Castle Gap Solar Hybrid

5291 US HWY 385 South, McCarney, TX 79752

Plant Summary Information

Castle Gap Solar Hybrid is ranked #35 out of 166 solar farms in Texas in terms of total annual net electricity generation.

Castle Gap Solar Hybrid generated 124.0 GWh during the 3-month period between June 2024 to September 2024.

Plant NameCastle Gap Solar Hybrid
Utility NameUpton County Solar 2 LLC
LocationUpton County, TX
Initial Operation DateMay 2018
Last Update Sep 2024
Annual Generation 388.3 GWh
Annual Consumption 1.4 M MMBtu
Ranked #1,543 out of 11,852 Power Plants Nationwide
Ranked #101 out of 5,655 Solar Power Plants Nationwide
Ranked #295 out of 754 Texas Power Plants
Ranked #35 out of 166 Texas Solar Power Plants
Fuel Types Solar
Previous Operators Upco Power 1, LLC (2015 to 2015)
Consolidated Edison Development Inc. (2016 to 2016)
Upton County Solar 2 LLC (2017 to 2023)

Map of Castle Gap Solar Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Castle Gap Solar Hybrid.

Create Your Account Today

Monthly Net Generation for Castle Gap Solar Hybrid

Castle Gap Solar Hybrid Details

Summary Information
Plant NameCastle Gap Solar Hybrid (60123)
Plant Address5291 US HWY 385 South, McCarney, TX 79752
UtilityUpton County Solar 2 LLC (61123)
Latitude, Longitude31.255, -102.272
Generation Dates on FileMay 2018 to Sep 2024
Initial Operation DateMay 2018
Annual Generation 388.3 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerLower Colorado River Authority (11269)
Grid Voltage 138.00 kV
Energy StorageYes

Generator CGAP Details Operating May 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity180 MW
Summer Capacity180 MW
Winter Capacity180 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Tilt Angle60
DC Net Capacity234 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator BAT1 Details Operating June 2019

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity9.9 MW
Summer Capacity9.9 MW
Winter Capacity9.9 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH42
Maximum Charge Rate9.9 MW
Maximum Discharge Rate9.9 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating4.8
Storage Enclosure TypeCS
Frequency RegulationYes
Load FollowingP
Excess Wind And Solar GenerationYes
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id60123
Direct Support Gen IdCGAP
Support T D AssetNo

Castle Gap Solar Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#91Springbok Solar Farm 2Cantil, CA404.2 GWh
#92Mesquite Solar 1Tonopah, AZ403.9 GWh
#93CED Crane SolarCrane, TX402.8 GWh
#94Big Plain Solar, LLCLondon, OH402.1 GWh
#95Shakes SolarCarrizo Springs, TX397.8 GWh
#96Samson Solar EnergyCunningham, TX395.2 GWh
#97Mustang TwoLemoore, CA393.0 GWh
#98RE GarlandRosamond, CA383.7 GWh
#99Yellow Pine SolarEnterprise, NV380.2 GWh
#100Buena Vista Energy CenterChaparral, NM389.1 GWh
#102Imperial Solar Energy Center WestSeeley, CA388.3 GWh
#103North Rosamond Solar LLCRosamond, CA387.7 GWh
#104Holstein 1 Solar FarmWingate, TX387.2 GWh
#105Riverstart Solar Park LLCModoc, IN386.7 GWh
#106McFarland A Solar and StorageDateland, AZ378.2 GWh
#107Hillcrest SolarMt. Orab, OH377.4 GWh
#108Solar Gen 2 Solar FacilityCalipatria, CA376.5 GWh
#109Brazoria County Solar Project (Danciger)Damon, TX376.3 GWh
#110Texas Solar Nova 2Spur, TX375.9 GWh
#111Maverick Solar, LLCDesert Center, CA375.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Castle Gap Solar Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Alamo 6Fort Stockton, TX235.1 GWh18.1 mi
Appaloosa Run WindRankin, TX697.8 GWh26.9 mi
CED Crane SolarCrane, TX402.8 GWh2.3 mi
Desert SkyIraan, TX462.3 GWh25.7 mi
East Pecos SolarMcCamey, TX253.8 GWh17.6 mi
Emerald GroveCrane, TX278.1 GWh12.3 mi
Greasewood SolarFort Stockton, TX156.9 GWh20.1 mi
High Lonesome Wind Power, LLC HybridRankin, TX1.2 TWh23.8 mi
King Mountain Wind Ranch 1McCamey, TX558.4 GWh3.6 mi
Midway Solar - TXFort Stockton, TX306.0 GWh18.2 mi
NWP Indian Mesa Wind FarmIraan, TX197.8 GWh22.7 mi
Oberon IAOdessa, TX271.4 GWh40 mi
Oberon IBOdessa, TX54.7 GWh39.3 mi
Pearl SolarFort Stockton, TX98.8 GWh18.5 mi
RE MaplewoodMcCamey, TX481.1 GWh19.3 mi
Roadrunner, LLC HybridMcCamey, TX981.5 GWh5.3 mi
Sherbino IIFt. Stockton, TX533.6 GWh36.1 mi
Upton County SolarMcCamey, TX285.5 GWh1.4 mi
Woodward Mountain IGirvin, TX175.7 GWh22.6 mi
Woodward Mountain IIGirvin, TX168.8 GWh22.6 mi