Chalk Point Power
P.O. 10, Aquasco, MD 20608Plant Summary Information
Chalk Point Power is ranked #7 out of 179 power plants in Maryland in terms of total annual net electricity generation.
Chalk Point Power is comprised of 8 generators and generated 506.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Chalk Point Power |
---|---|
Utility Name | Lanyard Power Holdings, LLC |
Location | Prince George's County, MD |
Initial Operation Date | August 1964 |
Last Update | Sep 2024 |
Annual Generation | 979.6 GWh |
Annual Consumption | 13.3 M MMBtu |
Ranked #743 out of 11,852 Power Plants Nationwide | |
Ranked #443 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #7 out of 179 Maryland Power Plants | |
Ranked #4 out of 18 Maryland Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
Previous Operators |
NRG Chalk Point LLC (2013 to 2017) GenOn Chalk Point, LLC (2018 to 2019) Chalk Point Steam, LLC (2020 to 2020) Lanyard Power Holdings, LLC (2021 to 2023) |
Map of Chalk Point Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chalk Point Power.
Monthly Net Generation for Chalk Point Power
Chalk Point Power Details
Summary Information | |
---|---|
Plant Name | Chalk Point Power (1571) |
Plant Address | P.O. 10, Aquasco, MD 20608 |
Utility | Lanyard Power Holdings, LLC (12653) |
Latitude, Longitude | 38.5444, -76.6861 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | August 1964 |
Annual Generation | 979.6 GWh |
Fuel Types | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Patuxent River |
Ash Impoundment | No |
Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | WASHINGTON GAS LIGHT COMPANY |
Pipeline Name | WASHINGTON GAS LIGHT COMPANY |
Natural Gas Storage | No |
Generator GT1 Details Operating April 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50809 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 4 KV CT1 |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 18 MW |
Winter Capacity | 20 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1967 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GT2 Details Operating June 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50810 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 13 KV CT2 |
Nameplate Capacity | 35 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating May 1975
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50817 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 24 KV CHLKG3 |
Nameplate Capacity | 659 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 595 MW |
Winter Capacity | 614 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1975 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating December 1981
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50818 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 24 KV CHLKG4 |
Nameplate Capacity | 659 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 585.3 MW |
Winter Capacity | 598.2 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1981 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT3 Details Operating June 1991
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50811 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 13 KV CT3 |
Nameplate Capacity | 103 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 86 MW |
Winter Capacity | 100 MW |
Minimum Load | 33 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 86 MW |
Net Winter Capacity With Natural Gas | 86 MW |
Net Summer Capacity With Oil | 86 MW |
Net Winter Capacity With Oil | 86 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT4 Details Operating June 1991
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50812 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 13 KV CT4 |
Nameplate Capacity | 103 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 86 MW |
Winter Capacity | 100 MW |
Minimum Load | 33 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 86 MW |
Net Winter Capacity With Natural Gas | 86 MW |
Net Summer Capacity With Oil | 86 MW |
Net Winter Capacity With Oil | 86 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating June 1991
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50813 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 13 KV CT5 |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 109 MW |
Winter Capacity | 123 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 109 MW |
Net Winter Capacity With Natural Gas | 109 MW |
Net Summer Capacity With Oil | 109 MW |
Net Winter Capacity With Oil | 109 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating June 1991
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 50814 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CHALKPT 13 KV CT6 |
Nameplate Capacity | 125 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 109 MW |
Winter Capacity | 126 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1991 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 109 MW |
Net Winter Capacity With Natural Gas | 109 MW |
Net Summer Capacity With Oil | 109 MW |
Net Winter Capacity With Oil | 109 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Chalk Point Power Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator 3 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator 4 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator GT1 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator GT2 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator GT3 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator GT4 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator GT5 | 100.00% |
Chalk Point Power, LLC | 1360 Post Oak Blvd, Houston, TX 77056 | Generator GT6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#433 | Salem Harbor Power Development LP | Salem, MA | 1.0 TWh |
#434 | Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh |
#435 | LSP-Cottage Grove LP | Cottage Grove, MN | 1.0 TWh |
#436 | Scattergood | Playa del Rey, CA | 1.0 TWh |
#437 | Orlando Cogen LP | Orlando, FL | 1.0 TWh |
#438 | Chevron Oil | Pascagoula, MS | 1.0 TWh |
#439 | Blythe Energy Inc | Blythe, CA | 1.0 TWh |
#440 | Edwardsport | Edwardsport, IN | 2.7 TWh |
#441 | Freeport Energy Center | Freeport, TX | 980.0 GWh |
#442 | Newington | Newington, NH | 979.1 GWh |
#444 | Victoria | Victoria, TX | 974.1 GWh |
#445 | JM Shafer Generating Station | Ft. Lupton, CO | 956.9 GWh |
#446 | Hog Bayou Energy Center | Mobile, AL | 953.3 GWh |
#447 | Tracy Combined Cycle Power Plant | Tracy, CA | 952.7 GWh |
#448 | Delaware City Plant | Delaware City, DE | 1.2 TWh |
#449 | Holland Energy Park | Holland, MI | 947.0 GWh |
#450 | Harry L. Oswald | Little Rock, AR | 941.0 GWh |
#451 | West Valley Generation Project | West Valley City, UT | 940.9 GWh |
#452 | Sayreville Cogeneration Facility | Sayreville, NJ | 938.2 GWh |
#453 | Maine Independence Station | Veazie, ME | 936.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chalk Point Power.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bluefin Origination 1 | Brandywine, MD | 3.8 GWh | 15 mi |
Brandywine Power Facility | Brandywine, MD | 545.5 GWh | 13 mi |
Calvert Cliffs Nuclear Power Plant | Lusby, MD | 14.8 TWh | 15.2 mi |
Chalk Point Steam | Aquasco, MD | 1.2 GWh | 0 mi |
City of Bowie | Mitchellville, MD | 3.8 GWh | 24.9 mi |
CPV St Charles Energy Center | Waldorf, MD | 3.9 TWh | 11.2 mi |
First Baptist Church of Glenarden | Upper Marlboro, MD | 2.8 GWh | 21.5 mi |
Herbert Farm Solar | Hughesville, MD | 7.6 GWh | 6.1 mi |
Keys Energy Center | Brandywine, MD | 4.8 TWh | 12.9 mi |
Kirby Road Solar, LLC | Clinton, MD | 2.6 GWh | 20.7 mi |
MNCPPC Randall Farm | Upper Marlboro, MD | 2.4 GWh | 20.8 mi |
Morgantown Generating Plant | Newburg, MD | 641.0 MWh | 20.3 mi |
NRG Chalk Point CT | Aquasco, MD | 704.0 MWh | 0 mi |
OER Checkerspot | Tracy's Landing, MD | 3.0 GWh | 17.6 mi |
OER Monarch CSG | Upper Marlboro, MD | 3.4 GWh | 18.5 mi |
OER Patuxent CSG | Lothian, MD | 4.2 GWh | 20.3 mi |
Ripley | La Plata, MD | 53.1 GWh | 22.2 mi |
Rockfish Solar LLC | Waldorf, MD | 14.6 GWh | 10.7 mi |
Synergen Panorama, LLC CSG | Fort Washington, MD | 8.1 GWh | 22.1 mi |
Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.8 GWh | 18 mi |