Caledonia
255 Lone Oak Rd., Steens, MS 39766Plant Summary Information
Caledonia is ranked #7 out of 52 power plants in Mississippi in terms of total annual net electricity generation.
Caledonia is comprised of 6 generators and generated 1.5 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Caledonia |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Lowndes County, MS |
Initial Operation Date | June 2003 |
Last Update | Aug 2024 |
Annual Generation | 4.8 TWh |
Annual Consumption | 36.7 M MMBtu |
Ranked #228 out of 11,835 Power Plants Nationwide | |
Ranked #115 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #7 out of 52 Mississippi Power Plants | |
Ranked #6 out of 31 Mississippi Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Caledonia
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Caledonia.
Monthly Net Generation for Caledonia
Caledonia Details
Summary Information | |
---|---|
Plant Name | Caledonia (55197) |
Plant Address | 255 Lone Oak Rd., Steens, MS 39766 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 33.6464, -88.2717 |
Generation Dates on File | Mar 2003 to Aug 2024 |
Initial Operation Date | June 2003 |
Annual Generation | 4.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-137-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
Natural Gas Storage | No |
Generator CTG1 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCC1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 161 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157 MW |
Winter Capacity | 187 MW |
Minimum Load | 131.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CTG2 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCC2 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 161 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157 MW |
Winter Capacity | 187 MW |
Minimum Load | 131.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CTG3 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCC3 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 161 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 157 MW |
Winter Capacity | 187 MW |
Minimum Load | 131.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG1 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCC1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 106 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 98 MW |
Winter Capacity | 105 MW |
Minimum Load | 73.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG2 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCC2 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 106 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 98 MW |
Winter Capacity | 105 MW |
Minimum Load | 73.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG3 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCC3 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 106 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 98 MW |
Winter Capacity | 105 MW |
Minimum Load | 73.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Caledonia Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator CTG1 | 100.00% |
GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator CTG2 | 100.00% |
GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator CTG3 | 100.00% |
GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator STG1 | 100.00% |
GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator STG2 | 100.00% |
GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator STG3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#105 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.0 TWh |
#106 | CPV Valley Energy Center | Wawayanda, NY | 5.0 TWh |
#107 | H L Culbreath Bayside Power Station | Tampa, FL | 4.9 TWh |
#108 | Jasper | Hardeeville, SC | 4.9 TWh |
#109 | Redbud Power Plant | Luther, OK | 4.9 TWh |
#110 | TVA Southaven Combined Cycle | Southaven, MS | 4.8 TWh |
#111 | Ouachita | Sterlington, LA | 4.8 TWh |
#112 | Batesville Generation Facility | Batesville, MS | 4.8 TWh |
#113 | West Riverside Energy Center | Beloit, WI | 4.8 TWh |
#114 | Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 4.7 TWh |
#116 | Keys Energy Center | Brandywine, MD | 4.7 TWh |
#117 | Potomac Energy Center, LLC | Leesburg, VA | 4.7 TWh |
#118 | Coughlin Power Station | St Landry, LA | 4.6 TWh |
#119 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.7 TWh |
#120 | Kiamichi Energy Facility | Kiowa, OK | 4.6 TWh |
#121 | Fort St Vrain | Platteville, CO | 4.6 TWh |
#122 | High Desert Power Plant | Victorville, CA | 4.6 TWh |
#123 | Kendall County Generation Facility | Minooka, IL | 4.6 TWh |
#124 | Tenaska Virginia Generating Station | Scottsville, VA | 4.6 TWh |
#125 | Dearborn Industrial Generation | Dearborn, MI | 5.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Caledonia.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bankhead Dam | Northport, AL | 138.7 GWh | 54.3 mi |
Choctaw County | French Camp, MS | 5.4 TWh | 70.7 mi |
Colbert | Tuscumbia, AL | 78.7 GWh | 79.6 mi |
Columbus MS | Columbus, MS | 462.4 GWh | 22.6 mi |
Greene County | Demopolis, AL | 1.2 TWh | 77.6 mi |
Holt Dam | Tuscaloosa, AL | 154.5 GWh | 54.6 mi |
James H Miller Jr | Quinton, AL | 17.1 TWh | 69.7 mi |
Kemper County | De Kalb, MS | 3.4 GWh | 61.7 mi |
Lewis Smith Dam | Jasper, AL | 233.4 GWh | 69.9 mi |
Meridian | Meridian, MS | 434.0 MWh | 78.1 mi |
Meridian II | Meridian, MS | 7.5 GWh | 77.6 mi |
Meridian III | Meridian, MS | 120.3 GWh | 83.9 mi |
Muscle Shoals | Cherokee, AL | 437.0 GWh | 80.4 mi |
OE_MS6 | St.Artesia, MS | 114.9 GWh | 25.7 mi |
Prairie Bluff | Houston, MS | 7.8 GWh | 46.5 mi |
Quantum Choctaw Power LLC | Ackerman, MS | 2.8 TWh | 57.1 mi |
Ratcliffe | De Kalb, MS | 4.2 TWh | 74.2 mi |
Red Hills Generating Facility | Ackerman, MS | 1.7 TWh | 57.6 mi |
SR Houston | Houston, MS | 2.8 GWh | 46 mi |
Westervelt Moundville Cogen | Moundville, AL | 32.7 GWh | 59.3 mi |