Castle Gap Solar Hybrid

5291 US HWY 385 South, McCarney, TX 79752

Plant Summary Information

Castle Gap Solar Hybrid is ranked #36 out of 161 solar farms in Texas in terms of total annual net electricity generation.

Castle Gap Solar Hybrid generated 127.5 GWh during the 3-month period between May 2024 to August 2024.

Plant NameCastle Gap Solar Hybrid
Utility NameUpton County Solar 2 LLC
LocationUpton County, TX
Initial Operation DateMay 2018
Last Update Aug 2024
Annual Generation 385.9 GWh
Annual Consumption 1.5 M MMBtu
Ranked #1,545 out of 11,835 Power Plants Nationwide
Ranked #102 out of 5,643 Solar Power Plants Nationwide
Ranked #296 out of 749 Texas Power Plants
Ranked #36 out of 161 Texas Solar Power Plants
Fuel Types Solar
Previous Operators Upco Power 1, LLC (2015 to 2015)
Consolidated Edison Development Inc. (2016 to 2016)
Upton County Solar 2 LLC (2017 to 2023)

Map of Castle Gap Solar Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Castle Gap Solar Hybrid.

Create Your Account Today

Monthly Net Generation for Castle Gap Solar Hybrid

Castle Gap Solar Hybrid Details

Summary Information
Plant NameCastle Gap Solar Hybrid (60123)
Plant Address5291 US HWY 385 South, McCarney, TX 79752
UtilityUpton County Solar 2 LLC (61123)
Latitude, Longitude31.255, -102.272
Generation Dates on FileMay 2018 to Aug 2024
Initial Operation DateMay 2018
Annual Generation 385.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerLower Colorado River Authority (11269)
Grid Voltage 138.00 kV
Energy StorageYes

Generator CGAP Details Operating May 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity180 MW
Summer Capacity180 MW
Winter Capacity180 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Tilt Angle60
DC Net Capacity234 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator BAT1 Details Operating June 2019

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity9.9 MW
Summer Capacity9.9 MW
Winter Capacity9.9 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH42
Maximum Charge Rate9.9 MW
Maximum Discharge Rate9.9 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating4.8
Storage Enclosure TypeCS
Frequency RegulationYes
Load FollowingP
Excess Wind And Solar GenerationYes
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id60123
Direct Support Gen IdCGAP
Support T D AssetNo

Castle Gap Solar Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#92Daggett 2Daggett, CA397.4 GWh
#93Big Plain Solar, LLCLondon, OH403.0 GWh
#94RE GarlandRosamond, CA383.7 GWh
#95Yellow Pine SolarEnterprise, NV377.8 GWh
#96Buena Vista Energy CenterChaparral, NM386.6 GWh
#97Holstein 1 Solar FarmWingate, TX389.6 GWh
#98Arica SolarDesert Center, CA387.7 GWh
#99Imperial Solar Energy Center WestSeeley, CA388.3 GWh
#100Samson Solar EnergyCunningham, TX388.3 GWh
#101North Rosamond Solar LLCRosamond, CA387.0 GWh
#103Riverstart Solar Park LLCModoc, IN386.0 GWh
#104Brazoria County Solar Project (Danciger)Damon, TX385.6 GWh
#105Mustang TwoLemoore, CA385.4 GWh
#106Fox Squirrel SolarMt Sterling, OH384.4 GWh
#107Hillcrest SolarMt. Orab, OH380.0 GWh
#108Buckthorn WestexFt. Stockton, TX377.4 GWh
#109Solar Gen 2 Solar FacilityCalipatria, CA376.5 GWh
#110Maverick Solar, LLCDesert Center, CA375.5 GWh
#111Wright Solar ParkLos Banos, CA370.5 GWh
#112RE RoserockFort Stockton, TX368.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Castle Gap Solar Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Alamo 6Fort Stockton, TX238.9 GWh18.1 mi
Appaloosa Run WindRankin, TX708.3 GWh26.9 mi
CED Crane SolarCrane, TX405.5 GWh2.3 mi
Desert SkyIraan, TX462.3 GWh25.7 mi
East Pecos SolarMcCamey, TX259.2 GWh17.6 mi
Emerald GroveCrane, TX281.6 GWh12.3 mi
Greasewood SolarFort Stockton, TX165.2 GWh20.1 mi
High Lonesome Wind Power, LLC HybridRankin, TX1.3 TWh23.8 mi
King Mountain Wind Ranch 1McCamey, TX561.3 GWh3.6 mi
Midway Solar - TXFort Stockton, TX302.3 GWh18.2 mi
NWP Indian Mesa Wind FarmIraan, TX197.8 GWh22.7 mi
Oberon IAOdessa, TX276.9 GWh40 mi
Oberon IBOdessa, TX56.3 GWh39.3 mi
Pearl SolarFort Stockton, TX99.6 GWh18.5 mi
RE MaplewoodMcCamey, TX491.6 GWh19.3 mi
Roadrunner, LLC HybridMcCamey, TX990.1 GWh5.3 mi
Sherbino IIFt. Stockton, TX533.6 GWh36.1 mi
Upton County SolarMcCamey, TX287.4 GWh1.4 mi
Woodward Mountain IGirvin, TX175.7 GWh22.6 mi
Woodward Mountain IIGirvin, TX168.8 GWh22.6 mi