Caribou 1
1000 Caribou Road, Belden, CA 95956Plant Summary Information
Caribou 1 is ranked #77 out of 214 hydroelectric power plants in California in terms of total annual net electricity generation.
Caribou 1 is comprised of 3 generators and generated 15.8 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Caribou 1 |
---|---|
Utility Name | Pacific Gas & Electric Co. |
Location | Plumas County, CA |
Initial Operation Date | June 1921 |
Last Update | Dec 2022 |
Annual Generation | 59.9 GWh |
Annual Consumption | 215.5 k MMBtu |
Ranked #3,605 out of 11,249 Power Plants Nationwide | |
Ranked #468 out of 1,354 Water Power Plants Nationwide | |
Ranked #420 out of 1,501 California Power Plants | |
Ranked #77 out of 214 California Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Pacific Gas & Electric Co (2013 to 2016) Pacific Gas & Electric Co. (2017 to 2022) |
Map of Caribou 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Caribou 1.
Monthly Net Generation for Caribou 1
Caribou 1 Details
Summary Information | |
---|---|
Plant Name | Caribou 1 (222) |
Plant Address | 1000 Caribou Road Belden, CA 95956 |
Utility | Pacific Gas & Electric Co. (14328) |
Latitude, Longitude | 40.08548, -121.14824 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | June 1921 |
Annual Generation | 59.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | North Fork Feather River |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CARABOU_7_B12 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CARABOU_7_B12 |
Nameplate Capacity | 23.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating June 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CARBOU_7_PL2X3-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CARBOU_7_PL2X3-APND |
Nameplate Capacity | 25 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating May 1924
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CARBOU_7_PL2X3-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CARBOU_7_PL2X3-APND |
Nameplate Capacity | 25 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1924 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Caribou 1 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#458 | Victoria Dam | Rockland, MI | 61.5 GWh |
#459 | Keowee | Seneca, SC | 61.5 GWh |
#460 | Conemaugh Hydro Plant | Saltsburg, PA | 61.3 GWh |
#461 | Tims Ford | Winchester, TN | 61.2 GWh |
#462 | Foster | Foster, OR | 61.1 GWh |
#463 | Deer Rips | Auburn, ME | 60.9 GWh |
#464 | Headgate Rock | Parker, AZ | 60.7 GWh |
#465 | Little Quinnesec Falls Hydro Project | Niagara, WI | 60.7 GWh |
#466 | Seminoe | Sinclair, WY | 60.7 GWh |
#467 | Crescent | Crescent, NY | 60.6 GWh |
#469 | Deferiet | Deferiet, NY | 59.7 GWh |
#470 | Black Canyon | Emmet, ID | 59.3 GWh |
#471 | De Sabla | Magalia, CA | 59.1 GWh |
#472 | Tieton Dam Hydro Electric Project | Rimrock, WA | 58.6 GWh |
#473 | Upper Malad | Hagerman, ID | 58.3 GWh |
#474 | Brookfield Power Glen Falls Hydro | Glen Falls, NY | 57.7 GWh |
#475 | Beardslee | Little Falls, NY | 57.6 GWh |
#476 | Roza | Yakima, WA | 57.5 GWh |
#477 | Kingsley | Ogallala, NE | 57.1 GWh |
#478 | Dexter | Lowell, OR | 56.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Caribou 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Butte County | Paradise, CA | 15.3 GWh | 41.9 mi |
Belden | Belden, CA | 250.2 GWh | 7.6 mi |
Bucks Creek | Storrie, CA | 68.9 GWh | 15.4 mi |
Butt Valley | Belden, CA | 75.7 GWh | 6.6 mi |
Butte College Main Campus Solar | Oroville, CA | 7.1 GWh | 40.1 mi |
Caribou 2 | Belden, CA | 449.9 GWh | 0.1 mi |
Collins Pine Project | Chester, CA | 25.8 GWh | 15.9 mi |
Cresta | Storrie, CA | 162.4 GWh | 22.7 mi |
De Sabla | Magalia, CA | 59.1 GWh | 29.6 mi |
Edward C Hyatt | Oroville, CA | 1.9 TWh | 41.7 mi |
Forbestown | Forbestown, CA | 98.3 GWh | 37.6 mi |
Forks of Butte Hydro Project | Magalia, CA | 10.7 GWh | 29.6 mi |
High Sierra Cogeneration Plant | Susanville, CA | 36.1 GWh | 42 mi |
Kelly Ridge | Oroville, CA | 54.9 GWh | 42.4 mi |
Poe | Storrie, CA | 737.3 GWh | 30.3 mi |
Rock Creek | Storrie, CA | 551.8 GWh | 16.2 mi |
Sierra Pacific Quincy Facility | Quincy, CA | 184.7 GWh | 16.1 mi |
Sly Creek | Forbestown, CA | 22.8 GWh | 34.9 mi |
Toadtown | Magalia, CA | 3.3 GWh | 27 mi |
Woodleaf | Forbestown, CA | 162.0 GWh | 36.9 mi |