Charter Durabar at Woodstock
2100 W Lake Shore Dr, Woodstock, IL 62510Plant Summary Information
Charter Durabar at Woodstock is ranked #49 out of 132 solar farms in Illinois in terms of total annual net electricity generation.
Charter Durabar at Woodstock generated 1.1 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Charter Durabar at Woodstock |
---|---|
Utility Name | Luminace Solar Illinois 2, LLC |
Location | McHenry County, IL |
Initial Operation Date | January 2021 |
Last Update | Dec 2022 |
Annual Generation | 4.2 GWh |
Annual Consumption | 15.2 k MMBtu |
Ranked #7,838 out of 11,249 Power Plants Nationwide | |
Ranked #2,896 out of 5,158 Solar Power Plants Nationwide | |
Ranked #176 out of 300 Illinois Power Plants | |
Ranked #49 out of 132 Illinois Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Constellation Solar Illinois 2, LLC (2020 to 2021) Luminace Solar Illinois 2, LLC (2022 to 2022) |
Map of Charter Durabar at Woodstock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Charter Durabar at Woodstock.
Monthly Net Generation for Charter Durabar at Woodstock
Charter Durabar at Woodstock Details
Summary Information | |
---|---|
Plant Name | Charter Durabar at Woodstock (63967) |
Plant Address | 2100 W Lake Shore Dr Woodstock, IL 62510 |
Utility | Luminace Solar Illinois 2, LLC (63511) |
Latitude, Longitude | 42.2899, -88.40712 |
Generation Dates on File | Jan 2021 to Dec 2022 |
Initial Operation Date | January 2021 |
Annual Generation | 4.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator CDB1 Details Operating January 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1 MW |
Virtual Net Metering Agreement | No |
Generator CDB2 Details Operating January 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 1.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Charter Durabar at Woodstock Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2886 | Tuttle | Tuttle, OK | 4.2 GWh |
#2887 | CED Spring Creek Solar | St Anne, IL | 4.2 GWh |
#2888 | New Lisbon Solar | New Lisbon, WI | 4.2 GWh |
#2889 | Citizen B | Mendota, CA | 4.2 GWh |
#2890 | Augusta | Augusta, ME | 4.2 GWh |
#2891 | Rosewood Solar | Goldsboro, NC | 4.2 GWh |
#2892 | AIS Solar Project | Leominster, MA | 4.2 GWh |
#2893 | Warren DPC Solar | Roberts, WI | 4.2 GWh |
#2894 | Ajax Solar | Shannon, NC | 4.2 GWh |
#2895 | Tolson Solar | Tarboro, NC | 4.2 GWh |
#2897 | Ware Avra II | Waycross, GA | 4.2 GWh |
#2898 | 13 Mile Solar, LLC | Battle Creek, MI | 4.2 GWh |
#2899 | City of Tulare Water Facility | Tulare, CA | 25.8 GWh |
#2900 | Geddes 1 Solar, LLC | Saginaw, MI | 4.2 GWh |
#2901 | Redwing Solar | Darlington, SC | 4.2 GWh |
#2902 | Marlow Solar, LLC CSG | Bluford, IL | 4.2 GWh |
#2903 | Abbot Solar | Manning, SC | 4.2 GWh |
#2904 | IMPA Crawfordsville Solar Park | Crawfordsville, IN | 4.2 GWh |
#2905 | Clyde Solar Array | Clyde, OH | 4.2 GWh |
#2906 | Xebec 1 | Sun Valley, CA | 4.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Charter Durabar at Woodstock.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alden Road Harvard Solar 1 | Harvard, IL | 3.8 GWh | 8.9 mi |
Charter Dura-Bar | Woodstock, IL | 9.4 GWh | 0.3 mi |
Elgin Energy Center LLC | Elgin, IL | 138.0 GWh | 21.7 mi |
French Road Solar II | Burlington, IL | 1.1 GWh | 17.4 mi |
Harmony Road Solar | Huntley, IL | 3.1 GWh | 9.1 mi |
Hoffer Plastics | South Elgin, IL | 1.2 GWh | 20.8 mi |
Kish CSG | Cherry Valley, IL | 4.2 GWh | 26.8 mi |
Lafayette 2 - McHenry Franks 1 | Marengo, IL | 4.2 GWh | 10 mi |
Lafayette 2 - McHenry Franks 2 | Huntley, IL | 4.1 GWh | 6.8 mi |
Lake Forest Hospital Central Energy Plant | Lake Forest, IL | 292.0 MWh | 27.9 mi |
Marengo Solar | Marengo, IL | 3.6 GWh | 11.9 mi |
NorthropGrummanSolar(Rolling Meadows,IL) | Rolling Meadows, IL | 1.6 GWh | 23.3 mi |
Northwest Community Hospital | Arlington Heights, IL | 1.5 GWh | 26.2 mi |
Pheasant Run Landfill Gas Recovery | Bristol, WI | 43.3 GWh | 27.4 mi |
Reed Road Solar | Lake In The Hills, IL | 2.1 GWh | 15 mi |
Route 76 Boone Solar 1 | Poplar Grove, IL | 3.4 GWh | 24.1 mi |
Square Barn Solar | Algonquin, IL | 2.3 GWh | 8.8 mi |
SV CSG Lily Lake 2 LLC | Maple Park, IL | 3.8 GWh | 23.4 mi |
USS Sycamore Solar (CSG) | Sycamore, IL | 2.0 GWh | 26.1 mi |
Woodland Landfill Gas Recovery | South Elgin, IL | 20.1 GWh | 22.4 mi |