Citrus City
3501 W. Mile 7 Road, Mission, TX 78574Plant Summary Information
Citrus City is ranked #29 out of 47 distillate fuel oil power plants in Texas in terms of total annual net electricity generation.
Citrus City is comprised of 15 generators and generated 150.1 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Citrus City |
---|---|
Utility Name | Power Depot Group A, LLC |
Location | Hidalgo County, TX |
Initial Operation Date | August 2013 |
Last Update | Dec 2023 |
Annual Generation | 645.0 MWh |
Annual Consumption | 6.7 k MMBtu |
Ranked #10,968 out of 11,852 Power Plants Nationwide | |
Ranked #482 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #624 out of 754 Texas Power Plants | |
Ranked #29 out of 47 Texas Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Citrus City
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Citrus City.
Monthly Net Generation for Citrus City
Citrus City Details
Summary Information | |
---|---|
Plant Name | Citrus City (65536) |
Plant Address | 3501 W. Mile 7 Road, Mission, TX 78574 |
Utility | Power Depot Group A, LLC (64812) |
Latitude, Longitude | 26.321, -98.35174 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | August 2013 |
Annual Generation | 645.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator CC1 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC10 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC11 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC12 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC13 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC14 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC15 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC2 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC3 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC4 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC5 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC6 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC7 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC8 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CC9 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Citrus City Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#472 | St George Red Rock | St George, UT | 675.0 MWh |
#473 | Goldsmith | Goldsmith, TX | 670.0 MWh |
#474 | Naval Submarine Base Kings Bay | Kings Bay, GA | 668.0 MWh |
#475 | South Main Street | Rochelle, IL | 667.0 MWh |
#476 | Cleveland Cnty Generating Facility | Kings Mountain, NC | 640.9 GWh |
#477 | NCSU Cates Cogeneration Plant | Raleigh, NC | 76.4 GWh |
#478 | Craig (CO) | Craig, CO | 5.0 TWh |
#479 | Virginia Beach | Virginia Beach, VA | 4.2 GWh |
#480 | Rockwood | Brawley, CA | 3.9 GWh |
#481 | Sumner | Sumner, IA | 655.0 MWh |
#483 | Frankel | Andrews, TX | 645.0 MWh |
#484 | Morgantown Generating Plant | Newburg, MD | 641.0 MWh |
#485 | Covanta Haverhill | Haverhill, MA | 345.6 GWh |
#486 | Covanta Hempstead | Westbury, NY | 590.5 GWh |
#487 | Southampton Power Station | Franklin, VA | 340.0 GWh |
#488 | Maple Lake | Maple Lake, MN | 622.1 MWh |
#489 | Milford | Milford, IA | 616.0 MWh |
#490 | Marion | Marion, IL | 767.9 GWh |
#491 | East River | New York, NY | 2.9 TWh |
#492 | Marshall Energy Facility | Calvert City, KY | 61.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Citrus City.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Frontera Energy Center | Mission, TX | 2.0 TWh | 8.3 mi |
HEB00038 | San Juan, TX | 241.0 MWh | 14.2 mi |
Hidalgo Energy Center | Edinburg, TX | 2.0 TWh | 11 mi |
Hidalgo Wind Farm II | Edinburg, TX | 132.9 GWh | 13.3 mi |
Hidalgo Wind Farm LLC | McCook, TX | 687.8 GWh | 10.6 mi |
Los Vientos V Wind Power | Rio Grande City, TX | 334.6 GWh | 15 mi |
Los Vientos Windpower III | Rio Grande City, TX | 451.3 GWh | 28.5 mi |
Los Vientos Windpower IV | Rio Grande City, TX | 475.5 GWh | 29.2 mi |
Magic Valley Generating Station | Edinburg, TX | 2.5 TWh | 10.1 mi |
Mesteno | Rio Grande City, TX | 411.4 GWh | 28.1 mi |
Raymond Wind Farm, LLC | Lyford, TX | 611.8 GWh | 35.5 mi |
Red Gate Power Plant | Edinburg, TX | 247.7 GWh | 14 mi |
Ridge Rd | Alamo, TX | 684.0 MWh | 18.9 mi |
Rio Grande Valley Sugar Growers | Santa Rosa, TX | 92.0 MWh | 30.2 mi |
Santa Rosa | Santa Rosa, TX | 706.0 MWh | 33.3 mi |
WAL3320 | Palmhurst, TX | 368.0 MWh | 4.7 mi |
WAL3886 | Edinburg, TX | 372.0 MWh | 9.8 mi |
WAL452 | Mcallen, TX | 368.0 MWh | 8.5 mi |
WAL5165 | Alamo, TX | 391.0 MWh | 16.5 mi |
West Raymond Wind Farm LLC | Lyford, TX | 706.0 GWh | 22.5 mi |