Canyon Del Oro High School Solar is ranked #83 out of 102 solar farms in Arizona in terms of total annual net electricity generation.

Canyon Del Oro High School Solar generated 572.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameCanyon Del Oro High School Solar
Utility NameLuminace Solar Arizona 2, LLC
LocationPima County, AZ
Initial Operation DateNovember 2016
Last Update Dec 2023
Annual Generation 2.7 GWh
Annual Consumption 9.7 k MMBtu
Ranked #9,218 out of 11,835 Power Plants Nationwide
Ranked #4,049 out of 5,643 Solar Power Plants Nationwide
Ranked #134 out of 155 Arizona Power Plants
Ranked #83 out of 102 Arizona Solar Power Plants
Fuel Types Solar
Previous Operator Constellation Solar Arizona 2, LLC (2016 to 2021)
Luminace Solar Arizona 2, LLC (2022 to 2023)

Map of Canyon Del Oro High School Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Canyon Del Oro High School Solar.

Create Your Account Today

Monthly Net Generation for Canyon Del Oro High School Solar

Canyon Del Oro High School Solar Details

Summary Information
Plant NameCanyon Del Oro High School Solar (60685)
Plant Address25 West Calle Concordia, Oro Valley, AZ 85704
UtilityLuminace Solar Arizona 2, LLC (60404)
Latitude, Longitude32.374, -110.974
Generation Dates on FileDec 2016 to Dec 2023
Initial Operation DateNovember 2016
Annual Generation 2.7 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number17-19
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityTucson Electric Power Company (TEPC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerTucson Electric Power Co (24211) AZ
Grid Voltage 13.80 kV / 0.48 kV
Energy StorageNo

Generator CDO3 Details Operating November 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.4 MW
Summer Capacity0.2 MW
Winter Capacity0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle12
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.2 MW
Virtual Net Metering AgreementNo

Generator CDO4 Details Operating November 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.2 MW
Summer Capacity0.2 MW
Winter Capacity0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle12
DC Net Capacity1 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.2 MW
Virtual Net Metering AgreementNo

Generator CDO1 Details Operating December 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.4 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle12
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1 MW
Virtual Net Metering AgreementNo

Generator CDO2 Details Operating December 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.4 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle12
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.1 MW
Virtual Net Metering AgreementNo

Canyon Del Oro High School Solar Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4039Colleton Solar FarmWalterboro, SC2.7 GWh
#4040Redman North Community SolarBrockport, NY2.7 GWh
#4041Sonora 1Jamestown, CA2.7 GWh
#4042IMPA Washington Solar ParkWashington, IN2.7 GWh
#4043Gore Mountain Solar IIWhitehall, NY2.7 GWh
#4044Prudential 80 Livingston Roseland SolarRoseland, NJ2.7 GWh
#4045Jefferson-Lewis BOCES SolarWatertown, NY2.7 GWh
#4046Lafayette 2 - Internal Services DeptLos Angeles, CA2.7 GWh
#4047Moonlight Packing - Phase 2Reedley, CA2.7 GWh
#4048USG 1El Centro, CA2.7 GWh
#4050Ramona Solar EnergyRamona, CA2.7 GWh
#4051Madera 1 PVMadera, CA2.7 GWh
#4052Turner Rd Community Solar ProjectBaldwin, NY2.7 GWh
#4053Matrix Buildings A&B (Perth Amboy) SolarPerth Amboy, NJ2.7 GWh
#4054SCS West Fairchild 011958 Danville, LLCDanville, IL2.7 GWh
#4055CCBC-CatonsvilleCatonsville, MD2.7 GWh
#4056Syncarpha Halifax Hybrid CSGHalifax, MA2.7 GWh
#4057Hopkinton CSGHopkinton, MA2.7 GWh
#4058Cottage Street Solar FacilitySpringfield, MA2.7 GWh
#4059Phoenix Airport Rental Car CenterPhoenix, AZ2.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Canyon Del Oro High School Solar.

Plant NamePlant LocationAnnual GenerationDistance
Actus Lend Lease DMAFBTucson, AZ3.0 GWh14.7 mi
Amazon TUS2Tucson, AZ5.3 GWh18.7 mi
Amphitheater High School SolarTucson, AZ2.0 GWh7.3 mi
Avra Valley SolarMarana, AZ64.8 GWh18 mi
Broadway 2 - Tucson Phase IITucson, AZ6.3 GWh18.9 mi
Broadway 3 - Tucson Phase ITucson, AZ1.7 GWh18.9 mi
Cogeneration 1Tucson, AZ55.5 GWh10 mi
Cogeneration 2Tucson, AZ37.1 GWh9.3 mi
Davis Monthan AFB (AZ) West AirfieldTucson, AZ31.5 GWh14.5 mi
Demoss PetrieTucson, AZ1.3 GWh8.5 mi
H Wilson Sundt Generating StationTucson, AZ1.5 TWh15.3 mi
North LoopTucson, AZ3.6 GWh9.1 mi
Picture Rocks Solar, LLCMarana, AZ49.0 GWh15.7 mi
Pima Community CollegeTucson, AZ2.4 GWh17 mi
Pima Community College - East CampusTucson, AZ1.6 GWh15.8 mi
Pima Community College NWTucson, AZ3.1 GWh3.8 mi
Raptor RidgeTucson, AZ33.5 GWh16.7 mi
Roger Road WWTPTucson, AZ1.1 GWh6.8 mi
University of Arizona - Biosphere 2Oracle, AZ118.0 MWh15.8 mi
Valencia SolarTucson, AZ26.2 GWh17 mi