CII Methane Management IV, LLC
680 County Home Road, Smithfield, NC 27577Plant Summary Information
CII Methane Management IV, LLC is ranked #14 out of 18 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
CII Methane Management IV, LLC is comprised of 1 generator and generated 2.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | CII Methane Management IV, LLC |
---|---|
Utility Name | Frontier Operation Services |
Location | Johnston County, NC |
Initial Operation Date | June 2014 |
Last Update | Dec 2023 |
Annual Generation | 7.9 GWh |
Annual Consumption | 99.9 k MMBtu |
Ranked #6,654 out of 11,852 Power Plants Nationwide | |
Ranked #246 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #534 out of 863 North Carolina Power Plants | |
Ranked #14 out of 18 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operator |
ENERGYneering Solutions, Inc (2014 to 2018) Frontier Operation Services (2019 to 2023) |
Map of CII Methane Management IV, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CII Methane Management IV, LLC.
Monthly Net Generation for CII Methane Management IV, LLC
CII Methane Management IV, LLC Details
Summary Information | |
---|---|
Plant Name | CII Methane Management IV, LLC (59711) |
Plant Address | 680 County Home Road, Smithfield, NC 27577 |
Utility | Frontier Operation Services (63199) |
Latitude, Longitude | 35.5119, -78.43379 |
Generation Dates on File | Jun 2014 to Dec 2023 |
Initial Operation Date | June 2014 |
Annual Generation | 7.9 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | Pending |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator GEN1 Details Operating June 2014
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
CII Methane Management IV, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#236 | Hardin County LFGTE | Elizabethtown, KY | 8.9 GWh |
#237 | Norther Tier Landfill | Burlington, PA | 8.8 GWh |
#238 | G2 Energy Marion LLC | Ocala, FL | 8.7 GWh |
#239 | Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 8.6 GWh |
#240 | Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.5 GWh |
#241 | Horry Land Fill Gas Site | Conway, SC | 8.4 GWh |
#242 | Terreva Wayne County RNG, LLC | Dudley, NC | 8.2 GWh |
#243 | MM Taunton Energy | Taunton, MA | 8.1 GWh |
#244 | Sonoma Central Landfill Phase I | Petaluma, CA | 8.1 GWh |
#245 | Waste Management Northern Oaks LFGTE | Harrison, MI | 8.0 GWh |
#247 | Prairie Bluff | Houston, MS | 7.8 GWh |
#248 | Flathead Landfill to Gas Energy Facility | Kalispell, MT | 7.8 GWh |
#249 | White Street Renewables | Greensboro, NC | 14.1 GWh |
#250 | COC Surry LFG, LLC | Mount Airy, NC | 7.6 GWh |
#251 | Henrico | Glen Allen, VA | 7.3 GWh |
#252 | Sonoma Central Landfill Phase II | Petaluma, CA | 6.6 GWh |
#253 | Mas Durham Power, LLC | Durham, NC | 6.6 GWh |
#254 | Grand River | Grand Ledge, MI | 6.4 GWh |
#255 | Twin Bridges LFGTE | Danville, IN | 6.1 GWh |
#256 | Waste Mangement Redwood LFGTE | Novato, CA | 5.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CII Methane Management IV, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
315 Vinson Road | Clayton, NC | 4.4 GWh | 8.6 mi |
4Oaks | Four Oaks, NC | 8.3 GWh | 5.6 mi |
Banner Solar | Benson, NC | 8.6 GWh | 9.6 mi |
Benson Solar, LLC | Benson, NC | 7.9 GWh | 10.8 mi |
Church Road Solar LLC | Angier, NC | 7.1 GWh | 10.8 mi |
ESA Four Oaks 2 NC LLC | Four Oaks, NC | 3.0 GWh | 6.8 mi |
ESA Selma | Selma, NC | 2.6 GWh | 8.2 mi |
ESA Smithfield | Smithfield, NC | 3.0 GWh | 6.6 mi |
Happy Solar | Four Oaks, NC | 7.3 GWh | 9.1 mi |
HCE Johnston I, LLC | Willow Springs, NC | 3.4 GWh | 9.6 mi |
Keen Farm | Four Oaks, NC | 8.8 GWh | 6.2 mi |
Langdon Solar Farm, LLC | Four Oaks, NC | 8.7 GWh | 4.6 mi |
Mule Farm Solar, LLC | Benson, NC | 3.7 GWh | 10.4 mi |
Murdock Solar | Clayton, NC | 6.5 GWh | 11.5 mi |
Nitro Solar | Smitfield, NC | 8.5 GWh | 7 mi |
Powatan Road Solar | Clayton, NC | 4.2 GWh | 7.1 mi |
Red Toad 1425 A Powatan Road, LLC | Clayton, NC | 3.7 GWh | 7.3 mi |
Red Toad 4451 Buffalo Road, LLC | Selma, NC | 4.0 GWh | 8.3 mi |
Red Toad 5840 Buffalo Road, LLC | Selma, NC | 4.4 GWh | 8.5 mi |
Wellons Farm | Smithfield, NC | 9.2 GWh | 8 mi |