Carver Gladden CSG
13685 Highway 5, Norwood Young America, MN 55397Plant Summary Information
Carver Gladden CSG is ranked #134 out of 482 solar farms in Minnesota in terms of total annual net electricity generation.
Carver Gladden CSG generated 766.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Carver Gladden CSG |
---|---|
Utility Name | Minnesota Solar CSG 8, LLC |
Location | Carver County, MN |
Initial Operation Date | April 2018 |
Last Update | Dec 2023 |
Annual Generation | 4.7 GWh |
Annual Consumption | 16.4 k MMBtu |
Ranked #7,784 out of 11,852 Power Plants Nationwide | |
Ranked #2,860 out of 5,655 Solar Power Plants Nationwide | |
Ranked #293 out of 736 Minnesota Power Plants | |
Ranked #134 out of 482 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of Carver Gladden CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Carver Gladden CSG.
Monthly Net Generation for Carver Gladden CSG
Carver Gladden CSG Details
Summary Information | |
---|---|
Plant Name | Carver Gladden CSG (61495) |
Plant Address | 13685 Highway 5, Norwood Young America, MN 55397 |
Utility | Minnesota Solar CSG 8, LLC (61102) |
Latitude, Longitude | 44.8071, -93.8717 |
Generation Dates on File | Apr 2018 to Dec 2023 |
Initial Operation Date | April 2018 |
Annual Generation | 4.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-645, 16-646, 16-647 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 42254 Details Operating April 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Generator 42255 Details Operating April 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Generator 42256 Details Operating April 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Carver Gladden CSG Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2850 | SulusSolar22 | Silverton, OR | 4.7 GWh |
#2851 | North Palm Springs 1A | Palm Springs, CA | 4.7 GWh |
#2852 | Susquehanna University Solar | Selinsgrove, PA | 4.7 GWh |
#2853 | Hickson Solar, LLC | Wallace, SC | 4.7 GWh |
#2854 | Beloit Solar LLC | Beloit, KS | 4.7 GWh |
#2855 | Cortlandville I Solar CSG | Cortland, NY | 4.7 GWh |
#2856 | Armstrong Solar | Glenwood, MN | 4.7 GWh |
#2857 | Roger Williams - Melville at Portsmouth | Portsmouth, RI | 4.7 GWh |
#2858 | DOCCS Midstate | Marcy, NY | 4.7 GWh |
#2859 | City & County of Denver at Denver Int'l | Denver, CO | 4.7 GWh |
#2861 | VA Sepulveda Ambulatory Care Center | North Hills, CA | 4.7 GWh |
#2862 | BWC Beech Ridge Brook, LLC | Scarborough, ME | 4.7 GWh |
#2863 | Burlington Coat Factory Solar | Florence, NJ | 4.7 GWh |
#2864 | Gemini Community Solar | Scandia, MN | 4.7 GWh |
#2865 | SulusSolar33 | Sheridan, OR | 4.7 GWh |
#2866 | PVN Milliken, LLC | Ontario, CA | 4.7 GWh |
#2867 | Brookdale CC BTM at Lincroft | Lincroft, NJ | 4.7 GWh |
#2868 | Ports Jersey City Solar | Jersey City, NJ | 4.7 GWh |
#2869 | Webb Road Solar | Waterville, ME | 4.7 GWh |
#2870 | SulusSolar35 | Molalla, OR | 4.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Carver Gladden CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Andromeda Community Solar | Lester Prairie, MN | 8.3 GWh | 10.2 mi |
BentonSun LLC | Norwood Young America, MN | 8.6 GWh | 2.9 mi |
Helen CSG 1 LLC | Plato, MN | 2.3 GWh | 8.9 mi |
Helen Solar CSG | Plato, MN | 9.2 GWh | 9.3 mi |
Lake Waconia Community Solar Garden | Waconia, MN | 785.0 MWh | 5.4 mi |
Lake Waconia IV Community Solar Garden | Waconia, MN | 785.0 MWh | 5.4 mi |
Lind Solar CSG | Young America, MN | 7.6 GWh | 1.8 mi |
Nesvold Watertown Solar | Watertown, MN | 8.5 GWh | 9.2 mi |
New Germany Community Solar Garden | New Germany, MN | 1.6 GWh | 9.3 mi |
Novel Martin Solar One LLC (McLeod) CSG | Lester Prairie, MN | 1.8 GWh | 10.1 mi |
Porter Way Community Solar Garden | Waconia, MN | 4.8 GWh | 5.5 mi |
St Bonifacius | St. Bonifacius, MN | 1.3 GWh | 7.2 mi |
USS Dressen Family Solar LLC | Mayer, MN | 729.0 MWh | 6.5 mi |
USS DVL Solar CSG | Waconia, MN | 2.1 GWh | 4.3 mi |
USS Eggo Solar CSG | Cologne, MN | 2.2 GWh | 7.3 mi |
USS Hancock Solar LLC CSG | Cologne, MN | 2.2 GWh | 8.4 mi |
USS King 2 CSG | Waconia, MN | 2.2 GWh | 3.1 mi |
USS Lake Patterson Solar CSG | Cologne, MN | 2.2 GWh | 2.3 mi |
USS Westeros Solar LLC CSG | Belle Plaine, MN | 2.0 GWh | 10.1 mi |
West Waconia Solar | Norwood Young America, MN | 16.6 GWh | 1.9 mi |