Chicopee Solar
467 Pendleton Ave, Chicopee, MA 1020Plant Summary Information
Chicopee Solar is ranked #132 out of 463 solar farms in Massachusetts in terms of total annual net electricity generation.
Chicopee Solar generated 1.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Chicopee Solar |
---|---|
Utility Name | Citizens Enterprises Corporation |
Location | Hampden County, MA |
Initial Operation Date | December 2013 |
Last Update | Dec 2022 |
Annual Generation | 5.2 GWh |
Annual Consumption | 18.7 k MMBtu |
Ranked #7,411 out of 11,249 Power Plants Nationwide | |
Ranked #2,569 out of 5,158 Solar Power Plants Nationwide | |
Ranked #207 out of 573 Massachusetts Power Plants | |
Ranked #132 out of 463 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Chicopee Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chicopee Solar.
Monthly Net Generation for Chicopee Solar
Chicopee Solar Details
Summary Information | |
---|---|
Plant Name | Chicopee Solar (59030) |
Plant Address | 467 Pendleton Ave Chicopee, MA 1020 |
Utility | Citizens Enterprises Corporation (58871) |
Latitude, Longitude | 42.18556, -72.5825 |
Generation Dates on File | Jan 2014 to Dec 2022 |
Initial Operation Date | December 2013 |
Annual Generation | 5.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-21-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Chicopee - (MA) (3477) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 0036 Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 3.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chicopee Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Citizens Solar Holdings II MA, LLC | 88 Black Falcon Ave, Suite 342, Boston, MA 2210 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2559 | WED Kingstown Solar I - East Array | Washington, RI | 5.3 GWh |
#2560 | Fairhaven MA 2 | Fairhaven, MA | 5.3 GWh |
#2561 | Dodds (CSG) | Lena, IL | 5.3 GWh |
#2562 | Mauka FIT One | Kahuku, HI | 5.3 GWh |
#2563 | CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 5.2 GWh |
#2564 | Dartmouth | Dartmouth, MA | 5.2 GWh |
#2565 | 3104 Batavia Solar | Batavia, NY | 5.2 GWh |
#2566 | SELCO Community Solar | Shrewsbury, MA | 5.2 GWh |
#2567 | DGS Wasco State Prison | Wasco, CA | 5.2 GWh |
#2568 | Putah Creek Solar Farm North | Winters, CA | 5.2 GWh |
#2570 | KDC Solar CSCP LLC | Freehold, NJ | 5.2 GWh |
#2571 | IFF Hazlet | Hazlet, NJ | 5.2 GWh |
#2572 | Granville Solar PV Power Project | Oxford, NC | 5.2 GWh |
#2573 | SunE Stolee CSG, LLC | Kenyon, MN | 5.2 GWh |
#2574 | Waterloo Solar (IA) | Waterloo, IA | 5.2 GWh |
#2575 | North Stonington Solar Center, LLC | North Stonington, CT | 5.2 GWh |
#2576 | Watervliet PV | Watervliet, MI | 5.2 GWh |
#2577 | Burlington Coat Factory Solar | Florence, NJ | 5.2 GWh |
#2578 | Forest City Solar | Forest City, IA | 5.2 GWh |
#2579 | University of the Pacific | Stockton, CA | 5.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chicopee Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 21.3 GWh | 2.8 mi |
Boatlock | Holyoke, MA | 11.9 GWh | 1.9 mi |
Cabot Holyoke | Holyoke, MA | 2.8 GWh | 1.7 mi |
CED Chicopee Solar | Chicopee, MA | 5.5 GWh | 2.1 mi |
Chemical | Holyoke, MA | 3.8 GWh | 1.5 mi |
Chicopee | Chicopee, MA | 2.8 GWh | 3.7 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.8 GWh | 2 mi |
Chicopee River Solar | Springfield, MA | 3.1 GWh | 2.9 mi |
Cottage Street Solar Facility | Springfield, MA | 4.0 GWh | 3.6 mi |
Dwight | Chicopee, MA | 6.1 GWh | 2.9 mi |
East Springfield Solar PV | Springfield, MA | 2.2 GWh | 3.6 mi |
Front Street | Chicopee, MA | 1.6 GWh | 2.6 mi |
Granby LFG | Granby, MA | 3.5 GWh | 3.4 mi |
Hadley Falls | Holyoke, MA | 184.8 GWh | 2.1 mi |
Ludlow Landfill | Ludlow, MA | 3.4 GWh | 3.8 mi |
Masspower | Indian Orchard, MA | 240.1 GWh | 3.6 mi |
Riverside Holyoke | Holyoke, MA | 23.6 GWh | 1.2 mi |
Smith & Wesson at Springfield MA PV | Springfield, MA | 2.8 GWh | 3.7 mi |
Springfield Solar PV | Springfield, MA | 6.6 GWh | 3.9 mi |
Stony Brook | Ludlow, MA | 24.2 GWh | 3.8 mi |