City of Boulder WWTP
4049 75th Street, Boulder, CO 80301Plant Summary Information
City of Boulder WWTP is ranked #141 out of 142 solar farms in Colorado in terms of total annual net electricity generation.
City of Boulder WWTP generated 92.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | City of Boulder WWTP |
---|---|
Utility Name | SunE NLB-2, LLC |
Location | Boulder County, CO |
Initial Operation Date | June 2010 |
Last Update | Dec 2023 |
Annual Generation | 867.0 MWh |
Annual Consumption | 3.0 k MMBtu |
Ranked #10,840 out of 11,835 Power Plants Nationwide | |
Ranked #5,419 out of 5,643 Solar Power Plants Nationwide | |
Ranked #262 out of 267 Colorado Power Plants | |
Ranked #141 out of 142 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of City of Boulder WWTP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for City of Boulder WWTP.
Monthly Net Generation for City of Boulder WWTP
City of Boulder WWTP Details
Summary Information | |
---|---|
Plant Name | City of Boulder WWTP (57681) |
Plant Address | 4049 75th Street, Boulder, CO 80301 |
Utility | SunE NLB-2, LLC (57005) |
Latitude, Longitude | 40.04803, -105.18033 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | June 2010 |
Annual Generation | 867.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | EL09-31-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 1 Details Operating June 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
City of Boulder WWTP Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5409 | Castor Solar | Dustin Acres, CA | 917.0 MWh |
#5410 | Hartz Way | Secaucus, NJ | 917.0 MWh |
#5411 | IGS PCW1 | Rossford, OH | 906.0 MWh |
#5412 | IGS Solar I - EWR5 | Avenel, NJ | 903.0 MWh |
#5413 | Maclay Solar Project | Sylmar, CA | 901.5 MWh |
#5414 | Buidling L | Santa Fe Springs, CA | 899.0 MWh |
#5415 | Mariani Packing Vacaville Solar | Vacaville, CA | 891.0 MWh |
#5416 | NEDC Solar Site | Whitinsville, MA | 878.0 MWh |
#5417 | USS Water Fowl Solar LLC CSG | Silver Lake, MN | 875.0 MWh |
#5418 | Bartow Davidson | Cartersville, GA | 869.0 MWh |
#5420 | Edwards Air Force Base | Edwards, CA | 866.0 MWh |
#5421 | Industry MetroLink PV 1 | Industry, CA | 860.0 MWh |
#5422 | Stafford Hill Solar Hybrid | Rutland, VT | 859.0 MWh |
#5423 | IKEA Memphis 508 | Cordova, TN | 856.0 MWh |
#5424 | Phoenix Airport East Economy Lot | Phoenix, AZ | 848.0 MWh |
#5425 | Enfield Community Solar | Ithaca, NY | 848.0 MWh |
#5426 | Sunny Cow Solar, LLC | Bakersfield, CA | 847.0 MWh |
#5427 | ZPD-PT Solar Project 2017-044 LLC CSG | Spencer, MA | 846.0 MWh |
#5428 | Solar Photovoltaic Project #27 | Rialto, CA | 845.1 MWh |
#5429 | Howard Lane Solar | Glocester, RI | 842.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding City of Boulder WWTP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Canyon Hydro | Boulder, CO | 10.6 GWh | 8.6 mi |
Boulder City Betasso Hydro Plant | Boulder, CO | 8.7 GWh | 8.6 mi |
Boulder City Lakewood Hydro | Boulder, CO | 8.7 GWh | 8.6 mi |
Boulder City Silver Lake Hydro | Boulder, CO | 8.0 GWh | 17.4 mi |
Brighton PV Solar Plant | Brighton, CO | 3.1 GWh | 13.5 mi |
Carter Hydro | Berthoud, CO | 10.2 GWh | 19.1 mi |
Front Range Project | Erie, CO | 10.9 GWh | 9.4 mi |
Gross Hydro Plant | Boulder, CO | 10.8 GWh | 11.7 mi |
IBM Solar | Boulder, CO | 13.8 GWh | 3.5 mi |
Jack's Solar Garden | Longmont, CO | 2.1 GWh | 5.8 mi |
Jeffco Community Solar Gardens LLC | Arvada, CO | 2.5 GWh | 13.1 mi |
Lafayette Horizon Solar CSG LLC | Lafayette, CO | 3.1 GWh | 7.7 mi |
Plains End | Arvada, CO | 5.3 GWh | 13.4 mi |
Plains End II LLC | Arvada, CO | 19.9 GWh | 13.3 mi |
Spindle Hill Energy Center | Fort Lupton, CO | 410.6 GWh | 15.8 mi |
SR Mavericks | Mead, CO | 14.8 GWh | 14.9 mi |
TruStile Doors - Denver | Denver, CO | 1.9 GWh | 18.9 mi |
University of Colorado | Boulder, CO | 4.6 GWh | 5.5 mi |
Valmont | Boulder, CO | 15.9 GWh | 2.3 mi |
Valmont Combustion Turbine Project | Boulder, CO | 31.7 GWh | 2.2 mi |