Chief Joseph
Hayden Rd, Bridgeport, WA 98813Plant Summary Information
Chief Joseph is ranked #3 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Chief Joseph is comprised of 27 generators and generated 2.5 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Chief Joseph |
---|---|
Utility Name | USACE Northwestern Division |
Location | Douglas County, WA |
Initial Operation Date | September 1955 |
Last Update | Sep 2024 |
Annual Generation | 9.0 TWh |
Annual Consumption | 32.3 M MMBtu |
Ranked #77 out of 11,852 Power Plants Nationwide | |
Ranked #3 out of 1,371 Water Power Plants Nationwide | |
Ranked #3 out of 134 Washington Power Plants | |
Ranked #2 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Chief Joseph
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chief Joseph.
Monthly Net Generation for Chief Joseph
Chief Joseph Details
Summary Information | |
---|---|
Plant Name | Chief Joseph (3921) |
Plant Address | Hayden Rd, Bridgeport, WA 98813 |
Utility | USACE Northwestern Division (19400) |
Latitude, Longitude | 47.9951, -119.6404 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | September 1955 |
Annual Generation | 9.0 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator 9 Details Operating December 1955
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 10 Details Operating September 1955
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 11 Details Operating September 1955
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 12 Details Operating September 1955
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 7 Details Operating November 1956
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1956 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 6 Details Operating December 1956
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1956 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 8 Details Operating September 1956
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1956 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 16 Details Operating November 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 13 Details Operating February 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 5 Details Operating February 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 14 Details Operating July 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 15 Details Operating September 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 1 Details Operating October 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4 Details Operating February 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 3 Details Operating May 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 2 Details Operating July 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 88.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 88.2 MW |
Winter Capacity | 88.2 MW |
Minimum Load | 47.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 19 Details Operating November 1977
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1977 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 17 Details Operating July 1977
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1977 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 18 Details Operating August 1977
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1977 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 20 Details Operating June 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 21 Details Operating June 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 22 Details Operating June 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 23 Details Operating September 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 24 Details Operating January 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 25 Details Operating January 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 26 Details Operating February 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 27 Details Operating May 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1979 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Chief Joseph Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.8 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chief Joseph.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Camas Solar Project | Ellensburg, WA | 10.3 GWh | 82.3 mi |
Chelan | Wenatchee, WA | 305.8 GWh | 20.5 mi |
Grand Coulee | Grand Coulee, WA | 15.0 TWh | 30.8 mi |
Kettle Falls Generating Station | Kettle Falls, WA | 335.1 GWh | 82.5 mi |
Little Falls (WA) | Ford, WA | 175.8 GWh | 80.7 mi |
Main Canal Headworks | Coulee City, WA | 118.7 GWh | 30.6 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 58.9 mi |
Penstemon Solar Project | Ellensburg, WA | 10.4 GWh | 82.3 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 72.2 mi |
Rock Island | Wenatchee, WA | 2.0 TWh | 49.5 mi |
Rocky Reach | Wenatchee, WA | 4.8 TWh | 44.1 mi |
Ross | Rockport, WA | 407.9 GWh | 83 mi |
Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh | 76.9 mi |
Summer Falls Power Plant | Coulee City, WA | 447.2 GWh | 37.7 mi |
Swauk Wind LLC | Thorp, WA | 6.0 GWh | 78.7 mi |
Urtica Solar Project | Ellensburg, WA | 11.4 GWh | 78.5 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 231.6 GWh | 76.2 mi |
Wanapum | Beverly, WA | 4.0 TWh | 79 mi |
Wells | Pateros, WA | 3.4 TWh | 10.9 mi |
Wild Horse | Ellensburg, WA | 589.0 GWh | 71.3 mi |