Candace Solar
4838 US70-ALT, Princeton, NC 27569Plant Summary Information
Candace Solar is ranked #302 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Candace Solar generated 1.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Candace Solar |
---|---|
Utility Name | Cypress Creek Renewables |
Location | Johnston County, NC |
Initial Operation Date | August 2016 |
Last Update | Dec 2023 |
Annual Generation | 9.0 GWh |
Annual Consumption | 32.2 k MMBtu |
Ranked #6,224 out of 11,835 Power Plants Nationwide | |
Ranked #1,762 out of 5,643 Solar Power Plants Nationwide | |
Ranked #376 out of 862 North Carolina Power Plants | |
Ranked #302 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Sunlight Partners (2014 to 2014) Candace Solar LLC (2015 to 2017) Cypress Creek Renewables (2018 to 2023) |
Map of Candace Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Candace Solar.
Monthly Net Generation for Candace Solar
Candace Solar Details
Summary Information | |
---|---|
Plant Name | Candace Solar (59499) |
Plant Address | 4838 US70-ALT, Princeton, NC 27569 |
Utility | Cypress Creek Renewables (61060) |
Latitude, Longitude | 35.487, -78.1922 |
Generation Dates on File | Aug 2016 to Dec 2023 |
Initial Operation Date | August 2016 |
Annual Generation | 9.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-545-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator PV1 Details Operating August 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Candace Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1752 | Winton Solar | Winton, NC | 9.0 GWh |
#1753 | South Winston Farm, LLC | Winston-Salem, NC | 9.0 GWh |
#1754 | Barker Solar, LLC | Lumberton, NC | 9.0 GWh |
#1755 | Sadiebrook NC Solar | Clarkton, NC | 9.0 GWh |
#1756 | Van Epps Solar | Fultonville, NY | 9.0 GWh |
#1757 | IGS KSBD | Highland, CA | 9.0 GWh |
#1758 | Franklinton Solar | Franklinton, NC | 9.0 GWh |
#1759 | Vicksburg Solar | Henderson, NC | 9.0 GWh |
#1760 | Van Slyke Solar Center, LLC | Elm City, NC | 9.0 GWh |
#1761 | Woodland Church Farm | Albertson, NC | 9.0 GWh |
#1763 | Gates Solar LLC | Eure, NC | 9.0 GWh |
#1764 | Washington Airport Solar LLC | Washington, NC | 9.0 GWh |
#1765 | Bantam Solar | Saint Johnsville, NY | 9.0 GWh |
#1766 | Tamworth Holdings | Garland, NC | 9.0 GWh |
#1767 | Kinston Davis Farm | Kinston, NC | 9.0 GWh |
#1768 | Moorings Farm 2, LLC | LaGrange, NC | 9.0 GWh |
#1769 | Sonne Two | Newton, NC | 9.0 GWh |
#1770 | Meriwether Farm | Oxford, NC | 9.0 GWh |
#1771 | Mill Pond Solar Farm, LLC | Whiteville, NC | 9.0 GWh |
#1772 | Pollocksville Solar | Pollocksville, NC | 9.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Candace Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AM Best Farm | Goldsboro, NC | 8.9 GWh | 12.5 mi |
Bizzell Church Solar 1, LLC | Selma, NC | 9.3 GWh | 4.4 mi |
Bizzell Church Solar 2 | Selma, NC | 8.5 GWh | 4.1 mi |
Blueberry One | Grantham, NC | 9.3 GWh | 12.2 mi |
ESA Selma | Selma, NC | 2.6 GWh | 6.1 mi |
ESA Smithfield | Smithfield, NC | 3.0 GWh | 7.2 mi |
Highwater Solar I | Stoney Creek, NC | 9.6 GWh | 12 mi |
Keen Farm | Four Oaks, NC | 8.8 GWh | 12.4 mi |
Lane II Solar, LLC | Goldsboro, NC | 10.4 GWh | 9.9 mi |
Lane Solar | Goldsboro, NC | 9.7 GWh | 10.2 mi |
Lee Combined Cycle Plant | Goldsboro, NC | 6.5 TWh | 9.7 mi |
Nitro Solar | Smitfield, NC | 8.5 GWh | 6.8 mi |
Pikeville Farm | Pikeville, NC | 9.7 GWh | 12 mi |
Princeton | Princeton, NC | 8.2 GWh | 1.2 mi |
Red Toad 4451 Buffalo Road, LLC | Selma, NC | 4.0 GWh | 7.7 mi |
Red Toad 5840 Buffalo Road, LLC | Selma, NC | 4.4 GWh | 8.6 mi |
Rosewood Solar | Goldsboro, NC | 3.9 GWh | 5.9 mi |
Selma Solar LLC | Selma, NC | 7.6 GWh | 6.2 mi |
Wayne County | Goldsboro, NC | 90.7 GWh | 9.3 mi |
Wellons Farm | Smithfield, NC | 9.2 GWh | 5.8 mi |