Canyon Del Oro High School Solar
25 West Calle Concordia, Oro Valley, AZ 85704Plant Summary Information
Canyon Del Oro High School Solar is ranked #83 out of 102 solar farms in Arizona in terms of total annual net electricity generation.
Canyon Del Oro High School Solar generated 572.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Canyon Del Oro High School Solar |
---|---|
Utility Name | Luminace Solar Arizona 2, LLC |
Location | Pima County, AZ |
Initial Operation Date | November 2016 |
Last Update | Dec 2023 |
Annual Generation | 2.7 GWh |
Annual Consumption | 9.7 k MMBtu |
Ranked #9,218 out of 11,835 Power Plants Nationwide | |
Ranked #4,049 out of 5,643 Solar Power Plants Nationwide | |
Ranked #134 out of 155 Arizona Power Plants | |
Ranked #83 out of 102 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Constellation Solar Arizona 2, LLC (2016 to 2021) Luminace Solar Arizona 2, LLC (2022 to 2023) |
Map of Canyon Del Oro High School Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Canyon Del Oro High School Solar.
Monthly Net Generation for Canyon Del Oro High School Solar
Canyon Del Oro High School Solar Details
Summary Information | |
---|---|
Plant Name | Canyon Del Oro High School Solar (60685) |
Plant Address | 25 West Calle Concordia, Oro Valley, AZ 85704 |
Utility | Luminace Solar Arizona 2, LLC (60404) |
Latitude, Longitude | 32.374, -110.974 |
Generation Dates on File | Dec 2016 to Dec 2023 |
Initial Operation Date | November 2016 |
Annual Generation | 2.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-19 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Tucson Electric Power Company (TEPC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tucson Electric Power Co (24211) AZ |
Grid Voltage | 13.80 kV / 0.48 kV |
Energy Storage | No |
Generator CDO3 Details Operating November 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.2 MW |
Virtual Net Metering Agreement | No |
Generator CDO4 Details Operating November 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.2 MW |
Virtual Net Metering Agreement | No |
Generator CDO1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1 MW |
Virtual Net Metering Agreement | No |
Generator CDO2 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.1 MW |
Virtual Net Metering Agreement | No |
Canyon Del Oro High School Solar Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4039 | Colleton Solar Farm | Walterboro, SC | 2.7 GWh |
#4040 | Redman North Community Solar | Brockport, NY | 2.7 GWh |
#4041 | Sonora 1 | Jamestown, CA | 2.7 GWh |
#4042 | IMPA Washington Solar Park | Washington, IN | 2.7 GWh |
#4043 | Gore Mountain Solar II | Whitehall, NY | 2.7 GWh |
#4044 | Prudential 80 Livingston Roseland Solar | Roseland, NJ | 2.7 GWh |
#4045 | Jefferson-Lewis BOCES Solar | Watertown, NY | 2.7 GWh |
#4046 | Lafayette 2 - Internal Services Dept | Los Angeles, CA | 2.7 GWh |
#4047 | Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh |
#4048 | USG 1 | El Centro, CA | 2.7 GWh |
#4050 | Ramona Solar Energy | Ramona, CA | 2.7 GWh |
#4051 | Madera 1 PV | Madera, CA | 2.7 GWh |
#4052 | Turner Rd Community Solar Project | Baldwin, NY | 2.7 GWh |
#4053 | Matrix Buildings A&B (Perth Amboy) Solar | Perth Amboy, NJ | 2.7 GWh |
#4054 | SCS West Fairchild 011958 Danville, LLC | Danville, IL | 2.7 GWh |
#4055 | CCBC-Catonsville | Catonsville, MD | 2.7 GWh |
#4056 | Syncarpha Halifax Hybrid CSG | Halifax, MA | 2.7 GWh |
#4057 | Hopkinton CSG | Hopkinton, MA | 2.7 GWh |
#4058 | Cottage Street Solar Facility | Springfield, MA | 2.7 GWh |
#4059 | Phoenix Airport Rental Car Center | Phoenix, AZ | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Canyon Del Oro High School Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Actus Lend Lease DMAFB | Tucson, AZ | 3.0 GWh | 14.7 mi |
Amazon TUS2 | Tucson, AZ | 5.3 GWh | 18.7 mi |
Amphitheater High School Solar | Tucson, AZ | 2.0 GWh | 7.3 mi |
Avra Valley Solar | Marana, AZ | 64.8 GWh | 18 mi |
Broadway 2 - Tucson Phase II | Tucson, AZ | 6.3 GWh | 18.9 mi |
Broadway 3 - Tucson Phase I | Tucson, AZ | 1.7 GWh | 18.9 mi |
Cogeneration 1 | Tucson, AZ | 55.5 GWh | 10 mi |
Cogeneration 2 | Tucson, AZ | 37.1 GWh | 9.3 mi |
Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 31.5 GWh | 14.5 mi |
Demoss Petrie | Tucson, AZ | 1.3 GWh | 8.5 mi |
H Wilson Sundt Generating Station | Tucson, AZ | 1.5 TWh | 15.3 mi |
North Loop | Tucson, AZ | 3.6 GWh | 9.1 mi |
Picture Rocks Solar, LLC | Marana, AZ | 49.0 GWh | 15.7 mi |
Pima Community College | Tucson, AZ | 2.4 GWh | 17 mi |
Pima Community College - East Campus | Tucson, AZ | 1.6 GWh | 15.8 mi |
Pima Community College NW | Tucson, AZ | 3.1 GWh | 3.8 mi |
Raptor Ridge | Tucson, AZ | 33.5 GWh | 16.7 mi |
Roger Road WWTP | Tucson, AZ | 1.1 GWh | 6.8 mi |
University of Arizona - Biosphere 2 | Oracle, AZ | 118.0 MWh | 15.8 mi |
Valencia Solar | Tucson, AZ | 26.2 GWh | 17 mi |