Certain Solar - Staten Island
10 Sneden Avenue, Staten Island, NY 10312Plant Summary Information
Certain Solar - Staten Island is ranked #46 out of 116 natural gas power plants in New York in terms of total annual net electricity generation.
Certain Solar - Staten Island is comprised of 4 generators and generated 55.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Certain Solar - Staten Island |
---|---|
Utility Name | Bloom Energy |
Location | Richmond County, NY |
Initial Operation Date | September 2020 |
Last Update | Dec 2023 |
Annual Generation | 55.0 GWh |
Annual Consumption | 408.2 k MMBtu |
Ranked #3,763 out of 11,852 Power Plants Nationwide | |
Ranked #1,056 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #119 out of 832 New York Power Plants | |
Ranked #46 out of 116 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Certain Solar - Staten Island
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Certain Solar - Staten Island.
Monthly Net Generation for Certain Solar - Staten Island
Certain Solar - Staten Island Details
Summary Information | |
---|---|
Plant Name | Certain Solar - Staten Island (65201) |
Plant Address | 10 Sneden Avenue, Staten Island, NY 10312 |
Utility | Bloom Energy (57128) |
Latitude, Longitude | 40.54042, -74.17685 |
Generation Dates on File | Jan 2021 to Dec 2023 |
Initial Operation Date | September 2020 |
Annual Generation | 55.0 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NIAGARA MOHAWK DBA NATIONAL GRID |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | National Grid NY |
Natural Gas Storage | No |
Generator CTS0A Details Operating September 2020
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | OVER |
Generator CTS0B Details Operating September 2020
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | OVER |
Generator CTS0C Details Operating September 2020
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | OVER |
Generator CTS0D Details Operating September 2020
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | OVER |
Certain Solar - Staten Island Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1046 | Gallatin (TN) | Gallatin, TN | 3.7 TWh |
#1047 | Tres Port Power, LLC | Victoria, TX | 56.4 GWh |
#1048 | LSU Cogen | Baton Rouge, LA | 55.7 GWh |
#1049 | Spruance Operating Services LLC | Richmond, VA | 55.7 GWh |
#1050 | Cogeneration 1 | Tucson, AZ | 55.4 GWh |
#1051 | Bristol Myers Squibb New Brunswick | New Brunswick, NJ | 55.4 GWh |
#1052 | DTE Atlantic, LLC | Atlantic City, NJ | 55.3 GWh |
#1053 | Loma Linda University Cogen | Loma Linda, CA | 55.1 GWh |
#1054 | Warren F Sam Beasley Generation Station | Smyrna, DE | 55.1 GWh |
#1055 | Jesup Plant | Jesup, GA | 483.2 GWh |
#1057 | Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 135.8 GWh |
#1058 | Equus Freeport Power | Village of Freeport, NY | 54.7 GWh |
#1059 | San Diego State University | San Diego, CA | 55.9 GWh |
#1060 | Kalkaska CT #1 | Kalkaska, MI | 54.5 GWh |
#1061 | Cymric 36W Cogen | McKittrick, CA | 54.4 GWh |
#1062 | Domino Sugar Baltimore | Baltimore, MD | 54.3 GWh |
#1063 | Crete Energy Venture LLC | Crete, IL | 54.1 GWh |
#1064 | Alpaca | Canton Township, PA | 53.7 GWh |
#1065 | Owatonna Energy Station | Owatonna, MN | 53.5 GWh |
#1066 | Sappi Cloquet Mill | Cloquet, MN | 475.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Certain Solar - Staten Island.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon | Carteret, NJ | 3.3 GWh | 2.9 mi |
Amazon JFK8 Solar Project | Staten Island, NY | 460.0 MWh | 5.5 mi |
Apple Staten Island - Industrial Loop | Staten Island, NY | 40.1 GWh | 3 mi |
Apple Staten Island - Winant Place | Staten Island, NY | 39.5 GWh | 3.4 mi |
Arthur Kill Generating Station | Staten Island, NY | 1.1 TWh | 3.7 mi |
Bed Bath & Beyond DC Port Reading NJ | Port Reading, NJ | 2.2 GWh | 3.9 mi |
Fuel Cell 18A Sneden Avenue | Staten Island, NY | 26.7 GWh | 0 mi |
Fuel Cell 18B Sneden Avenue | Staten Island, NY | 28.3 GWh | 0 mi |
IGS Solar I - EWR5 | Avenel, NJ | 903.0 MWh | 5 mi |
IGS Solar I - EWR6 | Avenel, NJ | 801.0 MWh | 5.1 mi |
IOS - ERW9 | Carteret, NJ | 5.1 GWh | 4.5 mi |
Kinder Morgan Fordham | Staten Island, NY | 3.8 GWh | 3.1 mi |
Linden Hawk Rise Solar CSG | Linden, NJ | 6.2 GWh | 5.7 mi |
Linden Solar Farm | Linden, NJ | 3.8 GWh | 5.8 mi |
Matrix Buildings A&B (Perth Amboy) Solar | Perth Amboy, NJ | 2.7 GWh | 4.9 mi |
Port Reading 8 Solar | Carteret, NJ | 1.4 GWh | 2.7 mi |
PSEG Linden Generating Station | Linden, NJ | 5.2 TWh | 5.8 mi |
PSEG Sewaren Generating Station | Sewaren, NJ | 2.8 TWh | 3.8 mi |
THD Quicksilver - MDC Perth Amboy | Perth Amboy, NJ | 1.8 GWh | 3.9 mi |
US Foods Solar | Perth Amboy, NJ | 6.5 GWh | 5.2 mi |