Chesterfield
500 Coxendale Road, Chester, VA 23831Plant Summary Information
Chesterfield is ranked #11 out of 212 power plants in Virginia in terms of total annual net electricity generation.
Chesterfield is comprised of 4 generators and generated 513.5 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Chesterfield |
---|---|
Utility Name | Virginia Electric & Power Co |
Location | Chesterfield County, VA |
Initial Operation Date | December 1952 |
Last Update | Sep 2024 |
Annual Generation | 2.3 TWh |
Annual Consumption | 18.4 M MMBtu |
Ranked #484 out of 11,852 Power Plants Nationwide | |
Ranked #298 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #11 out of 212 Virginia Power Plants | |
Ranked #9 out of 37 Virginia Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of Chesterfield
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chesterfield.
Monthly Net Generation for Chesterfield
Chesterfield Details
Summary Information | |
---|---|
Plant Name | Chesterfield (3797) |
Plant Address | 500 Coxendale Road, Chester, VA 23831 |
Utility | Virginia Electric & Power Co (19876) |
Latitude, Longitude | 37.3822, -77.3833 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | December 1952 |
Annual Generation | 2.3 TWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | James River |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
Natural Gas Storage | No |
Generator CT7 Details Operating June 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CH7 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 145 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 135.6 MW |
Winter Capacity | 173.2 MW |
Minimum Load | 68 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1990 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 142 MW |
Net Winter Capacity With Natural Gas | 142 MW |
Net Summer Capacity With Oil | 142 MW |
Net Winter Capacity With Oil | 142 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CW7 Details Operating June 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CH7 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 74.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 51.1 MW |
Winter Capacity | 58.8 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1990 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Generator CT8 Details Operating May 1992
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CH8 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 148 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 136.4 MW |
Winter Capacity | 174.2 MW |
Minimum Load | 63 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1992 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 140 MW |
Net Winter Capacity With Natural Gas | 140 MW |
Net Summer Capacity With Oil | 140 MW |
Net Winter Capacity With Oil | 140 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CW8 Details Operating May 1992
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CH8 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 79.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 58.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 37 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1992 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Chesterfield Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#288 | Coyote Springs II | Boardman, OR | 2.3 TWh |
#289 | Apex Generating Station | Las Vegas, NV | 2.3 TWh |
#290 | Bergen Generating Station | Ridgefield, NJ | 2.3 TWh |
#291 | Dogwood Energy Facility | Pleasant Hill, MO | 2.3 TWh |
#292 | Elk Hills Power LLC | Tupman, CA | 2.3 TWh |
#293 | Quail Run Energy Center | Odessa, TX | 2.3 TWh |
#294 | Ingleside Cogeneration | Houston, TX | 2.3 TWh |
#295 | Possum Point | Dumfries, VA | 2.3 TWh |
#296 | Muskogee | Fort Gibson, OK | 2.7 TWh |
#297 | Rolling Hills Generating | Wilkesville, OH | 2.3 TWh |
#299 | RS Cogen | Lake Charles, LA | 2.3 TWh |
#300 | Jones | Lubbock, TX | 2.3 TWh |
#301 | James E. Rogers Energy Complex | Cliffside, NC | 5.6 TWh |
#302 | Yates | Newnan, GA | 2.2 TWh |
#303 | Gila River Power Block 4 | Gila Bend, AZ | 2.2 TWh |
#304 | Front Range Power Plant | Fountain, CO | 2.2 TWh |
#305 | Lewis Creek | Willis, TX | 2.2 TWh |
#306 | Goldendale Generating Station | Goldendale, WA | 2.2 TWh |
#307 | Mustang Station | Denver City, TX | 2.2 TWh |
#308 | Greater Des Moines | Pleasant Hill, IA | 2.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chesterfield.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boydton Plank Road Cogen Plant Hybrid | Petersburg, VA | 66.0 MWh | 13.8 mi |
Brasfield | Petersburg, VA | 6.8 GWh | 13.6 mi |
Briel Solar Farm | Standston, VA | 41.8 GWh | 11.8 mi |
Caden Energix Rives Road LLC | Petersburg, VA | 28.0 GWh | 14.3 mi |
Charles City | Providence Forge, VA | 54.0 GWh | 14.5 mi |
Chesterfield Landfill Gas | Chester, VA | 24.3 GWh | 6.6 mi |
Darbytown | Richmond, VA | 143.5 GWh | 8.1 mi |
Energix Hollyfield, LLC | Manquin, VA | 25.5 GWh | 23.1 mi |
Fort Powhatan Solar | Disputanta, VA | 318.0 GWh | 18.7 mi |
Henrico | Glen Allen, VA | 7.3 GWh | 22.9 mi |
Hollyfield | Manquin, VA | 29.8 GWh | 23.2 mi |
Hopewell Cogeneration | Hopewell, VA | 1.7 TWh | 8.4 mi |
Hopewell Mill | Hopewell, VA | 285.1 GWh | 8.4 mi |
Hopewell Power Station | Hopewell, VA | 345.0 GWh | 8 mi |
Mechanicsville Solar | Mechanicsville, VA | 52.5 GWh | 21.8 mi |
Park 500 Philip Morris USA | Chester, VA | 13.8 GWh | 6.4 mi |
Philip Morris | Chester, VA | 2.2 GWh | 6 mi |
Richmond Energy | Henrico, VA | 27.3 GWh | 8.6 mi |
Skipjack Solar Center | Wayside, VA | 349.3 GWh | 12.9 mi |
Spruance Operating Services LLC | Richmond, VA | 55.7 GWh | 5.7 mi |