Champion Wind Farm LLC
1100 County Rd. 140, Roscoe, TX 79545Plant Summary Information
Champion Wind Farm LLC is ranked #162 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Champion Wind Farm LLC generated 68.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Champion Wind Farm LLC |
---|---|
Utility Name | RWE Renewables Americas, LLC |
Location | Nolan County, TX |
Initial Operation Date | February 2008 |
Last Update | Dec 2023 |
Annual Generation | 306.8 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,819 out of 11,852 Power Plants Nationwide | |
Ranked #546 out of 1,345 Wind Power Plants Nationwide | |
Ranked #340 out of 754 Texas Power Plants | |
Ranked #162 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
E ON Climate Renewables N America LLC (2013 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) |
Map of Champion Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Champion Wind Farm LLC.
Monthly Net Generation for Champion Wind Farm LLC
Champion Wind Farm LLC Details
Summary Information | |
---|---|
Plant Name | Champion Wind Farm LLC (56592) |
Plant Address | 1100 County Rd. 140, Roscoe, TX 79545 |
Utility | RWE Renewables Americas, LLC (56215) |
Latitude, Longitude | 32.3983, -100.6481 |
Generation Dates on File | Feb 2008 to Dec 2023 |
Initial Operation Date | February 2008 |
Annual Generation | 306.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 07-77 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator CH1 Details Operating February 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | TKWSW_CHAMP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | TKWSW_CHAMP |
Nameplate Capacity | 126.5 MW |
Summer Capacity | 126.5 MW |
Winter Capacity | 126.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2008 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 51 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 126.8 MW |
Planned Repower | December 2024 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 51 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 18.6 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Champion Wind Farm LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#536 | Mower County Wind Energy Center | Grand Meadow, MN | 316.0 GWh |
#537 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 315.9 GWh |
#538 | Shady Oaks Wind 2 | Compton, IL | 315.8 GWh |
#539 | Oakfield Wind Project | City of Oakfield, ME | 315.4 GWh |
#540 | Glenrock | Glenrock, WY | 314.1 GWh |
#541 | Sand Bluff Wind Farm | Big Spring, TX | 313.3 GWh |
#542 | Elkhorn Valley Wind Farm | Union, OR | 312.3 GWh |
#543 | Post Wind Farm LP | Fluvanna, TX | 311.7 GWh |
#544 | Little Elk Wind Project LLC | Cordell, OK | 310.4 GWh |
#545 | Paulding Wind Farm II | Payne, OH | 308.2 GWh |
#547 | Paulding Wind Farm III | Payne, OH | 305.5 GWh |
#548 | Rio Bravo Windpower, LLC | Roma, TX | 305.4 GWh |
#549 | Clearwater Wind II | Miles City, MT | 305.3 GWh |
#550 | Gray County Wind Energy | Montezuma, KS | 304.3 GWh |
#551 | Michigan Wind 2 | Minden City, MI | 303.9 GWh |
#552 | Alta Wind Energy Center III | Mojave, CA | 302.6 GWh |
#553 | Alta Wind Energy Center II | Mojave, CA | 299.7 GWh |
#554 | Black Oak Wind Farm | Sauk Centre, MN | 298.1 GWh |
#555 | Rosewater Wind Farm | Chalmers, IN | 297.8 GWh |
#556 | Minco Wind II, LLC | Minco, OK | 296.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Champion Wind Farm LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 410.0 GWh | 28 mi |
Canyon Wind Project, LLC | Scurry, TX | 752.9 GWh | 26.4 mi |
EG178 Facility | Snyder, TX | 686.9 GWh | 30 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 427.2 GWh | 7.9 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 24.2 mi |
Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh | 6.2 mi |
Maryneal Windpower | Maryneal, TX | 551.4 GWh | 16.5 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 21.5 mi |
Morgan Creek | Colorado City, TX | 73.6 GWh | 16.2 mi |
Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 674.5 GWh | 13.2 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 397.4 GWh | 5 mi |
Scurry County Wind II | Snyder, TX | 201.1 GWh | 23.7 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 137.6 GWh | 18.2 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh | 16.6 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 15.1 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 600.7 GWh | 9.1 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 14.7 mi |
Trent Wind Farm | Trent, TX | 535.5 GWh | 24.2 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh | 26.1 mi |
WAL1272 | Snyder, TX | 287.0 MWh | 25.6 mi |