Cherokee Dam

450 POWER HOUSE RD, Rudledge, TN 37861

Plant Summary Information

Cherokee Dam is ranked #25 out of 84 power plants in Tennessee in terms of total annual net electricity generation.

Cherokee Dam is comprised of 4 generators and generated 86.0 GWh during the 3-month period between September 2023 to December 2023.

Plant NameCherokee Dam
Utility NameTennessee Valley Authority
LocationJefferson County, TN
Initial Operation DateApril 1942
Last Update Dec 2023
Annual Generation 301.3 GWh
Annual Consumption 1.1 M MMBtu
Ranked #1,841 out of 11,852 Power Plants Nationwide
Ranked #157 out of 1,371 Water Power Plants Nationwide
Ranked #25 out of 84 Tennessee Power Plants
Ranked #11 out of 28 Tennessee Water Power Plants
Fuel Types Water

Map of Cherokee Dam

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cherokee Dam.

Create Your Account Today

Monthly Net Generation for Cherokee Dam

Cherokee Dam Details

Summary Information
Plant NameCherokee Dam (3397)
Plant Address450 POWER HOUSE RD, Rudledge, TN 37861
UtilityTennessee Valley Authority (18642)
Latitude, Longitude36.16818, -83.49768
Generation Dates on FileJan 2001 to Dec 2023
Initial Operation DateApril 1942
Annual Generation 301.3 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityTennessee Valley Authority (TVA)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceHolston River
Ash Impoundment
Transmission / Distribution OwnerTennessee Valley Authority (18642) TN
Grid Voltage 161.00 kV
Energy StorageNo

Generator 1 Details Operating April 1942

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity33.4 MW
Nameplate Power Factor0.9
Summer Capacity37 MW
Winter Capacity37 MW
Minimum Load14.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 1942
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 3 Details Operating June 1942

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity34.6 MW
Nameplate Power Factor0.9
Summer Capacity39.8 MW
Winter Capacity37.5 MW
Minimum Load14.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1942
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 2 Details Operating January 1953

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity34.6 MW
Nameplate Power Factor0.9
Summer Capacity39.8 MW
Winter Capacity36.1 MW
Minimum Load14.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1953
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 4 Details Operating October 1953

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity32.4 MW
Nameplate Power Factor0.9
Summer Capacity25 MW
Winter Capacity25 MW
Minimum Load14.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 1953
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Cherokee Dam Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#147WaltersWaterville, NC321.0 GWh
#148Richard B RussellElberton, GA318.4 GWh
#149GastonRoanoke Rapids, NC318.0 GWh
#150Millers FerryCamden, AL315.3 GWh
#151Pit 4Big Bend, CA311.4 GWh
#152Robert S KerrKeota, OK309.2 GWh
#153Center HillLancaster, TN308.1 GWh
#154ChelanWenatchee, WA305.8 GWh
#155Bellows FallsBellow Falls, VT304.5 GWh
#156SnettishamJuneau, AK302.1 GWh
#158H M JacksonSultan, WA298.0 GWh
#159Big Creek 2Auberry, CA296.2 GWh
#160BlissBliss, ID295.1 GWh
#161MoronyGreat Falls, MT295.0 GWh
#162Norris DamNorris, TN294.8 GWh
#163Rumford Falls Hydro FacilityRumford, ME290.2 GWh
#164CaminoCamino, CA282.3 GWh
#165HolterWolf Creek, MT281.6 GWh
#166Cordell HullCarthage, TN280.7 GWh
#167Pit 6Montgomery Creek, CA277.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Cherokee Dam.

Plant NamePlant LocationAnnual GenerationDistance
Buffalo Mountain Energy CenterOliver Springs, TN16.2 GWh47.3 mi
Bull RunClinton, TN750.8 GWh38.2 mi
CalderwoodTallassee, TN521.6 GWh54 mi
Chestnut Ridge Gas RecoveryHeiskell, TN22.3 GWh30 mi
ChilhoweeTallassee, TN146.9 GWh53 mi
Douglas DamDandridge, TN364.9 GWh14.4 mi
Fontana DamFontana Dam, NC813.6 GWh52.5 mi
Fort LoudounLenoir City, TN676.5 GWh49.1 mi
Hot Springs Energy Storage & MicrogridHot Springs, NC1.9 GWh42.2 mi
John SevierRogersville, TN4.0 TWh33 mi
Melton HillLenoir City, TN91.5 GWh48.9 mi
Norris DamNorris, TN294.8 GWh33.3 mi
Powell ValleyKyles Ford, TN66.0 MWh38.2 mi
SanteetlahRobbinsville, NC161.4 GWh53.9 mi
SR Greenville ILimestone, TN10.3 GWh45.4 mi
SR Greenville IIGreeneville, TN10.2 GWh42.3 mi
SR JonesboroughJonesborough, TN7.4 GWh54.8 mi
SR Washington I, LLCJonesborough, TN20.2 GWh51.6 mi
University of Tennessee Steam PlantKnoxville, TN34.8 GWh28.3 mi
WaltersWaterville, NC321.0 GWh41.2 mi