Canton North Carolina
175 Main Street, Canton, NC 28716Plant Summary Information
Canton North Carolina is ranked #30 out of 858 power plants in North Carolina in terms of total annual net electricity generation.
Canton North Carolina is comprised of 6 generators and generated 82.8 GWh during the 3-month period between February 2023 to May 2023.
Plant Name | Canton North Carolina |
---|---|
Utility Name | Blue Ridge Paper Products Inc |
Location | Haywood County, NC |
Initial Operation Date | January 1937 |
Last Update | May 2023 |
Annual Generation | 309.4 GWh |
Annual Consumption | 18.8 M MMBtu |
Ranked #1,863 out of 11,249 Power Plants Nationwide | |
Ranked #62 out of 82 Black Liquor Power Plants Nationwide | |
Ranked #30 out of 858 North Carolina Power Plants | |
Ranked #4 out of 5 North Carolina Black Liquor Power Plants | |
Fuel Types | Black Liquor : 43.5% Bituminous Coal : 33.5% Natural Gas : 17.3% Distillate Fuel Oil : 4.2% Wood/Wood Waste Solids : 1.4% |
Map of Canton North Carolina
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Canton North Carolina.
Monthly Net Generation for Canton North Carolina
Canton North Carolina Details
Summary Information | |
---|---|
Plant Name | Canton North Carolina (50244) |
Plant Address | 175 Main Street Canton, NC 28716 |
Utility | Blue Ridge Paper Products Inc (23815) |
Latitude, Longitude | 35.535, -82.8411 |
Generation Dates on File | Jan 2001 to May 2023 |
Initial Operation Date | January 1937 |
Annual Generation | 309.4 GWh |
Fuel Types | Black Liquor : 43.5% Bituminous Coal : 33.5% Natural Gas : 17.3% Distillate Fuel Oil : 4.2% Wood/Wood Waste Solids : 1.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | (322122) |
Sector | Industrial CHP (7) |
Water Source | Pigeon River |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PUBLIC SVC CO OF NORTH CAROLINA |
Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
Natural Gas Storage | No |
Generator GEN8 Details Operating January 1937
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1937 |
Planned Retirement | May 2023 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Gaseous Propane / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / NG / WDS / BLQ / DFO |
---|
Generator GEN9 Details Operating January 1941
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1941 |
Planned Retirement | May 2023 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Gaseous Propane / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / NG / WDS / BLQ / DFO |
---|
Generator GN10 Details Operating January 1946
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1946 |
Planned Retirement | June 2023 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Gaseous Propane / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / NG / WDS / BLQ / DFO |
---|
Generator GN11 Details Operating January 1949
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1949 |
Planned Retirement | May 2023 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Gaseous Propane / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / NG / WDS / BLQ / DFO |
---|
Generator GN12 Details Operating January 1952
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1952 |
Planned Retirement | May 2023 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Gaseous Propane / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / NG / WDS / BLQ / DFO |
---|
Generator GN13 Details Operating June 1979
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 12.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 6.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1979 |
Planned Retirement | May 2023 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Bituminous Coal / Natural Gas / Wood/Wood Waste Solids |
Startup Source | Natural Gas / Gaseous Propane / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Stoker Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / NG / WDS / BLQ / DFO |
---|
Canton North Carolina Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#52 | Georgia-Pacific Palatka Operations | Palatka, FL | 318.4 GWh |
#53 | International Paper - Orange | Orange, TX | 298.1 GWh |
#54 | WestRock (WA) | Tacoma, WA | 255.4 GWh |
#55 | Inland Paperboard Packaging Rome | Rome, GA | 454.0 GWh |
#56 | Escanaba Mill | Escanaba, MI | 413.7 GWh |
#57 | Buckeye Florida LP | Perry, FL | 292.1 GWh |
#58 | Nippon Dynawave Packaging Longview WA | Longview, WA | 310.7 GWh |
#59 | International Paper Riverdale Mill | Selma, AL | 450.6 GWh |
#60 | Hopewell Mill | Hopewell, VA | 318.6 GWh |
#61 | Longview Fibre | Longview, WA | 228.9 GWh |
#63 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 197.8 GWh |
#64 | U S Alliance Coosa Pines | Coosa Pines, AL | 160.5 GWh |
#65 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 276.0 GWh |
#66 | International Paper Vicksburg Mill | Vicksburg, MS | 226.8 GWh |
#67 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 197.2 GWh |
#68 | Kaukauna Paper Mill | Kaukauna, WI | 130.3 GWh |
#69 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 184.4 GWh |
#70 | Clearwater Paper APP CB | Arkansas City, AR | 111.8 GWh |
#71 | St Francisville Mill | St. Francisville, LA | 131.0 GWh |
#72 | IP Springfield Oregon | Springfield, OR | 95.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Canton North Carolina.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Asheville | Arden, NC | 4.1 TWh | 17.4 mi |
Bear Creek Dam | Tuckasegee, NC | 26.2 GWh | 24 mi |
Biltmore Solar Fields | Asheville, NC | 468.0 MWh | 14.3 mi |
Cedar Cliff | Tuckasegee, NC | 17.7 GWh | 24.3 mi |
Franklin (NC) | Franklin, NC | 5.8 GWh | 37 mi |
Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 929.0 MWh | 24.6 mi |
Innovative Solar 10 | Canton, NC | 2.8 GWh | 5.1 mi |
Innovative Solar 14, LLC | Hendersonville, NC | 3.5 GWh | 29.5 mi |
Innovative Solar 16 | Hendersonville, NC | 3.4 GWh | 30.1 mi |
Innovative Solar 6 | Leicester, NC | 6.6 GWh | 11.2 mi |
Lake Lure | Lake Lure, NC | 3.5 GWh | 37.7 mi |
Marshall Dam | Marshall, NC | 1.2 GWh | 13.7 mi |
Metropolitan Sewerage District | Asheville, NC | 6.0 GWh | 15.7 mi |
Sawtell Solar | Hendersonville, NC | 5.1 GWh | 28.3 mi |
Tennessee Creek | Tuckasegee, NC | 36.6 GWh | 24 mi |
Thorpe | Tuckasegee, NC | 78.5 GWh | 26.2 mi |
Tuckasegee | Tuckasegee, NC | 6.1 GWh | 25.6 mi |
Turner Shoals | Mill Springs, NC | 12.0 GWh | 39.4 mi |
Tuxedo | Flat Rock, NC | 21.9 GWh | 32.4 mi |
Walters | Waterville, NC | 333.5 GWh | 16.1 mi |