City of Bowie
18509 Central Av, Mitchellville, MD 20716Plant Summary Information
City of Bowie is ranked #36 out of 140 solar farms in Maryland in terms of total annual net electricity generation.
City of Bowie generated 948.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | City of Bowie |
---|---|
Utility Name | Tesla Inc. |
Location | Prince George's County, MD |
Initial Operation Date | June 2021 |
Last Update | Dec 2023 |
Annual Generation | 3.8 GWh |
Annual Consumption | 13.7 k MMBtu |
Ranked #8,311 out of 11,835 Power Plants Nationwide | |
Ranked #3,272 out of 5,643 Solar Power Plants Nationwide | |
Ranked #66 out of 179 Maryland Power Plants | |
Ranked #36 out of 140 Maryland Solar Power Plants | |
Fuel Types | Solar |
Map of City of Bowie
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for City of Bowie.
Monthly Net Generation for City of Bowie
City of Bowie Details
Summary Information | |
---|---|
Plant Name | City of Bowie (65130) |
Plant Address | 18509 Central Av, Mitchellville, MD 20716 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 38.90464, -76.68877 |
Generation Dates on File | Jun 2021 to Dec 2023 |
Initial Operation Date | June 2021 |
Annual Generation | 3.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Baltimore Gas & Electric Co (1167) MD |
Grid Voltage | 36.00 kV |
Energy Storage | No |
Generator PV1 Details Operating June 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
City of Bowie Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Weisshorn Solar I, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3262 | Exeter Solar | Exeter, CA | 3.8 GWh |
#3263 | Hinton | Hinton, OK | 3.8 GWh |
#3264 | Boring Solar LLC | Sandy, OR | 3.8 GWh |
#3265 | SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh |
#3266 | Hendershot Solar, LLC | Tecumseh, MI | 3.8 GWh |
#3267 | Pivot Solar 2 LLC (CSG) | Brush, CO | 3.8 GWh |
#3268 | Fountain | Fountain, MN | 3.8 GWh |
#3269 | Lowe Solar Energy Storage | Asheboro, NC | 3.7 GWh |
#3270 | Day Hill Solar, LLC | Estacada, OR | 3.8 GWh |
#3271 | Spencer Meadow Solar Energy Storage | Asheboro, NC | 3.7 GWh |
#3273 | Franklin Solar 2 | Louisburg, NC | 3.8 GWh |
#3274 | SCE-Snowline-White Rd (Central) | Phelan, CA | 3.8 GWh |
#3275 | 20333 Normandie PV, LLC | Torrance, CA | 3.8 GWh |
#3276 | Kearsarge Granby | Granby, MA | 3.8 GWh |
#3277 | May Shannon Solar, LLC | Clio, MI | 3.8 GWh |
#3278 | Grand Ronde Solar | Grand Ronde, OR | 3.8 GWh |
#3279 | Syncarpha El Rito | El Rito, NM | 3.8 GWh |
#3280 | Ramp Solar, LLC | Goldsboro, NC | 3.8 GWh |
#3281 | Bullhead Solar, LLC | Fayette, MI | 3.8 GWh |
#3282 | Steel Bridge Solar, LLC | Sheridan, OR | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding City of Bowie.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Annapolis Solar Park, LLC | Annapolis, MD | 22.8 GWh | 8.6 mi |
Bluefin Origination 1 | Brandywine, MD | 3.8 GWh | 14.1 mi |
Bowie State Solar | Bowie, MD | 362.0 MWh | 8.8 mi |
Bulldog Solar One, LLC | Bowie, MD | 3.4 GWh | 0.9 mi |
FedEx Field Solar Facility | Landover, MD | 3.5 GWh | 9.4 mi |
First Baptist Church of Glenarden | Upper Marlboro, MD | 2.8 GWh | 11.4 mi |
GWCC PV Solar Farm | Beltsville, MD | 2.4 GWh | 14.2 mi |
Holly Spring Meadows | District Heights, MD | 656.0 MWh | 12.4 mi |
MD - CS - BGE - PR24 TPE | Mitchellville, MD | 4.1 GWh | 1.7 mi |
MD - PR97 (CSG) | Bowie, MD | 4.4 GWh | 2.5 mi |
Millersville LFG | Severn, MD | 22.1 GWh | 12.5 mi |
MNCPPC Randall Farm | Upper Marlboro, MD | 2.4 GWh | 8 mi |
OER Checkerspot | Tracy's Landing, MD | 3.0 GWh | 10.4 mi |
OER Monarch CSG | Upper Marlboro, MD | 3.4 GWh | 9.1 mi |
OER Patuxent CSG | Lothian, MD | 4.2 GWh | 4.6 mi |
Sheriff Road | Hyattsville, MD | 1.9 GWh | 11.1 mi |
Sol Phoenix | Capitol Heights, MD | 4.0 GWh | 14.5 mi |
UMCP CHP Plant | College Park, MD | 75.5 GWh | 14.4 mi |
Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.8 GWh | 10 mi |
WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh | 14.9 mi |