Cimarron Bend Wind Project II, LLC
742 County Road H, Minneola, KS 67831Plant Summary Information
Cimarron Bend Wind Project II, LLC is ranked #20 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Cimarron Bend Wind Project II, LLC generated 195.1 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Cimarron Bend Wind Project II, LLC |
---|---|
Utility Name | Cimarron Bend Wind Project II, LLC |
Location | Clark County, KS |
Initial Operation Date | March 2017 |
Last Update | Oct 2024 |
Annual Generation | 825.2 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #858 out of 11,866 Power Plants Nationwide | |
Ranked #128 out of 1,345 Wind Power Plants Nationwide | |
Ranked #20 out of 152 Kansas Power Plants | |
Ranked #13 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Cimarron Bend Wind Project II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cimarron Bend Wind Project II, LLC.
Monthly Net Generation for Cimarron Bend Wind Project II, LLC
Cimarron Bend Wind Project II, LLC Details
Summary Information | |
---|---|
Plant Name | Cimarron Bend Wind Project II, LLC (60688) |
Plant Address | 742 County Road H, Minneola, KS 67831 |
Utility | Cimarron Bend Wind Project II, LLC (60407) |
Latitude, Longitude | 37.355, -99.991 |
Generation Dates on File | Mar 2017 to Oct 2024 |
Initial Operation Date | March 2017 |
Annual Generation | 825.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Great Plains, LLC (56526) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 2017
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 100 |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-2.0 |
Design Wind Speed | 22 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 328 |
Cimarron Bend Wind Project II, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#118 | Blazing Star 2 Wind Farm | Hendricks, MN | 839.6 GWh |
#119 | Sweetland Wind Farm, LLC | St. Lawrence, SD | 838.4 GWh |
#120 | Kingfisher Wind LLC | Kingfisher, OK | 835.9 GWh |
#121 | O'Brien Wind | Primghar, IA | 834.6 GWh |
#122 | Tecolote Wind LLC | Duran, NM | 830.1 GWh |
#123 | Crowned Ridge Wind II Energy Center | Watertown, SD | 829.4 GWh |
#124 | Blazing Star Wind Farm 1 | Hendricks, MN | 829.3 GWh |
#125 | Southern Hills Wind Farm | Creston, IA | 828.8 GWh |
#126 | Roundhouse Wind Energy Project | Cheyenne, WY | 828.7 GWh |
#127 | Las Majadas Wind Farm | Santa Monica, TX | 825.5 GWh |
#129 | Burke Wind, LLC | Bowbells, ND | 824.0 GWh |
#130 | Horse Creek Wind Farm | Weinert, TX | 818.8 GWh |
#131 | Upstream Wind Energy LLC | Neligh, NE | 817.8 GWh |
#132 | Lower Snake River Wind Energy Project | Pomeroy, WA | 817.6 GWh |
#133 | Crocker Wind Farm | Conde, SD | 813.2 GWh |
#134 | Bluestem | Beaver, OK | 810.5 GWh |
#135 | Ledyard Windpower, LLC | Lakota, IA | 810.2 GWh |
#136 | Sunflower Energy Center, LLC | Peabody, KS | 810.1 GWh |
#137 | Heartland Divide II | Audubon, IA | 807.6 GWh |
#138 | Lundgren Wind Project | Otho, IA | 805.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cimarron Bend Wind Project II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashland | Ashland, KS | 27.0 MWh | 16.8 mi |
Bloom Wind | Minneola, KS | 669.0 GWh | 9.8 mi |
Buffalo Bear LLC | Woodward, OK | 21.8 GWh | 44.5 mi |
Cimarron Bend III | Minneola, KS | 543.2 GWh | 1.1 mi |
Cimarron Bend Wind Project I, LLC | Minneola, KS | 852.5 GWh | 0 mi |
Cimarron River | Liberal, KS | 25.8 GWh | 44.5 mi |
Cimarron Wind Energy LLC | Cimmaron, KS | 463.7 GWh | 39.2 mi |
Cimarron Windpower II | Cimarron, KS | 475.5 GWh | 43.1 mi |
Ensign Wind LLC | Montezuma, KS | 483.0 GWh | 23.9 mi |
Fort Dodge | Dodge City, KS | 104.8 GWh | 26.2 mi |
Gray County Wind Energy | Montezuma, KS | 304.3 GWh | 27.7 mi |
Greensburg | Greensburg, KS | 13.0 GWh | 37.9 mi |
Iron Star Wind Project | Dodge City, KS | 1.2 TWh | 20.3 mi |
Ironwood Wind | Spearville, KS | 514.3 GWh | 34.1 mi |
Laverne Diesel Generating Plant | Laverne, OK | 283.0 MWh | 44.9 mi |
Meade | Meade, KS | 105.0 MWh | 19.4 mi |
Shooting Star | Mullinville, KS | 192.4 GWh | 32 mi |
Spearville | Ford, KS | 208.9 GWh | 37.5 mi |
Spearville 3 LLC | Spearville, KS | 198.2 GWh | 35.3 mi |
Western Plains Wind Farm | Spearville, KS | 1.1 TWh | 38.5 mi |