Cereal City Solar, LLC
14453 H Dr N, Battle Creek, MI 49014Plant Summary Information
Cereal City Solar, LLC is ranked #3 out of 57 solar farms in Michigan in terms of total annual net electricity generation.
Cereal City Solar, LLC generated 20.3 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Cereal City Solar, LLC |
---|---|
Utility Name | Cereal City Solar, LLC |
Location | Calhoun County, MI |
Initial Operation Date | December 2023 |
Last Update | Feb 2025 |
Annual Generation | 200.2 GWh |
Annual Consumption | 723.9 k MMBtu |
Ranked #2,361 out of 11,993 Power Plants Nationwide | |
Ranked #308 out of 5,778 Solar Power Plants Nationwide | |
Ranked #56 out of 258 Michigan Power Plants | |
Ranked #3 out of 57 Michigan Solar Power Plants | |
Fuel Types | Solar |
Map of Cereal City Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cereal City Solar, LLC.
Monthly Net Generation for Cereal City Solar, LLC
Cereal City Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Cereal City Solar, LLC (66389) |
Plant Address | 14453 H Dr N, Battle Creek, MI 49014 |
Utility | Cereal City Solar, LLC (65458) |
Latitude, Longitude | 42.3058, -85.03225 |
Generation Dates on File | Dec 2023 to Feb 2025 |
Initial Operation Date | December 2023 |
Annual Generation | 200.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Michigan Electric Transmission Company, (56163) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator CCSPV Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 52 |
DC Net Capacity | 150 MW |
Other Materials | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cereal City Solar, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#298 | Sigurd Solar LLC | Sigurd, UT | 202.7 GWh |
#299 | Samson Solar Energy III LLC | Cunningham, TX | 202.3 GWh |
#300 | Desert Harvest, LLC | Desert Center, CA | 202.2 GWh |
#301 | Rocket Solar, LLC | Corinne, UT | 201.7 GWh |
#302 | Techren Solar I LLC | Boulder, NV | 201.6 GWh |
#303 | Wagyu | Damon, TX | 201.4 GWh |
#304 | Clover Creek Solar Community Solar | Mona, UT | 201.3 GWh |
#305 | SR Arlington II | Blakely, GA | 200.5 GWh |
#306 | Lapetus | Andrews, TX | 200.4 GWh |
#307 | Two Creeks Solar | Two Rivers, WI | 200.3 GWh |
#309 | Badger Hollow I | Montfort, WI | 199.3 GWh |
#310 | Graphite Solar I | Wellington, UT | 199.2 GWh |
#311 | Solverde 1 | Lancaster, CA | 197.8 GWh |
#312 | OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh |
#313 | Badger Hollow II | Cobb, WI | 196.8 GWh |
#314 | Pioneer Solar (CO), LLC | Bennett, CO | 196.6 GWh |
#315 | AP Sunray LLC | Knippa, TX | 195.9 GWh |
#316 | BPL Crown Solar LLC | Chilton, TX | 194.9 GWh |
#317 | Red Mesa Solar Project | Red Mesa, UT | 194.1 GWh |
#318 | Lockhart Solar PV II | Hinkley, CA | 193.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cereal City Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
13 Mile Solar, LLC | Battle Creek, MI | 4.0 GWh | 1.7 mi |
Angola Solar, LLC | Coldwater, MI | 3.7 GWh | 32.6 mi |
Battle Creek Mill | Battle Creek, MI | 4.4 GWh | 8.9 mi |
Blue Elk III Solar, LLC | Eaton Rapids, MI | 433.0 MWh | 26.7 mi |
Bullhead Solar, LLC | Fayette, MI | 3.8 GWh | 30.1 mi |
Calhoun Solar | Battle Creek, MI | 356.1 GWh | 2.4 mi |
Coldwater Peaking Plant | Coldwater, MI | 786.0 MWh | 26.7 mi |
Delta Solar Power I | Grand Ledge, MI | 13.3 GWh | 32 mi |
Delta Solar Power II | Grand Ledge, MI | 25.8 GWh | 32.5 mi |
DG AMP Solar Coldwater | Coldwater, MI | 2.0 GWh | 25.7 mi |
Greenstone Solar, LLC | Coldwater, MI | 807.0 MWh | 25.6 mi |
GRS C&C | Marshall, MI | 18.2 GWh | 3.7 mi |
Kalamazoo River Generating Station | Comstock, MI | 188.9 GWh | 23.7 mi |
Marshall (MI) | Marshall, MI | 611.0 MWh | 5.2 mi |
River Fork Solar, LLC | Albion, MI | 48.1 GWh | 14.2 mi |
Sauk Solar Park | MI | 13.5 GWh | 17.2 mi |
Shipsterns Solar, LLC | Albion, MI | 1.3 GWh | 14.1 mi |
The Andersons Albion Ethanol LLC | Albion, MI | 65.7 GWh | 12.9 mi |
Western Michigan Solar Gardens | Kalamazoo, MI | 1.5 GWh | 31.4 mi |
Western Michigan University Power Plant | Kalamazoo, MI | 71.3 GWh | 29.4 mi |