Campo Verde Solar
1148 Liebert Road, El Centro, CA 92249Plant Summary Information
Campo Verde Solar is ranked #33 out of 747 solar farms in California in terms of total annual net electricity generation.
Campo Verde Solar generated 93.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Campo Verde Solar |
---|---|
Utility Name | Southern Power Co |
Location | Imperial County, CA |
Initial Operation Date | October 2013 |
Last Update | Dec 2022 |
Annual Generation | 363.2 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,695 out of 11,249 Power Plants Nationwide | |
Ranked #102 out of 5,158 Solar Power Plants Nationwide | |
Ranked #134 out of 1,501 California Power Plants | |
Ranked #33 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Energy LLC (2013 to 2013) Southern Power Co (2014 to 2022) |
Map of Campo Verde Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Campo Verde Solar.
Monthly Net Generation for Campo Verde Solar
Campo Verde Solar Details
Summary Information | |
---|---|
Plant Name | Campo Verde Solar (58467) |
Plant Address | 1148 Liebert Road El Centro, CA 92249 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 32.75333, -115.72639 |
Generation Dates on File | Sep 2013 to Dec 2022 |
Initial Operation Date | October 2013 |
Annual Generation | 363.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG14-33-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator CVS1 Details Operating October 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 147.4 MW |
Summer Capacity | 139 MW |
Winter Capacity | 139 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 201.9 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Campo Verde Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Campo Verde Solar, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#92 | Skipjack Solar Center | Wayside, VA | 389.1 GWh |
#93 | Copper Mountain Solar 2 | Boulder City, NV | 381.0 GWh |
#94 | North Rosamond Solar LLC | Rosamond, CA | 378.7 GWh |
#95 | Elora Solar | Elora, TN | 378.7 GWh |
#96 | Quitman Solar | Quitman, GA | 373.0 GWh |
#97 | Quitman II Solar | Quitman, GA | 372.6 GWh |
#98 | Camilla Solar Energy Project | Camilla, GA | 371.7 GWh |
#99 | Big River Solar | Norris City, IL | 370.9 GWh |
#100 | Dunn's Bridge 1 Solar | Wheatfield, IN | 370.6 GWh |
#101 | Arlington Valley Solar Energy II | Arlington, AZ | 370.4 GWh |
#103 | Sun Streams 2 | Hassayampa, AZ | 362.8 GWh |
#104 | Yellowbud Solar, LLC | Williamsport, OH | 362.4 GWh |
#105 | Edwards Sanborn E1B | Mojave, CA | 355.0 GWh |
#106 | Maverick Solar 7, LLC | Desert Center, CA | 361.1 GWh |
#107 | Lily Solar Hybrid | Scurry, TX | 358.4 GWh |
#108 | Concho Valley Solar, LLC | San Angelo, TX | 359.0 GWh |
#109 | Oberon IA | Odessa, TX | 356.2 GWh |
#110 | Imperial Valley Solar, LLC | Calexico, CA | 354.8 GWh |
#111 | Blythe Solar II, LLC | Blythe, CA | 344.9 GWh |
#112 | Cove Mountain Solar 2 | Beryl, UT | 351.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Campo Verde Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Centinela Solar Energy | Calexico, CA | 523.7 GWh | 6.5 mi |
Centinela State Prison | Sacramento, CA | 17.8 GWh | 6 mi |
Drew Solar LLC | Calexico, CA | 320.2 GWh | 5.8 mi |
El Centro Hybrid | El Centro, CA | 1.2 TWh | 11.3 mi |
Heber Geothermal | Heber, CA | 174.7 GWh | 12.4 mi |
Heber Solar | Heber, CA | 26.8 GWh | 11.2 mi |
Imperial Solar Energy Center South | Calexico, CA | 302.7 GWh | 7.4 mi |
Imperial Solar Energy Center West | Seeley, CA | 444.2 GWh | 3.3 mi |
Imperial Valley Solar, LLC | Calexico, CA | 354.8 GWh | 9.9 mi |
IVC Solar | Imperial, CA | 5.4 GWh | 13.9 mi |
Mount Signal Solar Farm II | Calexico, CA | 399.8 GWh | 8.1 mi |
Mount Signal Solar Farm V | Calexico, CA | 668.7 GWh | 10.6 mi |
Second Imperial Geothermal | Heber, CA | 159.6 GWh | 11.4 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.5 GWh | 3.8 mi |
SEPV Imperial Dixieland West | Imperial, CA | 8.1 GWh | 4.2 mi |
Sol Orchard El Centro PV | El Centro, CA | 45.3 GWh | 11 mi |
Spreckels Sugar Company | Brawley, CA | 22.9 GWh | 14.3 mi |
USG 1 | El Centro, CA | 3.0 GWh | 8.1 mi |
USG 2 | El Centro, CA | 1.8 GWh | 8.4 mi |
Wistaria Ranch Solar | Calexico, CA | 297.0 GWh | 8.2 mi |