Cascade Solar (TX)
10407 TX-60, Wharton, TX 77488Plant Summary Information
Cascade Solar (TX) is ranked #111 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Cascade Solar (TX) generated 4.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Cascade Solar (TX) |
---|---|
Utility Name | Cypress Creek Renewables |
Location | Wharton County, TX |
Initial Operation Date | April 2019 |
Last Update | Dec 2023 |
Annual Generation | 21.3 GWh |
Annual Consumption | 75.8 k MMBtu |
Ranked #4,983 out of 11,835 Power Plants Nationwide | |
Ranked #1,150 out of 5,643 Solar Power Plants Nationwide | |
Ranked #518 out of 749 Texas Power Plants | |
Ranked #111 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Cascade Solar (TX)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cascade Solar (TX).
Monthly Net Generation for Cascade Solar (TX)
Cascade Solar (TX) Details
Summary Information | |
---|---|
Plant Name | Cascade Solar (TX) (61875) |
Plant Address | 10407 TX-60, Wharton, TX 77488 |
Utility | Cypress Creek Renewables (61060) |
Latitude, Longitude | 29.20536, -96.02338 |
Generation Dates on File | Apr 2019 to Dec 2023 |
Initial Operation Date | April 2019 |
Annual Generation | 21.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator GEN1 Details Operating April 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 14.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cascade Solar (TX) Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1140 | Giffen Solar Park | Cantua Creek, CA | 21.9 GWh |
#1141 | Chisum | Blossom, TX | 21.9 GWh |
#1142 | RE Columbia 3 LLC | Mojave, CA | 21.9 GWh |
#1143 | Elbe Solar Center | Madras, OR | 21.8 GWh |
#1144 | Wallingford Solar | Wallingford, CT | 21.7 GWh |
#1145 | Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh |
#1146 | DG AMP Solar Piqua Manier | Piqua, OH | 21.6 GWh |
#1147 | Bear Creek Solar Center | Bend, OR | 21.5 GWh |
#1148 | Yemassee Solar | Yemassee, SC | 21.4 GWh |
#1149 | OR Solar 2, LLC | Eagle Point, OR | 21.3 GWh |
#1151 | Springerville | Springerville, AZ | 6.4 TWh |
#1152 | Brighter Future Solar | Granite Falls, NC | 21.2 GWh |
#1153 | Champion Solar | Pelion, SC | 21.2 GWh |
#1154 | Cottonwood Solar, LLC (City of Corcoran) | Corcoran, CA | 21.1 GWh |
#1155 | Midway Green Solar | Union, SC | 21.1 GWh |
#1156 | Albany Solar | Albany, MN | 21.0 GWh |
#1157 | Camp Lejeune Solar and Energy Storage | Camp Lejeune, NC | 21.0 GWh |
#1158 | Waseca Solar | Waseca, MN | 20.9 GWh |
#1159 | KIUC Kapaia PV and BA Storage Project Hybrid | Lihue, HI | 18.9 GWh |
#1160 | Cherry Blossom Solar LLC | Hemingway, SC | 20.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cascade Solar (TX).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aktina Solar | El Campo, TX | 844.6 GWh | 16.3 mi |
Bernard Creek Solar | Hungerford, TX | 309.3 GWh | 17.7 mi |
Bovine | Wallis, TX | 16.1 GWh | 29.6 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 385.6 GWh | 15.9 mi |
Brazoria West | Damon, TX | 408.5 GWh | 21.8 mi |
Bronson | Beasley, TX | 14.3 GWh | 23.2 mi |
Colorado Bend Energy Center | Wharton, TX | 2.6 TWh | 6.3 mi |
Colorado Bend II | Wharton, TX | 7.2 TWh | 6.3 mi |
Cutlass Solar 1 LLC | Richmond, TX | 209.1 GWh | 22.4 mi |
Fighting Jays Solar Project | Needville, TX | 349.0 GWh | 19.8 mi |
Fort Bend Solar LLC | East Bernard, TX | 410.5 GWh | 24.7 mi |
HEB00292 | Bay City, TX | 290.0 MWh | 15.9 mi |
Newgulf Cogen | NewGulf, TX | 32.9 GWh | 8.5 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 109.0 GWh | 30 mi |
Peyton Creek Wind Farm LLC | Bay City, TX | 392.5 GWh | 26.8 mi |
Rowland Solar II | Richmond, TX | 81.8 GWh | 19.4 mi |
South Texas Project | Wadsworth, TX | 20.2 TWh | 28.4 mi |
Sweeny Cogen Facility | Old Ocean, TX | 2.5 TWh | 19.1 mi |
Wagyu | Damon, TX | 202.2 GWh | 22.2 mi |
WAL546 | Richmond, TX | 291.0 MWh | 29 mi |