Central Utility Plant Cincinnati
3000 Glendora Avenue, Cincinnati, OH 45221Plant Summary Information
Central Utility Plant Cincinnati is ranked #44 out of 183 power plants in Ohio in terms of total annual net electricity generation.
Central Utility Plant Cincinnati is comprised of 4 generators and generated 72.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Central Utility Plant Cincinnati |
---|---|
Utility Name | University of Cincinnati |
Location | Hamilton County, OH |
Initial Operation Date | June 2004 |
Last Update | Sep 2024 |
Annual Generation | 238.9 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #2,094 out of 11,852 Power Plants Nationwide | |
Ranked #684 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #44 out of 183 Ohio Power Plants | |
Ranked #20 out of 54 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of Central Utility Plant Cincinnati
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Central Utility Plant Cincinnati.
Monthly Net Generation for Central Utility Plant Cincinnati
Central Utility Plant Cincinnati Details
Summary Information | |
---|---|
Plant Name | Central Utility Plant Cincinnati (57908) |
Plant Address | 3000 Glendora Avenue, Cincinnati, OH 45221 |
Utility | University of Cincinnati (57281) |
Latitude, Longitude | 39.13453, -84.50942 |
Generation Dates on File | Jan 2011 to Sep 2024 |
Initial Operation Date | June 2004 |
Annual Generation | 238.9 GWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | City Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | DUKE ENERGY OHIO |
Natural Gas Storage | No |
Generator CTG1 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CUP |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DEOK |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
Nameplate Capacity | 11.9 MW |
Nameplate Power Factor | 0.88 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 7.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 1.2 MW |
Planned Net Winter Capacity Uprate | 1.2 MW |
Planned Uprate | April 2026 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 12.5 MW |
Net Winter Capacity With Natural Gas | 12.5 MW |
Net Summer Capacity With Oil | 12.5 MW |
Net Winter Capacity With Oil | 12.5 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CTG2 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CUP |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DEOK |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
Nameplate Capacity | 11.9 MW |
Nameplate Power Factor | 0.88 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 7.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Planned Net Summer Capacity Uprate | 1.2 MW |
Planned Net Winter Capacity Uprate | 1.2 MW |
Planned Uprate | April 2024 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 12.5 MW |
Net Winter Capacity With Natural Gas | 12.5 MW |
Net Summer Capacity With Oil | 12.5 MW |
Net Winter Capacity With Oil | 12.5 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator P005 Details Operating June 2004
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | DEOK |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
Nameplate Capacity | 1.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CUP |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | DEOK |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
Nameplate Capacity | 21.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 21.5 MW |
Winter Capacity | 21.5 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2004 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 21.5 MW |
Net Winter Capacity With Natural Gas | 21.5 MW |
Net Summer Capacity With Oil | 8 MW |
Net Winter Capacity With Oil | 8 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Central Utility Plant Cincinnati Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#674 | Frank Knutson | Commerce City, CO | 246.6 GWh |
#675 | Los Esteros Critical Energy Center | San Jose, CA | 245.7 GWh |
#676 | New-Indy Ontario Mill | Ontario, CA | 245.2 GWh |
#677 | Henry County | New Castle, IN | 243.9 GWh |
#678 | Chambersburg | Chambersburg, PA | 243.0 GWh |
#679 | Valencia Energy Facility | Belen, NM | 242.7 GWh |
#680 | NAEA Lakewood LLC | Lakewood, NJ | 245.5 GWh |
#681 | Arapahoe Combustion Turbine Project | Denver, CO | 242.6 GWh |
#682 | Dahlberg | Nicholson, GA | 242.8 GWh |
#683 | Georgetown | Indianapolis, IN | 239.4 GWh |
#685 | Eagle Point Power Generation | Westville, NJ | 238.5 GWh |
#686 | Dickerson Power | Dickerson, MD | 239.6 GWh |
#687 | Larsen Memorial | Lakeland, FL | 237.6 GWh |
#688 | Valero Wilmington Cogeneration Plant | Wilmington, CA | 236.7 GWh |
#689 | Waterford 1 & 2 | Killona, LA | 239.7 GWh |
#690 | Louisa Generation Facility | Gordonsville, VA | 236.9 GWh |
#691 | T B Simon Power Plant | East Lansing, MI | 235.5 GWh |
#692 | Port Arthur Texas Refinery | Port Arthur, TX | 234.8 GWh |
#693 | Saranac Facility | Plattsburgh, NY | 234.4 GWh |
#694 | NAEA Ocean Peaking Power LLC | Lakewood, NJ | 232.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Central Utility Plant Cincinnati.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 10.8 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 20.5 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 27 mi |
Dicks Creek | Monroe, OH | 1.9 GWh | 23.9 mi |
East Bend | Union, KY | 2.4 TWh | 24.3 mi |
East Campus Utility Plant | Cincinnati, OH | 212.7 MWh | 0.3 mi |
Hamilton (OH) | Hamilton, OH | 776.0 MWh | 19.2 mi |
Hamilton Hydro | HAMILTON, OH | 5.7 GWh | 19.4 mi |
Hamilton Peaking | Hamilton, OH | 1.5 GWh | 15.1 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 11.4 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh | 19.4 mi |
Madison | Trenton, OH | 928.1 GWh | 22.1 mi |
Miami Fort | North Bend, OH | 5.1 TWh | 15.8 mi |
Middletown Coke Company, LLC | Middletown, OH | 333.0 GWh | 24 mi |
Middletown Energy Center | Middletown, OH | 3.5 TWh | 24.4 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 0.5 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 9.4 GWh | 2.8 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 20.1 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 20.1 mi |
Woodsdale | Trenton, OH | 326.8 GWh | 21.9 mi |