3461 Hollingswarth Ferry Rd, Franklin, GA 30217

Plant Summary Information

Chattahoochee Energy Facility is ranked #9 out of 238 power plants in Georgia in terms of total annual net electricity generation.

Chattahoochee Energy Facility is comprised of 3 generators and generated 885.5 GWh during the 3-month period between May 2024 to August 2024.

Plant NameChattahoochee Energy Facility
Utility NameOglethorpe Power Corporation
LocationHeard County, GA
Initial Operation DateFebruary 2003
Last Update Aug 2024
Annual Generation 3.3 TWh
Annual Consumption 25.4 M MMBtu
Ranked #348 out of 11,835 Power Plants Nationwide
Ranked #205 out of 2,253 Natural Gas Power Plants Nationwide
Ranked #9 out of 238 Georgia Power Plants
Ranked #5 out of 47 Georgia Natural Gas Power Plants
Fuel Types Natural Gas

Map of Chattahoochee Energy Facility

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chattahoochee Energy Facility.

Create Your Account Today

Monthly Net Generation for Chattahoochee Energy Facility

Chattahoochee Energy Facility Details

Summary Information
Plant NameChattahoochee Energy Facility (7917)
Plant Address3461 Hollingswarth Ferry Rd, Franklin, GA 30217
UtilityOglethorpe Power Corporation (13994)
Latitude, Longitude33.4072, -85.0386
Generation Dates on FileFeb 2003 to Aug 2024
Initial Operation DateFebruary 2003
Annual Generation 3.3 TWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthoritySouthern Company Services, Inc. - Trans (SOCO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceChattahoochee River
Ash Impoundment
Transmission / Distribution OwnerGeorgia Transmission Corp (7197) GA
Grid Voltage 230.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name TRANSCONTINENTAL GAS PIPELINE
Natural Gas StorageNo

Generator 1 Details Operating February 2003

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit Code2224
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
Nameplate Capacity176 MW
Nameplate Power Factor0.85
Summer Capacity145.5 MW
Winter Capacity169.5 MW
Minimum Load65 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2003
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Generator 2 Details Operating February 2003

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit Code2224
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
Nameplate Capacity176 MW
Nameplate Power Factor0.85
Summer Capacity141.5 MW
Winter Capacity167.5 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2003
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Generator 3 Details Operating February 2003

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit Code2224
OwnershipSingle Owner
Duct BurnersYes
Nameplate Capacity187.7 MW
Nameplate Power Factor0.85
Summer Capacity179 MW
Winter Capacity189 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2003
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Chattahoochee Energy Facility Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#195J Lamar Stall UnitShreveport, LA3.4 TWh
#196NorthportNorthport, NY3.4 TWh
#197Lagoon CreekBrownsville, TN3.4 TWh
#198Brunner IslandYork Haven, PA3.6 TWh
#199SabineOrange, TX3.4 TWh
#200CherokeeDenver, CO3.4 TWh
#201West PhoenixPhoenix, AZ3.4 TWh
#202Kings Mountain Energy CenterKings Mountain, NC3.3 TWh
#203Curtis H Stanton Energy CenterOrlando, FL3.3 TWh
#204Empire Generating Co LLCRensselaer, NY3.3 TWh
#206Cedar BayouBaytown, TX3.3 TWh
#207NewmanEl Paso, TX3.3 TWh
#208R D MorrowPurvis, MS3.3 TWh
#209Marshalltown Generating StationMarshalltown, IA3.3 TWh
#210Lost Pines 1 Power ProjectBastrop, TX3.3 TWh
#211Grays Harbor Energy FacilityElma, WA3.2 TWh
#212Hinds Energy FacilityJackson, MS3.2 TWh
#213Athens Generating PlantAthens, NY3.2 TWh
#214Bridgeport StationBridgeport, CT3.2 TWh
#215Wildcat Point Generation FacilityConowingo, MD3.2 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Chattahoochee Energy Facility.

Plant NamePlant LocationAnnual GenerationDistance
Atlanta Falcons SolarAtlanta, GA1.1 GWh43.9 mi
Camp Solar PlantWoodbury, GA3.2 GWh41.9 mi
GreenvilleGreenville, GA1.4 GWh31.2 mi
Harris DamLineville, AL128.9 GWh34.9 mi
Hawk Road FacilityFranklin, GA569.4 GWh4.3 mi
Jack McDonoughSmyrna, GA18.3 TWh43.3 mi
Kimberly-Clark SolarLaGrange, GA2.7 GWh28.1 mi
LaFayette Solar FarmLaFayette, AL166.8 GWh41.9 mi
MAS ASB Cogen PlantAtlanta, GA39.2 GWh40.9 mi
Meriwether JacksonMachester, GA5.9 GWh43.1 mi
RockmartRockmart, GA5.5 GWh42 mi
Sewell Creek EnergyCedartown, GA425.2 GWh39.8 mi
Tenaska Georgia Generation FacilityFranklin, GA214.0 GWh4.5 mi
Troup RC50Pine Mountain, GA4.6 GWh37 mi
Troup RC50 IIPine Mountain, GA2.9 GWh36.1 mi
Turnipseed Solar, LLCDouglasville, GA5.2 GWh28.9 mi
Wansley Combined CycleFranklin, GA8.3 TWh0.1 mi
Wansley Unit 9Franklin, GA3.2 TWh0.1 mi
West Point (GA)West Point, GA198.7 GWh34.9 mi
YatesNewnan, GA2.2 TWh8.9 mi