Caney River Wind Project
1201 RD 7, Howard, KS 67349Plant Summary Information
Caney River Wind Project is ranked #31 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Caney River Wind Project generated 127.1 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Caney River Wind Project |
---|---|
Utility Name | Caney River Wind Project |
Location | Elk County, KS |
Initial Operation Date | November 2011 |
Last Update | Jan 2025 |
Annual Generation | 644.2 GWh |
Annual Consumption | 2.4 M MMBtu |
Ranked #1,051 out of 11,979 Power Plants Nationwide | |
Ranked #235 out of 1,359 Wind Power Plants Nationwide | |
Ranked #31 out of 152 Kansas Power Plants | |
Ranked #23 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Caney River Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Caney River Wind Project.
Monthly Net Generation for Caney River Wind Project
Caney River Wind Project Details
Summary Information | |
---|---|
Plant Name | Caney River Wind Project (57858) |
Plant Address | 1201 RD 7, Howard, KS 67349 |
Utility | Caney River Wind Project (57191) |
Latitude, Longitude | 37.46, -96.42 |
Generation Dates on File | Nov 2011 to Jan 2025 |
Initial Operation Date | November 2011 |
Annual Generation | 644.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Westar Energy Inc (22500) KS |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 111 |
Turbine Details | |
Number Of Turbines | 111 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V90-1.8 |
Design Wind Speed | 23 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 344 |
Caney River Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#225 | Bloom Wind | Minneola, KS | 665.8 GWh |
#226 | Brady II Wind Energy Center | Dickinson, ND | 661.0 GWh |
#227 | Solano Wind | Rio Vista, CA | 660.6 GWh |
#228 | Glacier Sands Wind Power, LLC | Mason City, IL | 660.3 GWh |
#229 | Kelly Creek Wind Project | Cabery, IL | 659.5 GWh |
#230 | Peetz Table Wind Energy | Peetz, CO | 653.2 GWh |
#231 | Goodnight | Claude, TX | 651.5 GWh |
#232 | Wildcat Wind Farm I, LLC | Elwood, IN | 649.9 GWh |
#233 | Sundance Wind Project, LLC | Alva, OK | 646.3 GWh |
#234 | Chickasaw Wind Farm | New Hampton, IA | 644.6 GWh |
#236 | Wildorado Wind LLC | Vega, TX | 643.2 GWh |
#237 | Coyote Wind LLC | Snyder, TX | 642.8 GWh |
#238 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 632.8 GWh |
#239 | Wild Horse | Ellensburg, WA | 631.5 GWh |
#240 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 627.7 GWh |
#241 | Sweetwater Wind 4 LLC | Roscoe, TX | 627.6 GWh |
#242 | Jayhawk Wind Energy Center | Hepler, KS | 627.2 GWh |
#243 | Raymond Wind Farm, LLC | Lyford, TX | 625.4 GWh |
#244 | Tatanka Ridge | Toronto, SD | 623.8 GWh |
#245 | Boiling Springs Wind Farm | Woodward, OK | 623.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Caney River Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Augusta Electric Plant No 2 | Augusta, KS | 1.4 GWh | 33.7 mi |
Chanute 2 | Chanute, KS | 79.2 GWh | 55.1 mi |
Chanute 3 | Chanute, KS | 694.0 MWh | 53.4 mi |
CML&P Generating Facility No. 2 | Coffeyville, KS | 93.2 GWh | 52.4 mi |
Coffeyville | Coffeyville, KS | 10.9 GWh | 53.1 mi |
DeGraff Butler Electric | Burns, KS | 2.4 GWh | 43.6 mi |
East 12th Street | Winfield, KS | 3.7 GWh | 33.6 mi |
El Dorado Refinery | El Dorado, KS | 221.7 GWh | 34 mi |
Elk River Wind | Beaumont, KS | 287.8 GWh | 10.9 mi |
Fredonia | Fredonia, KS | 15.0 MWh | 33.7 mi |
Kay Wind, LLC | Newkirk, OK | 978.5 GWh | 51.2 mi |
Mulvane 2 | Mulvane, KS | 20.0 MWh | 44 mi |
Osage Wind, LLC | Burbank, OK | 511.9 GWh | 54.3 mi |
Oxford (KS) | Oxford, KS | 6.0 MWh | 42.8 mi |
Pawhuska | Pawhuska, OK | 375.0 MWh | 54.8 mi |
Prairie Sky Solar Farm | Andover, KS | 1.8 GWh | 41.1 mi |
Slate Creek Wind Project LLC | Geuda Springs, KS | 512.0 GWh | 50.9 mi |
Waste Water Plant Generator | Winfield, KS | 3.0 MWh | 35.2 mi |
Wellington 2 | Wellington, KS | 2.7 GWh | 52.8 mi |
West 14th Street | Winfield, KS | 1.1 GWh | 36 mi |