Carson Ice-Gen Project
Franklin Blvd, Sacramento, CA 95758Plant Summary Information
Carson Ice-Gen Project is ranked #84 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Carson Ice-Gen Project is comprised of 3 generators and generated 54.5 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Carson Ice-Gen Project |
---|---|
Utility Name | Sacramento Municipal Util Dist |
Location | Sacramento County, CA |
Initial Operation Date | October 1995 |
Last Update | Aug 2024 |
Annual Generation | 71.3 GWh |
Annual Consumption | 907.2 k MMBtu |
Ranked #3,522 out of 11,835 Power Plants Nationwide | |
Ranked #992 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #407 out of 1,569 California Power Plants | |
Ranked #84 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of Carson Ice-Gen Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Carson Ice-Gen Project.
Monthly Net Generation for Carson Ice-Gen Project
Carson Ice-Gen Project Details
Summary Information | |
---|---|
Plant Name | Carson Ice-Gen Project (7527) |
Plant Address | Franklin Blvd, Sacramento, CA 95758 |
Utility | Sacramento Municipal Util Dist (16534) |
Latitude, Longitude | 38.44568, -121.46239 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | October 1995 |
Annual Generation | 71.3 GWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Sacramento County Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | PACIFIC GAS |
Natural Gas Storage | No |
Generator 1 Details Operating October 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41.2 MW |
Winter Capacity | 41.2 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1995 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating October 1995
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 17.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 16.6 MW |
Winter Capacity | 16.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1995 |
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CCCT Details Operating October 1995
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 51.2 MW |
Winter Capacity | 51.2 MW |
Minimum Load | 21 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Other Biomass Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / OBG |
---|
Carson Ice-Gen Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Central Valley Financing Auth | PO Box 15830, Sacramento, CA 95852 | Generator 1 | 100.00% |
Central Valley Financing Auth | PO Box 15830, Sacramento, CA 95852 | Generator 2 | 100.00% |
Central Valley Financing Auth | PO Box 15830, Sacramento, CA 95852 | Generator CCCT | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#982 | WestRock (TX) | Evadale, TX | 406.8 GWh |
#983 | Dan E Karn | Essexville, MI | 78.8 GWh |
#984 | Corpus Christi | Corpus Christi, TX | 72.9 GWh |
#985 | UMCP CHP Plant | College Park, MD | 75.5 GWh |
#986 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh |
#987 | Summit Lake | Creston, IA | 72.1 GWh |
#988 | Berry NMW Cogens | Bakersfield, CA | 71.7 GWh |
#989 | Boise Cascade International Falls | International Falls, MN | 328.9 GWh |
#990 | Western Michigan University Power Plant | Kalamazoo, MI | 71.3 GWh |
#991 | Whiting Refinery | Whiting, IN | 445.2 GWh |
#993 | Port Comfort Power LLC | Point Comfort, TX | 70.8 GWh |
#994 | Rubart | Ulysses, KS | 70.3 GWh |
#995 | Fountain Valley Power Facility | Fountain, CO | 70.3 GWh |
#996 | Nippon Dynawave Packaging Longview WA | Longview, WA | 291.9 GWh |
#997 | Berkshire Power | Agawam, MA | 70.1 GWh |
#998 | Anheuser-Busch Jacksonville | Jacksonville, FL | 69.5 GWh |
#999 | Parnassus Central Utility Plant | San Francisco, CA | 69.3 GWh |
#1000 | New York University Central Plant | New York, NY | 74.2 GWh |
#1001 | Greenville Electric Generating Station | Greenville, OH | 68.5 GWh |
#1002 | Hopewell Mill | Hopewell, VA | 284.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Carson Ice-Gen Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Department of Justice | Sacramento, CA | 4.1 GWh | 7.1 mi |
Depot Park Solar System | Sacramento, CA | 2.4 GWh | 5.9 mi |
Dept of General Services -FTB | Sacramento, CA | 5.3 GWh | 10.5 mi |
FRV SI Transport Solar LP | Sacramento, CA | 1.3 GWh | 4.8 mi |
RE Bruceville 1 LLC | Elk Grove, CA | 10.8 GWh | 7.3 mi |
RE Bruceville 2 LLC | Elk Grove, CA | 10.7 GWh | 7.3 mi |
RE Bruceville 3 LLC | Elk Grove, CA | 11.1 GWh | 7.3 mi |
RE Kammerer 1 LLC | Elk Grove, CA | 11.3 GWh | 7.1 mi |
RE Kammerer 2 LLC | Elk Grove, CA | 11.3 GWh | 7.1 mi |
RE Kammerer 3 LLC | Elk Grove, CA | 11.3 GWh | 7.1 mi |
Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.9 GWh | 9.7 mi |
Sacramento (SMUD) | Sacramento, CA | 2.1 GWh | 9.8 mi |
Sacramento Fairbain Water Treatment Plant | Sacramento, CA | 1.1 GWh | 7.9 mi |
Sacramento Point West Medical Offices | Sacramento, CA | 2.2 GWh | 10.6 mi |
Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.4 GWh | 0.2 mi |
SCA Cogen 2 | Sacramento, CA | 598.8 GWh | 6.8 mi |
SMUD at Grundman | Elk Grove, CA | 24.2 GWh | 6.2 mi |
SMUD at Lawrence | Elk Grove, CA | 4.2 GWh | 7.6 mi |
Solar Star California II LLC | Sacramento, CA | 3.5 GWh | 4.9 mi |
SPA Cogen 3 | Sacramento, CA | 632.0 GWh | 4.6 mi |