Castaic Lake Phase II
27234 Bouquet Canyon, Santa Clara, CA 91350Plant Summary Information
Castaic Lake Phase II is ranked #330 out of 799 solar farms in California in terms of total annual net electricity generation.
Castaic Lake Phase II generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Castaic Lake Phase II |
---|---|
Utility Name | MN8 Energy LLC |
Location | Los Angeles County, CA |
Initial Operation Date | December 2014 |
Last Update | Dec 2023 |
Annual Generation | 7.8 GWh |
Annual Consumption | 26.9 k MMBtu |
Ranked #6,713 out of 11,852 Power Plants Nationwide | |
Ranked #2,129 out of 5,655 Solar Power Plants Nationwide | |
Ranked #923 out of 1,570 California Power Plants | |
Ranked #330 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Solar Star California XXVIII, LLC (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of Castaic Lake Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Castaic Lake Phase II.
Monthly Net Generation for Castaic Lake Phase II
Castaic Lake Phase II Details
Summary Information | |
---|---|
Plant Name | Castaic Lake Phase II (63385) |
Plant Address | 27234 Bouquet Canyon, Santa Clara, CA 91350 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 34.43333, -118.51084 |
Generation Dates on File | Jan 2019 to Dec 2023 |
Initial Operation Date | December 2014 |
Annual Generation | 7.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-191 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 16.50 kV |
Energy Storage | No |
Generator CA135 Details Operating December 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Summer Capacity | 3.5 MW |
Winter Capacity | 3.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 60 |
DC Net Capacity | 4.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 4.4 MW |
Virtual Net Metering Agreement | No |
Castaic Lake Phase II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2119 | Allis Medina Solar LLC CSG | Medina, NY | 7.8 GWh |
#2120 | Farmingdale FA01 | Farmingdale, ME | 7.8 GWh |
#2121 | Palmyra PV - BD Solar Palmyra LLC | Palmyra, ME | 7.8 GWh |
#2122 | Acme Solar, LLC | Riegelwood, NC | 7.8 GWh |
#2123 | Pine Hill | Johnston, RI | 7.8 GWh |
#2124 | OYA State Route 122 | Constable, NY | 7.8 GWh |
#2125 | LSE Musca Solar | Beavers Dam, NY | 7.8 GWh |
#2126 | Flowers Solar LLC | Benson, NC | 7.8 GWh |
#2127 | Bakatsias Solar | Haw River, NC | 7.8 GWh |
#2128 | Beaver Run | Lafayette Township, NJ | 7.8 GWh |
#2130 | Great Lakes Seaway Community Solar | Clayton, NY | 7.8 GWh |
#2131 | GMP Solar/Storage-Ferrisburgh Hybrid | Ferrisburgh, VT | 8.6 GWh |
#2132 | Auburn Solar Project | Auburn, MA | 7.7 GWh |
#2133 | Altona Solar, LLC | Centralia, MO | 7.8 GWh |
#2134 | Bradley PV1 | Aulander, NC | 7.7 GWh |
#2135 | Salisbury Solar | Salisbury, NC | 7.7 GWh |
#2136 | Butler Solar, LLC | Sheridan, OR | 7.7 GWh |
#2137 | GMP Solar/Storage-Milton Hybrid | Milton, VT | 8.5 GWh |
#2138 | Sugarhill Road - Solitude Solar CSG | Rexford, NY | 7.7 GWh |
#2139 | Solar Lee, LLC | Mount Olive, NC | 7.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Castaic Lake Phase II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20701 Plummer PV, LLC | Chatsworth, CA | 2.4 GWh | 13.8 mi |
8500 Balboa PV, LLC | Northridge, CA | 5.4 GWh | 14.5 mi |
Ameresco Chiquita Canyon | Castaic, CA | 32.6 GWh | 7.5 mi |
Berry Placerita Cogen | Santa Clarita, CA | 30.9 GWh | 3.5 mi |
Castaic | Castaic, CA | 16.8 GWh | 13.5 mi |
CFW Solar X LLC - Vaughn | San Fernando, CA | 1.0 GWh | 11.7 mi |
CSU Northridge Plant | Northridge, CA | 819.0 MWh | 13.2 mi |
East Portal Generator | Chatsworth, CA | 4.0 GWh | 13.5 mi |
Foothill | Sylmar, CA | 32.2 GWh | 8 mi |
Foothill Feeder | Castaic, CA | 19.6 GWh | 7.9 mi |
Maclay Solar Project | Sylmar, CA | 901.5 MWh | 9.1 mi |
MM Lopez Energy | Lake View Terrace, CA | 26.4 GWh | 11.9 mi |
Nordhoff Place | Chatsworth, CA | 1.3 GWh | 13.9 mi |
Olive View Medical Center | Sylmar, CA | 11.4 GWh | 8.3 mi |
Prairie | Chatsworth, CA | 2.9 GWh | 14 mi |
San Fernando | Sylmar, CA | 17.8 GWh | 8.4 mi |
San Francisquito 1 | Saugus, CA | 220.2 GWh | 11.3 mi |
San Francisquito 2 | Saugus, CA | 69.0 GWh | 7 mi |
Sunshine Gas Producers | Sylmar, CA | 116.8 GWh | 6.8 mi |
VA Sepulveda Ambulatory Care Center | North Hills, CA | 4.7 GWh | 12.8 mi |