Catalina Solar LLC
1232 Catalina rd, Rosamond, CA 93560Plant Summary Information
Catalina Solar LLC is ranked #66 out of 799 solar farms in California in terms of total annual net electricity generation.
Catalina Solar LLC generated 55.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Catalina Solar LLC |
---|---|
Utility Name | EDF Renewable Asset Holdings, Inc. |
Location | Kern County, CA |
Initial Operation Date | December 2012 |
Last Update | Dec 2023 |
Annual Generation | 262.7 GWh |
Annual Consumption | 934.1 k MMBtu |
Ranked #1,983 out of 11,835 Power Plants Nationwide | |
Ranked #195 out of 5,643 Solar Power Plants Nationwide | |
Ranked #204 out of 1,569 California Power Plants | |
Ranked #66 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2023) |
Map of Catalina Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Catalina Solar LLC.
Monthly Net Generation for Catalina Solar LLC
Catalina Solar LLC Details
Summary Information | |
---|---|
Plant Name | Catalina Solar LLC (57708) |
Plant Address | 1232 Catalina rd, Rosamond, CA 93560 |
Utility | EDF Renewable Asset Holdings, Inc. (57170) |
Latitude, Longitude | 34.93826, -118.33449 |
Generation Dates on File | Dec 2012 to Dec 2023 |
Initial Operation Date | December 2012 |
Annual Generation | 262.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator INV Details Operating December 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 110 MW |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 178 |
Tilt Angle | 20 |
DC Net Capacity | 143 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Catalina Solar LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#185 | Sparta Solar | Pawnee, TX | 273.5 GWh |
#186 | Maverick Solar 6, LLC | Desert Center, CA | 268.2 GWh |
#187 | Dougherty County Solar, LLC | Albany, GA | 270.3 GWh |
#188 | Edwards Sanborn E4 | Mojave, CA | 263.0 GWh |
#189 | Hunter Solar LLC (UT) | Clawson, UT | 268.9 GWh |
#190 | Boulder Solar Power, LLC | Boulder City, NV | 268.2 GWh |
#191 | Jackpot Solar, LLC | Twin Falls, ID | 267.1 GWh |
#192 | Bluebell Solar II | Sterling, TX | 267.0 GWh |
#193 | West Line Solar, LLC | City of Eloy, AZ | 266.5 GWh |
#194 | San Pablo Raceway | Lancaster, CA | 266.3 GWh |
#196 | Ivanpah 3 | Nipton, CA | 270.0 GWh |
#197 | Wood County | Nekoosa, WI | 261.0 GWh |
#198 | Milford Solar 1 | Milford, UT | 260.4 GWh |
#199 | East Pecos Solar | McCamey, TX | 259.2 GWh |
#200 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.6 GWh |
#201 | Bellflower Solar 1 | Lewisville, IN | 258.9 GWh |
#202 | Ivanpah 2 | Nipton, CA | 268.3 GWh |
#203 | Saint Solar | Coolidge, AZ | 256.6 GWh |
#204 | Central Line Solar, LLC | Coolidge, AZ | 256.3 GWh |
#205 | Nebula Solar | La Feria, TX | 255.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Catalina Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind Energy Center I | Mojave, CA | 361.0 GWh | 6.7 mi |
Alta Wind Energy Center II | Mojave, CA | 299.7 GWh | 6.3 mi |
Alta Wind Energy Center III | Mojave, CA | 302.6 GWh | 6.3 mi |
Alta Wind Energy Center IV | Mojave, CA | 147.8 GWh | 7.1 mi |
Alta Wind Energy Center V | Mojave, CA | 238.1 GWh | 7.1 mi |
BigBeau Solar, LLC | Rosamond, CA | 299.9 GWh | 2.2 mi |
Brookfield Tehachapi 1 | Mojave, CA | 220.4 GWh | 7.2 mi |
Chaparral Springs | Rosamond, CA | 427.4 GWh | 4.7 mi |
Golden Field Solar III, LLC | Rosamond, CA | 509.2 GWh | 7.2 mi |
Manzana Wind LLC | Rosamond, CA | 468.5 GWh | 7.2 mi |
Mustang Hills LLC | Mojave, CA | 248.1 GWh | 6.8 mi |
North Rosamond Solar LLC | Rosamond, CA | 387.0 GWh | 5.9 mi |
Pacific Wind LLC | Rosamond, CA | 264.0 GWh | 6.4 mi |
Raceway Solar & Storage | Lancaster, CA | 160.4 GWh | 7.2 mi |
RE Rosamond One LLC | Rosamond, CA | 49.1 GWh | 5.6 mi |
RE Rosamond Two LLC | Rosamond, CA | 38.0 GWh | 6 mi |
SEPV Mojave West | Mojave, CA | 51.1 GWh | 6.5 mi |
Solar Star 2 | Rosamond, CA | 701.3 GWh | 6.3 mi |
Valentine Solar, LLC | Rosamond, CA | 282.1 GWh | 3.7 mi |
Windhub Solar A LLC | Mojave, CA | 44.6 GWh | 6.2 mi |