Carlls Corner
Burlington Road, Upper Deerfield Twp, NJ 8313Plant Summary Information
Carlls Corner is ranked #47 out of 55 natural gas power plants in New Jersey in terms of total annual net electricity generation.
Carlls Corner is comprised of 2 generators and generated 43.9 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Carlls Corner |
---|---|
Utility Name | Calpine New Jersey Generation LLC |
Location | Cumberland County, NJ |
Initial Operation Date | April 1973 |
Last Update | Dec 2023 |
Annual Generation | 4.5 GWh |
Annual Consumption | 88.7 k MMBtu |
Ranked #7,865 out of 11,852 Power Plants Nationwide | |
Ranked #1,750 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #159 out of 378 New Jersey Power Plants | |
Ranked #47 out of 55 New Jersey Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.1% Kerosene : 0.9% |
Map of Carlls Corner
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Carlls Corner.
Monthly Net Generation for Carlls Corner
Carlls Corner Details
Summary Information | |
---|---|
Plant Name | Carlls Corner (2379) |
Plant Address | Burlington Road, Upper Deerfield Twp, NJ 8313 |
Utility | Calpine New Jersey Generation LLC (56606) |
Latitude, Longitude | 39.4547, -75.2014 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | April 1973 |
Annual Generation | 4.5 GWh |
Fuel Types | Natural Gas : 99.1% Kerosene : 0.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 03-85 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTH JERSEY GAS COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CA1 Details Operating April 1973
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 37.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 33.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1973 |
---|---|
Planned Retirement | June 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 37.6 MW |
Net Winter Capacity With Natural Gas | 46.3 MW |
Net Summer Capacity With Oil | 36.4 MW |
Net Winter Capacity With Oil | 46.3 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CA2 Details Operating May 1973
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 41.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 39.2 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 35.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1973 |
---|---|
Planned Retirement | June 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 39.2 MW |
Net Winter Capacity With Natural Gas | 48.7 MW |
Net Summer Capacity With Oil | 39.2 MW |
Net Winter Capacity With Oil | 48.7 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Carlls Corner Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1740 | Henrietta Peaker | Lemoore, CA | 5.0 GWh |
#1741 | Watkins Manufacturing Co. | San Diego, CA | 4.9 GWh |
#1742 | York County Resource Recovery | York, PA | 248.4 GWh |
#1743 | CH Resources Beaver Falls | Beaver Falls, NY | 4.7 GWh |
#1744 | Energy Center | Redlands, CA | 4.7 GWh |
#1745 | Station H | Independence, MO | 4.7 GWh |
#1746 | University of Colorado | Boulder, CO | 4.6 GWh |
#1747 | Kingsburg Cogen | Kingsburg, CA | 4.6 GWh |
#1748 | Hardin Generator Project | Hardin, MT | 435.4 GWh |
#1749 | J Street | Lincoln, NE | 4.5 GWh |
#1751 | Mountain Home Energy Center | Mountain Home, TN | 4.6 GWh |
#1752 | Battle Creek Mill | Battle Creek, MI | 4.4 GWh |
#1753 | Columbia (MO) | Columbia, MO | 16.6 GWh |
#1754 | Lorin Industries | Muskegon, MI | 4.4 GWh |
#1755 | Major Oak Power | Bremond, TX | 2.0 TWh |
#1756 | Koda Biomass Plant | Shakopee, MN | 43.2 GWh |
#1757 | Papillion Creek Wastewater | Bellevue, NE | 6.6 GWh |
#1758 | Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh |
#1759 | Norwalk Hospital Plant | Norwalk, CT | 4.3 GWh |
#1760 | Rio Bravo Fresno | Fresno, CA | 145.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Carlls Corner.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.2 GWh | 10.2 mi |
Calpine Vineland Solar LLC | Vineland, NJ | 5.6 GWh | 7.2 mi |
CCUA Solar | Bridgeton, NJ | 2.6 GWh | 3.3 mi |
Clayville | Vineland, NJ | 87.4 GWh | 9.9 mi |
Cornerstone Power Vineland I LLC | Vineland, NJ | 3.9 GWh | 8.5 mi |
Corning Pharmaceutical Glass | Vineland, NJ | 2.9 GWh | 10.2 mi |
Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh | 5.8 mi |
Howard Down | Vineland, NJ | 85.0 GWh | 9.2 mi |
KDC Solar ASGM | Bridgeton, NJ | 6.2 GWh | 3.2 mi |
Maple Solar | Vineland, NJ | 3.3 GWh | 12 mi |
Millville City Sewer Auth WTP | Millville, NJ | 1.5 GWh | 10.5 mi |
NJ Oak Solar Plant | Bridgetown, NJ | 15.4 GWh | 5.2 mi |
Pilesgrove | Pilesgrove, NJ | 26.1 GWh | 12.4 mi |
Pittsgrove Solar | Elmer, NJ | 2.3 GWh | 5.9 mi |
Seabrook Solar Plant | Seabrook, NJ | 8.9 GWh | 2.2 mi |
Sherman Avenue | Vineland, NJ | 32.9 GWh | 7.7 mi |
The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh | 11.4 mi |
The City of Vineland at West Vineland | Vineland, NJ | 3.5 GWh | 7 mi |
Vineland Headquarters | Vineland, NJ | 1.2 GWh | 9.1 mi |
Vineland Mays Landing Solar | Millville, NJ | 6.7 GWh | 12.4 mi |