Chemical
228 South Water Street, Holyoke, MA 1040Plant Summary Information
Chemical is ranked #22 out of 29 hydroelectric power plants in Massachusetts in terms of total annual net electricity generation.
Chemical is comprised of 2 generators and generated 2.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Chemical |
---|---|
Utility Name | City of Holyoke Gas and Electric Dept. |
Location | Hampden County, MA |
Initial Operation Date | January 1935 |
Last Update | Dec 2023 |
Annual Generation | 7.4 GWh |
Annual Consumption | 26.4 k MMBtu |
Ranked #6,844 out of 11,852 Power Plants Nationwide | |
Ranked #1,055 out of 1,371 Water Power Plants Nationwide | |
Ranked #119 out of 598 Massachusetts Power Plants | |
Ranked #22 out of 29 Massachusetts Water Power Plants | |
Fuel Types | Water |
Map of Chemical
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chemical.
Monthly Net Generation for Chemical
Chemical Details
Summary Information | |
---|---|
Plant Name | Chemical (1604) |
Plant Address | 228 South Water Street, Holyoke, MA 1040 |
Utility | City of Holyoke Gas and Electric Dept. (8776) |
Latitude, Longitude | 42.1919, -72.6097 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1935 |
Annual Generation | 7.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Connecticut River |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Holyoke - (MA) (8774) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 1 Details Operating January 1935
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1935 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating January 1935
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1935 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Chemical Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1045 | Rapids Energy Center | Grand Rapids, MN | 34.2 GWh |
#1046 | Mission | Murphy, NC | 7.8 GWh |
#1047 | Brigham City | Brigham, UT | 7.8 GWh |
#1048 | Pepperell Hydro Power Plant | Pepperell, MA | 7.7 GWh |
#1049 | Prickett | Pelkie, MI | 7.7 GWh |
#1050 | LAC Courte Oreilles Hydroelect | Winter, WI | 7.6 GWh |
#1051 | Central Hudson High Falls | High Falls, NY | 7.6 GWh |
#1052 | San Gabriel Hydro Project | Azusa, CA | 7.5 GWh |
#1053 | Upper Newton Falls | Newton Falls, NY | 7.5 GWh |
#1054 | Forestport | Forestport, NY | 7.4 GWh |
#1056 | Canaan | Canaan, VT | 7.3 GWh |
#1057 | Trego | Hayward, WI | 7.3 GWh |
#1058 | Potholes East Canal 66.0 | Pasco, WA | 7.3 GWh |
#1059 | Spaulding 2 | Emigrant Gap, CA | 7.3 GWh |
#1060 | Halsey | Auburn, CA | 7.3 GWh |
#1061 | Messalonskee 3 | Oakland, ME | 7.3 GWh |
#1062 | Macomb | Malone, NY | 7.3 GWh |
#1063 | Roaring Creek Water Power | Montgomery Creek, CA | 7.3 GWh |
#1064 | Angels | Angels Camp, CA | 7.2 GWh |
#1065 | Strontia Springs Hydro Plant | Littleton, CO | 7.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chemical.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 14.1 GWh | 4.2 mi |
Boatlock | Holyoke, MA | 21.3 GWh | 1.2 mi |
Cabot Holyoke | Holyoke, MA | 6.1 GWh | 0.6 mi |
CED Chicopee Solar | Chicopee, MA | 4.9 GWh | 3.1 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.4 GWh | 2.4 mi |
Chicopee River Solar | Springfield, MA | 3.0 GWh | 4.1 mi |
Chicopee Solar | Chicopee, MA | 4.5 GWh | 1.5 mi |
Cottage Street Solar Facility | Springfield, MA | 2.7 GWh | 4.9 mi |
Dwight | Chicopee, MA | 9.8 GWh | 2.9 mi |
East Springfield Solar PV | Springfield, MA | 1.9 GWh | 4.7 mi |
Front Street | Chicopee, MA | 476.0 MWh | 3.2 mi |
Granby LFG | Granby, MA | 2.9 GWh | 4 mi |
Granby Solar, LLC CSG | Granby, MA | 5.6 GWh | 5.1 mi |
Hadley Falls | Holyoke, MA | 218.2 GWh | 1.4 mi |
Holyoke Solar Cooperative at Mueller | Holyoke, MA | 3.9 GWh | 3.7 mi |
Masspower | Indian Orchard, MA | 609.1 GWh | 5.1 mi |
Riverside Holyoke | Holyoke, MA | 40.4 GWh | 1 mi |
Smith & Wesson at Springfield MA PV | Springfield, MA | 2.3 GWh | 4.8 mi |
Springfield Solar PV | Springfield, MA | 6.2 GWh | 5 mi |
Stony Brook | Ludlow, MA | 25.0 GWh | 5.1 mi |