City of Palo Alto
3201 East Bayshore Road, Palo Alta, CA 94303Plant Summary Information
City of Palo Alto is ranked #346 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
City of Palo Alto is comprised of 4 generators and generated 6.2 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | City of Palo Alto |
---|---|
Utility Name | City of Palo Alto |
Location | Santa Clara County, CA |
Initial Operation Date | March 2002 |
Last Update | Dec 2023 |
Annual Generation | 20.6 MWh |
Annual Consumption | 813 MMBtu |
Ranked #11,670 out of 11,835 Power Plants Nationwide | |
Ranked #2,211 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #1,566 out of 1,569 California Power Plants | |
Ranked #346 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of City of Palo Alto
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for City of Palo Alto.
Monthly Net Generation for City of Palo Alto
City of Palo Alto Details
Summary Information | |
---|---|
Plant Name | City of Palo Alto (57714) |
Plant Address | 3201 East Bayshore Road, Palo Alta, CA 94303 |
Utility | City of Palo Alto (57033) |
Latitude, Longitude | 37.4383, -122.1094 |
Generation Dates on File | Jan 2010 to Dec 2023 |
Initial Operation Date | March 2002 |
Annual Generation | 20.6 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Palo Alto - (CA) (14401) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PALO ALTO CITY OF |
Natural Gas Storage | No |
Generator GEN1 Details Standby March 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PLOALTO_1_N019 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PALALT_7_COBUG |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | March 2002 |
Planned Retirement | January 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Standby March 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PLOALTO_1_N019 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PALALT_7_COBUG |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | March 2002 |
Planned Retirement | January 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Standby March 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PLOALTO_1_N019 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PALALT_7_COBUG |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | March 2002 |
Planned Retirement | January 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Standby March 2002
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PLOALTO_1_N019 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PALALT_7_COBUG |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | March 2002 |
Planned Retirement | January 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
City of Palo Alto Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2201 | West Point Municipal | West Point, NE | 139.0 MWh |
#2202 | Q Plant | San Diego, CA | 27.0 MWh |
#2203 | NRG Chalk Point CT | Aquasco, MD | 894.0 MWh |
#2204 | Oxford (NE) | Oxford, NE | 27.0 MWh |
#2205 | Burlingame | Burlingame, KS | 46.1 MWh |
#2206 | Maquoketa 1 | Maquoketa, IA | 27.0 MWh |
#2207 | Preston (IA) | Preston, IA | 54.0 MWh |
#2208 | Charles P Keller | Rockville Centre, NY | 24.0 MWh |
#2209 | High Street Station | Ipswich, MA | 28.0 MWh |
#2210 | Frank Jenkins | Portland, MI | 101.0 MWh |
#2212 | Water Street Station | Bay City, MI | 204.0 MWh |
#2213 | Rockland Bakery Inc. | Nanuet, NY | 19.0 MWh |
#2214 | Sharon Spring | Sharon Springs, KS | 19.6 MWh |
#2215 | Fitchburg | Madison, WI | 17.0 MWh |
#2216 | State Center | State Center, IA | 53.0 MWh |
#2217 | ITT Cogen Facility | Chicago, IL | 15.7 MWh |
#2218 | Devon Station | Milford, CT | 123.0 MWh |
#2219 | Curtis | Curtis, NE | 17.0 MWh |
#2220 | Pinova Inc. | Brunswick, GA | 718.8 MWh |
#2221 | Moose Lake | Moose Lake, MN | 48.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding City of Palo Alto.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
APP Prune A-D | Cupertino, CA | 27.1 GWh | 9.3 mi |
Apple Campus 2 Fuel Cell | Cupertino, CA | 25.9 GWh | 9.3 mi |
Apple Campus 2 PV | Cupertino, CA | 15.6 GWh | 9.3 mi |
AT&T - Redwood City | Redwood City, CA | 7.0 GWh | 5.8 mi |
AT&T Holger | San Jose, CA | 7.2 GWh | 9.2 mi |
Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 35.9 GWh | 3.5 mi |
Gianera | Santa Clara, CA | 9.9 GWh | 8.1 mi |
Google Moffett Park Solar Project | Sunnyvale, CA | 2.7 GWh | 5.5 mi |
Intel Santa Clara | Santa Clara, CA | 7.3 GWh | 8.8 mi |
JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 8.8 GWh | 5 mi |
Juniper Networks Sunnyvale | Sunnyvale, CA | 5.6 GWh | 5 mi |
Maxim | San Jose, CA | 6.6 GWh | 9.1 mi |
Mission College Blvd. Fuel Cell | Santa Clara, CA | 38.2 GWh | 8.8 mi |
SJ/SC WPCP | San Jose, CA | 81.5 GWh | 8.9 mi |
Solar Star Palo Alto I, LLC | Palo Alto, CA | 2.1 GWh | 2.9 mi |
SRI International Cogen Project | Menlo Park, CA | 26.5 GWh | 3.7 mi |
Stanford Campus Solar | Stanford, CA | 6.1 GWh | 2.8 mi |
Sunnyvale City of WPCP | Sunnyvale, CA | 9.7 GWh | 5.3 mi |
Yahoo! - HQ | Sunnyvale, CA | 4.1 GWh | 4.9 mi |
Zero Waste Energy Development Co LLC | San Jose, CA | 2.3 GWh | 8.6 mi |