth, MN | 48.1 GWh | 76.1 mi |
Hibbing | Hibbing, MN | 68.3 GWh | 35.6 mi |
Knife Falls | Cloquet, MN | 9.2 GWh | 67.7 mi |
Laskin Solar | Hoyt Lakes, MN | 8.0 GWh | 71.3 mi |
Moose Lake | Moose Lake, MN | 48.0 MWh | 69.9 mi |
MP CSG 1 LLC | Wrenshall, MN | 1.7 GWh | 74.3 mi |
Pillager | Pillager, MN | 5.7 GWh | 76.2 mi |
Prairie River | Grand Rapids, MN | 1.6 GWh | 7.5 mi |
Rapids Energy Center | Grand Rapids, MN | 34.2 GWh | 5.7 mi |
Sappi Cloquet Mill | Cloquet, MN | 488.9 GWh | 68.5 mi |
Scanlon | Scanlon, MN | 5.5 GWh | 69.4 mi |
Solway CT | Solway, MN | 163.4 GWh | 71.8 mi |
Syl Laskin | Hoyt Lakes, MN | 110.3 GWh | 72.2 mi |
Sylvan | Pillager, MN | 8.0 GWh | 74.4 mi |
Sylvan Solar | Pillager, MN | 12.4 GWh | 73.5 mi |
Taconite Ridge 1 Wind Energy Center | Mountain Iron, MN | 47.4 GWh | 54.1 mi |
Thomson | Carlton, MN | 258.7 GWh | 75 mi |
USS Itasca Clean Energy Solar LLC | Grand Rapids, MN | 3.8 GWh | 7.2 mi |