Central Utility Plant - Texas A&M
496 Asbury, College Station, TX 77843Plant Summary Information
Central Utility Plant - Texas A&M is ranked #138 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Central Utility Plant - Texas A&M is comprised of 2 generators and generated 51.7 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Central Utility Plant - Texas A&M |
---|---|
Utility Name | Texas A&M, Utilities & Energy Services |
Location | Brazos County, TX |
Initial Operation Date | December 1956 |
Last Update | Oct 2024 |
Annual Generation | 113.9 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #3,050 out of 11,866 Power Plants Nationwide | |
Ranked #869 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #448 out of 758 Texas Power Plants | |
Ranked #138 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Central Utility Plant - Texas A&M
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Central Utility Plant - Texas A&M.
Monthly Net Generation for Central Utility Plant - Texas A&M
Central Utility Plant - Texas A&M Details
Summary Information | |
---|---|
Plant Name | Central Utility Plant - Texas A&M (58151) |
Plant Address | 496 Asbury, College Station, TX 77843 |
Utility | Texas A&M, Utilities & Energy Services (58113) |
Latitude, Longitude | 30.61778, -96.34333 |
Generation Dates on File | Jan 2012 to Oct 2024 |
Initial Operation Date | December 1956 |
Annual Generation | 113.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Bryan - (TX) (2442) TX |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
Natural Gas Storage | No |
Generator GTG01 Details Operating August 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | UES1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | North Load Zone |
RTO ISO Location Designation For Reporting Wholesale Sales Data | North Load Zone |
Nameplate Capacity | 34.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 32.4 MW |
Winter Capacity | 34.1 MW |
Minimum Load | 27 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2011 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG02 Details Operating August 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | UES1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | North Load Zone |
RTO ISO Location Designation For Reporting Wholesale Sales Data | North Load Zone |
Nameplate Capacity | 11 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2011 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 11 MW |
Net Winter Capacity With Natural Gas | 11 MW |
Net Summer Capacity With Oil | 11 MW |
Net Winter Capacity With Oil | 11 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Central Utility Plant - Texas A&M Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#859 | Pittsburgh Airport Gas Plant | Coraopolis, PA | 118.4 GWh |
#860 | D G Hunter | Alexandria, LA | 117.8 GWh |
#861 | Ray Olinger | Navada, TX | 117.4 GWh |
#862 | Chamon Power LLC | Houston, TX | 116.3 GWh |
#863 | WFEC GenCo LLC | Anadarko, OK | 115.4 GWh |
#864 | Purdue University | West Lafayette, IN | 131.2 GWh |
#865 | San Jacinto County Peaking Facility | Shepherd, TX | 115.1 GWh |
#866 | Harrington | Amarillo, TX | 2.3 TWh |
#867 | Victoria Port Power II LLC | Victoria, TX | 114.7 GWh |
#868 | Energy Center Dover | Dover, DE | 114.5 GWh |
#870 | Kansas Ethanol, LLC | Lyons, KS | 113.4 GWh |
#871 | Lordsburg Generating | Lordsburg, NM | 113.3 GWh |
#872 | AL Sandersville LLC | Warthen, GA | 112.9 GWh |
#873 | Decker Creek | Austin, TX | 112.4 GWh |
#874 | Goodman Energy Center | Hays, KS | 112.1 GWh |
#875 | Biron Mill | Wisconsin Rapids, WI | 185.5 GWh |
#876 | UCI Facilities Management Central Plant | Irvine, CA | 111.4 GWh |
#877 | Montpelier Electric Generating Station | Poneto, IN | 111.1 GWh |
#878 | BYU Central Heating Plant | Provo, UT | 110.5 GWh |
#879 | DeCordova Steam Electric Station | Granbury, TX | 95.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Central Utility Plant - Texas A&M.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Jay Solar I, LLC | Iola, TX | 439.4 GWh | 17.3 mi |
Bryan (TX) | Bryan, TX | 3.9 GWh | 2.7 mi |
Dansby | Bryan, TX | 187.7 GWh | 10 mi |
Fayette Power Project | La Grange, TX | 7.0 TWh | 54.2 mi |
HEB00020 | Cypress, TX | 320.0 MWh | 56.1 mi |
HEB00594 | The Woodlands, TX | 290.0 MWh | 56.8 mi |
HEB00767 | Magnolia, TX | 178.0 MWh | 48 mi |
Lewis Creek | Willis, TX | 2.1 TWh | 50.5 mi |
Limestone | Jewett, TX | 5.1 TWh | 55.8 mi |
Major Oak Power | Bremond, TX | 2.0 TWh | 38.8 mi |
Marlin Solar | Marlin, TX | 10.3 GWh | 56 mi |
Montgomery County | Willis, TX | 6.4 TWh | 50.1 mi |
Oak Grove (TX) | Franklin, TX | 11.1 TWh | 39.8 mi |
Orion I Solar Project | Burlington, TX | 140.2 GWh | 47 mi |
Orion II Solar Project | Rosebud, TX | 51.9 GWh | 45.2 mi |
Orion III Solar Project | Buckholts, TX | 168.9 GWh | 52.1 mi |
OTHERTexasA&M | Bryan, TX | 2.1 GWh | 7.2 mi |
Tenaska Frontier Generation Station | Shiro, TX | 3.9 TWh | 25.4 mi |
WAL3390 | The Woodlands, TX | 361.0 MWh | 53.8 mi |
Winchester Power Park | Winchester, TX | 86.2 GWh | 56.4 mi |