CED Beecher Sun Solar
130 W Corning Road, Beecher, IL 60401Plant Summary Information
CED Beecher Sun Solar is ranked #88 out of 144 solar farms in Illinois in terms of total annual net electricity generation.
CED Beecher Sun Solar generated 374.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | CED Beecher Sun Solar |
---|---|
Utility Name | Bay4 Energy Services, LLC |
Location | Will County, IL |
Initial Operation Date | May 2021 |
Last Update | Dec 2023 |
Annual Generation | 3.5 GWh |
Annual Consumption | 12.4 k MMBtu |
Ranked #8,560 out of 11,835 Power Plants Nationwide | |
Ranked #3,480 out of 5,643 Solar Power Plants Nationwide | |
Ranked #219 out of 318 Illinois Power Plants | |
Ranked #88 out of 144 Illinois Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Consolidated Edison Development Inc. (2019 to 2020) Bay4 Energy Services, LLC (2021 to 2023) |
Map of CED Beecher Sun Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CED Beecher Sun Solar.
Monthly Net Generation for CED Beecher Sun Solar
CED Beecher Sun Solar Details
Summary Information | |
---|---|
Plant Name | CED Beecher Sun Solar (63823) |
Plant Address | 130 W Corning Road, Beecher, IL 60401 |
Utility | Bay4 Energy Services, LLC (64395) |
Latitude, Longitude | 41.32712, -87.61052 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | May 2021 |
Annual Generation | 3.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BS1 Details Operating May 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 2.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 2.8 MW |
CED Beecher Sun Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3470 | Mtn. Solar 2 | Watkins, CO | 3.5 GWh |
#3471 | 10 Finderne Avenue Solar, LLC | Bridgewater Town, NJ | 3.5 GWh |
#3472 | Univ of California San Diego Solar | La Jolla, CA | 3.5 GWh |
#3473 | Panda Solar NC 8, LLC | Star, NC | 3.5 GWh |
#3474 | Kearsarge Montague BD(CSG) | Montague, MA | 3.3 GWh |
#3475 | Cronin Road Solar 1, LLC CSG Hybrid | Warren, MA | 3.5 GWh |
#3476 | Little Falls Solar | Little Falls, NY | 3.5 GWh |
#3477 | Apple Canyon Lake Solar | Apple River, IL | 3.5 GWh |
#3478 | Macys Goodyear | Goodyear, AZ | 3.5 GWh |
#3479 | Columbia University - Minisink | Minisink, NY | 3.5 GWh |
#3481 | Colton Solar | Molalla, OR | 3.5 GWh |
#3482 | Solar Star California II LLC | Sacramento, CA | 3.5 GWh |
#3483 | Spooner Solar Array | Spooner, WI | 3.5 GWh |
#3484 | SCE-Snowline-White Road (North) | Phelan, CA | 3.5 GWh |
#3485 | Chambers 4 - Rialto LGB8 | Rialto, CA | 3.5 GWh |
#3486 | GELD Solar Farm | Groton, MA | 3.5 GWh |
#3487 | Xcel Adams 2 Community Solar Array | Watkins, CO | 3.5 GWh |
#3488 | Expressway Solar C2 | Victorville, CA | 3.5 GWh |
#3489 | Solar Photovoltaic Project #48 | Redlands, CA | 3.5 GWh |
#3490 | Friendship II | West Friendship, MD | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CED Beecher Sun Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Griggs Solar, LLC | Grant Park, IL | 3.9 GWh | 9.8 mi |
Amazon MDW7 Solar Project | Monee, IL | 361.0 MWh | 10.8 mi |
Beecher Gas Recovery | Beecher, IL | 3.2 GWh | 4 mi |
CED Spring Creek Solar | St Anne, IL | 3.1 GWh | 16.3 mi |
Crete Energy Venture LLC | Crete, IL | 54.1 GWh | 7.1 mi |
CSL Behring LLC | Bradley, IL | 22.9 GWh | 17.1 mi |
Griffith | Griffith, IN | 3.0 GWh | 16.2 mi |
IGS Frankfort 2 CSG | Frankfort, IL | 3.4 GWh | 14.8 mi |
Kankakee 2 | Bourbonnais, IL | 221.0 MWh | 17.4 mi |
Kankakee Solar 4 LLC | Kankakee, IL | 3.6 GWh | 18.2 mi |
Lincoln Generating Facility | Manhattan, IL | 12.3 GWh | 17.9 mi |
Lincoln Solar | Merrillville, IN | 1.7 GWh | 20.4 mi |
Lineage Logistics Solar | University Park, IL | 2.5 GWh | 11.5 mi |
Munster Landfill Gas-to-Energy | Munster, IN | 3.5 GWh | 14.6 mi |
Nostrand | Manteno Township, IL | 2.9 GWh | 14.4 mi |
Peterman II | St. Anne, IL | 3.4 GWh | 20 mi |
University Park North | University Park, IL | 208.2 GWh | 10.8 mi |
University Park South | University Park, IL | 83.4 GWh | 10.8 mi |
Woodlawn CSG | Crete, IL | 4.3 GWh | 4.6 mi |
Woodlawn II (CSG) | Crete, IL | 3.7 GWh | 4.6 mi |