Chestnut
TBD, Lemoore, CA 93266Plant Summary Information
Chestnut is ranked #38 out of 808 solar farms in California in terms of total annual net electricity generation.
Chestnut generated 57.4 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Chestnut |
---|---|
Utility Name | Chestnut Westside, LLC |
Location | Kings County, CA |
Initial Operation Date | December 2023 |
Last Update | Feb 2025 |
Annual Generation | 377.7 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,607 out of 11,993 Power Plants Nationwide | |
Ranked #125 out of 5,778 Solar Power Plants Nationwide | |
Ranked #121 out of 1,579 California Power Plants | |
Ranked #38 out of 808 California Solar Power Plants | |
Fuel Types | Solar : 95.4% |
Map of Chestnut
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chestnut.
Monthly Net Generation for Chestnut
Chestnut Details
Summary Information | |
---|---|
Plant Name | Chestnut (63849) |
Plant Address | TBD, Lemoore, CA 93266 |
Utility | Chestnut Westside, LLC (63526) |
Latitude, Longitude | 36.16016, -119.90494 |
Generation Dates on File | Jan 2024 to Feb 2025 |
Initial Operation Date | December 2023 |
Annual Generation | 377.7 GWh |
Fuel Types | Solar : 95.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator BESS1 Details Operating December 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 540 |
---|---|
Maximum Charge Rate | 135 MW |
Maximum Discharge Rate | 135 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 135 |
Storage Enclosure Type | CS |
Arbitrage | P |
Frequency Regulation | Yes |
Independent | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator CHNUT Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 150.6 MW |
Summer Capacity | 150.6 MW |
Winter Capacity | 150.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 210 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chestnut Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#115 | Riverstart Solar Park LLC | Modoc, IN | 394.5 GWh |
#116 | RE Garland | Rosamond, CA | 383.7 GWh |
#117 | Shakes Solar | Carrizo Springs, TX | 391.9 GWh |
#118 | Buena Vista Energy Center | Chaparral, NM | 386.3 GWh |
#119 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#120 | Brazoria County Solar Project (Danciger) | Damon, TX | 387.3 GWh |
#121 | Mockingbird Solar Center | Brookston, TX | 387.0 GWh |
#122 | Hillcrest Solar | Mt. Orab, OH | 386.2 GWh |
#123 | Holstein 1 Solar Farm | Wingate, TX | 384.9 GWh |
#124 | Buckthorn Westex | Ft. Stockton, TX | 383.3 GWh |
#126 | Maverick Solar, LLC | Desert Center, CA | 379.5 GWh |
#127 | Solar Gen 2 Solar Facility | Calipatria, CA | 376.5 GWh |
#128 | Madison Fields Solar Project, LLC | Irwin, OH | 372.4 GWh |
#129 | Indiana Crossroads Solar Park | Reynolds, IN | 371.8 GWh |
#130 | Prairie Wolf Solar LLC | Ashmore Township, IL | 371.2 GWh |
#131 | RE Roserock | Fort Stockton, TX | 369.9 GWh |
#132 | Oxbow Solar 1 | New Roads, LA | 368.2 GWh |
#133 | Edwards Sanborn E1B | Mojave, CA | 344.8 GWh |
#134 | Blythe Solar III, LLC Hybrid | Blythe, CA | 349.0 GWh |
#135 | Lund Hill Solar | Bickleton, WA | 361.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chestnut.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Almond | Lemoore, CA | 9.6 GWh | 3.6 mi |
American Kings Solar, LLC | Lemoore, CA | 332.2 GWh | 5.5 mi |
Aquamarine | Lemoore, CA | 469.5 GWh | 2 mi |
Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 328.7 GWh | 11.1 mi |
Henrietta Peaker | Lemoore, CA | 10.3 GWh | 5.5 mi |
Henrietta Solar Project | Lemoore, CA | 234.2 GWh | 6.9 mi |
Huron Solar Station | Huron, CA | 31.3 GWh | 7.2 mi |
Java Solar, LLC | Lemoore, CA | 28.6 GWh | 7.1 mi |
Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh | 7.9 mi |
Lemoore 1 | Lemoore, CA | 232.0 MWh | 9 mi |
Mustang Two | Lemoore, CA | 397.0 GWh | 3.9 mi |
RE Kansas Solar, LLC | Lemoore, CA | 38.7 GWh | 7.2 mi |
RE Kansas South LLC | Lemoore, CA | 51.1 GWh | 6 mi |
RE Kent South, LLC | Lemoore, CA | 40.6 GWh | 4.6 mi |
RE Mustang LLC | Lemoore, CA | 149.9 GWh | 4.3 mi |
Slate Hybrid | Stratford, CA | 681.6 GWh | 4.6 mi |
Solar Blue | Lemoore, CA | 645.6 GWh | 1 mi |
Van der Kooi Dairy Solar Array | Riverdale, CA | 3.9 GWh | 11.2 mi |
Westlands Solar PV Farm | Huron, CA | 37.8 GWh | 9.7 mi |
Westside Solar Power PV1 | Lemoore, CA | 4.6 GWh | 4.1 mi |