1001 Airport Road, Chattanooga, TN 37421Plant Summary Information
Chattanooga Metropolitan Airport Solar is ranked #25 out of 29 solar farms in Tennessee in terms of total annual net electricity generation.
Chattanooga Metropolitan Airport Solar generated 541.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Chattanooga Metropolitan Airport Solar |
---|---|
Utility Name | Chattanooga Metropolitan Airport |
Location | Hamilton County, TN |
Initial Operation Date | December 2011 |
Last Update | Dec 2023 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.6 k MMBtu |
Ranked #9,439 out of 11,835 Power Plants Nationwide | |
Ranked #4,222 out of 5,643 Solar Power Plants Nationwide | |
Ranked #78 out of 84 Tennessee Power Plants | |
Ranked #25 out of 29 Tennessee Solar Power Plants | |
Fuel Types | Solar |
Map of Chattanooga Metropolitan Airport Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chattanooga Metropolitan Airport Solar.
Monthly Net Generation for Chattanooga Metropolitan Airport Solar
Chattanooga Metropolitan Airport Solar Details
Summary Information | |
---|---|
Plant Name | Chattanooga Metropolitan Airport Solar (58515) |
Plant Address | 1001 Airport Road, Chattanooga, TN 37421 |
Utility | Chattanooga Metropolitan Airport (58492) |
Latitude, Longitude | 35.02458, -85.20862 |
Generation Dates on File | Jan 2013 to Dec 2023 |
Initial Operation Date | December 2011 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Air Transportation (481) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Chattanooga - (TN) (3408) TN |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator GEN2 Details Operating June 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 1.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator GEN3 Details Operating April 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chattanooga Metropolitan Airport Solar Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4212 | Chicopee Granby Road Solar | Chicopee, MA | 2.4 GWh |
#4213 | New Munich Solar | Melrose, MN | 2.4 GWh |
#4214 | UMES (MD) - Princess Anne | Princess Anne, MD | 2.4 GWh |
#4215 | 301 Chestnut Solar NG | East Longmeadow, MA | 2.4 GWh |
#4216 | Corvias - Fort Riley II | Fort Riley, KS | 2.4 GWh |
#4217 | Americus | Emporia, KS | 2.4 GWh |
#4218 | Fruitland Creek Solar (CSG) | Salem, OR | 2.4 GWh |
#4219 | EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh |
#4220 | CPG - Duke 5300B Holabird | Baltimore, MD | 2.4 GWh |
#4221 | PNA Rossford Solar Array | Rossford, OH | 2.4 GWh |
#4223 | Chesapeake College | Wye Mills, MD | 2.4 GWh |
#4224 | Macedon | Macedon, NY | 2.4 GWh |
#4225 | BWC Swan Pond River CSG | Rehoboth, MA | 2.4 GWh |
#4226 | Timmerman (CSG) | Balaton, MN | 2.4 GWh |
#4227 | JM Huber at Quincy | Quincy, IL | 2.4 GWh |
#4228 | L'Oreal Monmouth | Monmouth Junction, NJ | 2.4 GWh |
#4229 | Coventry Photovoltaic, LLC | Coventry, VT | 2.4 GWh |
#4230 | Page Solar | Willow Spring, NC | 2.4 GWh |
#4231 | Barton Solar Farm | Barton, VT | 2.4 GWh |
#4232 | Canandaigua Solar Array | Canandaigua, NY | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chattanooga Metropolitan Airport Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apalachia | Reliance, TN | 435.9 GWh | 52.6 mi |
Bartow Davidson | Cartersville, GA | 869.0 MWh | 57.2 mi |
Blue Ridge | Blue Ridge, GA | 21.2 GWh | 53.4 mi |
Carters | Chatsworth, GA | 7.4 GWh | 41.6 mi |
Chickamauga | Chattanooga, TN | 657.3 GWh | 5.5 mi |
CS Murphy Point, LLC | Murphy, NC | 1.2 GWh | 59 mi |
Dalton 2 | Dalton, GA | 8.6 GWh | 26.4 mi |
Hiwassee Dam | Murphy, NC | 232.7 GWh | 58.9 mi |
Inland Paperboard Packaging Rome | Rome, GA | 358.0 GWh | 53.8 mi |
McMinnville | McMinnville, TN | 143.0 MWh | 55.9 mi |
Murray Treadwell Farms | Chatsworth, GA | 6.4 GWh | 28.5 mi |
Nickajack | New Hope, TN | 509.6 GWh | 23.4 mi |
Ocoee 1 | Benton, TN | 69.8 GWh | 32.1 mi |
Ocoee 2 | Benton, TN | 80.7 GWh | 40.8 mi |
Ocoee 3 | Benton, TN | 141.4 GWh | 41.2 mi |
Sequoyah | Soddy Daisy, TN | 17.5 TWh | 15.4 mi |
Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh | 27.3 mi |
Volkswagen Solar System | Chattanooga, TN | 11.7 GWh | 6.8 mi |
Watts Bar Hydro | Spring City, TN | 812.4 GWh | 47.5 mi |
Watts Bar Nuclear Plant | Spring City, TN | 19.1 TWh | 46.4 mi |