Chalk Cliff Limited
29041 Highway 33, Bakersfield, CA 93308Plant Summary Information
Chalk Cliff Limited is ranked #163 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Chalk Cliff Limited is comprised of 1 generator and generated 6.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Chalk Cliff Limited |
---|---|
Utility Name | WCAC Operating Company |
Location | Kern County, CA |
Initial Operation Date | March 1990 |
Last Update | Aug 2024 |
Annual Generation | 19.3 GWh |
Annual Consumption | 215.6 k MMBtu |
Ranked #5,100 out of 11,835 Power Plants Nationwide | |
Ranked #1,413 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #712 out of 1,569 California Power Plants | |
Ranked #163 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operators |
Juniper Generation LLC (2013 to 2014) Chalk Cliff Limited (2015 to 2015) WCAC Operating Company (2016 to 2023) |
Map of Chalk Cliff Limited
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chalk Cliff Limited.
Monthly Net Generation for Chalk Cliff Limited
Chalk Cliff Limited Details
Summary Information | |
---|---|
Plant Name | Chalk Cliff Limited (50003) |
Plant Address | 29041 Highway 33, Bakersfield, CA 93308 |
Utility | WCAC Operating Company (60662) |
Latitude, Longitude | 35.0968, -119.4299 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | March 1990 |
Annual Generation | 19.3 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KERN RIVER GAS TRANSMISSION CO |
Natural Gas Storage | No |
Generator GEN1 Details Operating March 1990
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 46 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 48 MW |
Minimum Load | 32 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1990 |
Combined Heat & Power | Yes |
---|---|
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Chalk Cliff Limited Plant Owners
Owner Name | Address | Ownership |
---|---|---|
WGP Redwood Holdings, LLC | 34759 Lencioni Ave, Bakersfield, CA 93308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1403 | Plains End II LLC | Arvada, CO | 19.9 GWh |
#1404 | City of Tulare Water Facility | Tulare, CA | 23.9 GWh |
#1405 | Baptist Medical Center | Jacksonville, FL | 19.8 GWh |
#1406 | Warren | Warren, PA | 19.8 GWh |
#1407 | West Groton CHP | Groton, MA | 19.6 GWh |
#1408 | POET Biorefining - North Manchester, LLC | North Manchester, IN | 19.4 GWh |
#1409 | Neil Simpson Gas Turbine #2 | Gillette, WY | 19.4 GWh |
#1410 | Central Power Plant | Cranston, RI | 19.4 GWh |
#1411 | UI RCP New Haven Fuel Cell | New Haven, CT | 19.4 GWh |
#1412 | Milam Gas Recovery | East St. Lois, IL | 19.3 GWh |
#1414 | Danskammer Generating Station | Newburgh, NY | 19.2 GWh |
#1415 | George Johnson | Hersey, MI | 19.1 GWh |
#1416 | Yuba City Cogen Partners | Yuba City, CA | 19.0 GWh |
#1417 | Rocky Road Power LLC | East Dundee, IL | 18.8 GWh |
#1418 | Flint River Operations | Oglethorpe, GA | 448.4 GWh |
#1419 | Waxdale | Sturtevant, WI | 45.3 GWh |
#1420 | Herbert A Wagner | Baltimore, MD | 150.2 GWh |
#1421 | Grant Town Power Plant | Grant Town, WV | 598.7 GWh |
#1422 | Rice University | Houston, TX | 18.6 GWh |
#1423 | Brookside Newark | Newark, DE | 18.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chalk Cliff Limited.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABEC #3 dba Lakeview Dairy | Bakersfield, CA | 7.8 GWh | 15.2 mi |
Algonquin SKIC 10 Solar, LLC | Taft, CA | 17.7 GWh | 10.7 mi |
Algonquin SKIC20 Solar LLC | Taft, CA | 45.5 GWh | 10.7 mi |
Berry Cogen | Taft, CA | 15.1 GWh | 0.8 mi |
Berry Cogen Tanne Hills 18 | Maricopa, CA | 137.2 GWh | 0.8 mi |
Berry NMW Cogens | Bakersfield, CA | 71.7 GWh | 17.8 mi |
Castor Solar | Dustin Acres, CA | 917.0 MWh | 8.3 mi |
Cawelo Water District Solar | Famoso, CA | 927.0 MWh | 14.4 mi |
Cuyama Solar, LLC | Cuyama, CA | 74.8 GWh | 16.5 mi |
Dome Project | Fellows, CA | 48.7 GWh | 12.2 mi |
Eagle Creek | Taft, CA | 7.6 GWh | 8.3 mi |
Elk Hills Power LLC | Tupman, CA | 2.3 TWh | 12.9 mi |
La Paloma Generating Plant | McKittrick, CA | 2.3 TWh | 16.5 mi |
Maricopa West Solar PV, LLC | Taft, CA | 40.6 GWh | 6.5 mi |
Midway Sunset Cogen | Fellows, CA | 244.2 GWh | 14.4 mi |
SEPV Cuyama Hybrid | New Cuyama, CA | 107.0 MWh | 15.9 mi |
Sunrise Power LLC | Fellows, CA | 2.6 TWh | 11.7 mi |
Taft 26C Cogen | Taft, CA | 58.9 GWh | 2.6 mi |
Vulcan San Emidio Solar | Bakersfield, CA | 3.4 GWh | 14.4 mi |
Wheeler Ridge | Bakersfield, CA | 2.4 GWh | 6.5 mi |