Chicot Solar
2186 Highway 65 North, Lake Village, AR 71653Plant Summary Information
Chicot Solar is ranked #24 out of 77 power plants in Arkansas in terms of total annual net electricity generation.
Chicot Solar generated 64.5 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Chicot Solar |
---|---|
Utility Name | Chicot Solar, LLC |
Location | Chicot County, AR |
Initial Operation Date | September 2020 |
Last Update | Oct 2024 |
Annual Generation | 214.9 GWh |
Annual Consumption | 786.4 k MMBtu |
Ranked #2,240 out of 11,866 Power Plants Nationwide | |
Ranked #258 out of 5,672 Solar Power Plants Nationwide | |
Ranked #24 out of 77 Arkansas Power Plants | |
Ranked #4 out of 31 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Chicot Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chicot Solar.
Monthly Net Generation for Chicot Solar
Chicot Solar Details
Summary Information | |
---|---|
Plant Name | Chicot Solar (63295) |
Plant Address | 2186 Highway 65 North, Lake Village, AR 71653 |
Utility | Chicot Solar, LLC (63073) |
Latitude, Longitude | 33.479, -91.349 |
Generation Dates on File | Sep 2020 to Oct 2024 |
Initial Operation Date | September 2020 |
Annual Generation | 214.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator CHICO Details Operating September 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 140 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chicot Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#248 | Assembly Solar II LLC | Lennon, MI | 227.6 GWh |
#249 | Wapello Solar LLC | Wapello, IA | 226.8 GWh |
#250 | SR Lumpkin | Lumpkin, GA | 226.5 GWh |
#251 | Lockhart Solar PV, LLC | Hinkley, CA | 225.3 GWh |
#252 | Raceway Solar & Storage | Lancaster, CA | 218.0 GWh |
#253 | Crooked Lake Solar, LLC | Blytheville, AR | 222.5 GWh |
#254 | OE_ESCL | Grants, NM | 219.9 GWh |
#255 | Scarlet Solar (CA) | Fresno, CA | 216.1 GWh |
#256 | Black Bear Solar 1 | Montgomery, AL | 215.7 GWh |
#257 | Albemarle Beach Solar | Roper, NC | 215.1 GWh |
#259 | Yellow Pine II | Enterprise, NV | 208.3 GWh |
#260 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#261 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#262 | Cutlass Solar 1 LLC | Richmond, TX | 212.8 GWh |
#263 | Iron Springs Solar, LLC | Cedar City, UT | 212.7 GWh |
#264 | Escalante Solar II, LLC | Milford, UT | 211.9 GWh |
#265 | Escalante Solar I, LLC | Milford, UT | 211.1 GWh |
#266 | Point Beach Solar | Two Creeks, WI | 210.6 GWh |
#267 | Butler Solar Project 103 | Butler, GA | 210.3 GWh |
#268 | Granite Mountain Solar East, LLC | Cedar City, UT | 210.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chicot Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 36.7 mi |
C&L | Star City, AR | 2.2 GWh | 49.6 mi |
CF Industries Yazoo City Complex | Yazoo City, MS | 144.1 GWh | 68.8 mi |
Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh | 17 mi |
Crossett Solar | AR | 27.6 GWh | 43.5 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 66.4 mi |
Dam 2 | Dumas, AR | 342.3 GWh | 35.1 mi |
General Dynamics | Hampton, AR | 3.4 GWh | 69.2 mi |
Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh | 43 mi |
Gerald Andrus | Greenville, MS | 221.5 GWh | 16.1 mi |
Harvest Gold Solar | Indianola, MS | 63.4 GWh | 41.1 mi |
L L Wilkins | Clarksdale, MS | 90.0 MWh | 66.4 mi |
Oak Ridge Solar | Oak Ridge, LA | 397.3 GWh | 67.4 mi |
Ouachita | Sterlington, LA | 5.0 TWh | 67.7 mi |
Perryville Power Station | Sterlington, LA | 3.9 TWh | 66.8 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.2 TWh | 60.1 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 60.5 mi |
Prairie Mist Solar | Montrose, AR | 21.8 GWh | 24.1 mi |
Stuttgart Solar | Stuttgart, AR | 157.2 GWh | 66.6 mi |
Sunflower County | Ruleville, MS | 119.1 GWh | 50.6 mi |