CalCity Solar 1
9101 Mendiburu Road, California City, CA 93505Plant Summary Information
CalCity Solar 1 is ranked #338 out of 799 solar farms in California in terms of total annual net electricity generation.
CalCity Solar 1 generated 793.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | CalCity Solar 1 |
---|---|
Utility Name | CalCity Solar 1, LLC |
Location | Kern County, CA |
Initial Operation Date | November 2019 |
Last Update | Dec 2023 |
Annual Generation | 7.4 GWh |
Annual Consumption | 26.3 k MMBtu |
Ranked #6,827 out of 11,852 Power Plants Nationwide | |
Ranked #2,217 out of 5,655 Solar Power Plants Nationwide | |
Ranked #943 out of 1,570 California Power Plants | |
Ranked #338 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
CalCity Solar 1 , LLC (2019 to 2020) CalCity Solar 1, LLC (2021 to 2023) |
Map of CalCity Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CalCity Solar 1.
Monthly Net Generation for CalCity Solar 1
CalCity Solar 1 Details
Summary Information | |
---|---|
Plant Name | CalCity Solar 1 (63054) |
Plant Address | 9101 Mendiburu Road, California City, CA 93505 |
Utility | CalCity Solar 1, LLC (62885) |
Latitude, Longitude | 35.14137, -117.96575 |
Generation Dates on File | Nov 2019 to Dec 2023 |
Initial Operation Date | November 2019 |
Annual Generation | 7.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF19-1696 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator CALTR Details Operating November 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 3.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
CalCity Solar 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2207 | North Kern State Prison Phase II | Delano, CA | 7.5 GWh |
#2208 | Northfield Holdco CSG | Northfield, MN | 7.4 GWh |
#2209 | ACE-Stanton A PV | Orlando, FL | 7.4 GWh |
#2210 | Rensselaer Solar Site 2 | Rensselaer, IN | 7.4 GWh |
#2211 | Plott Hound Solar | New Bern, NC | 7.4 GWh |
#2212 | Ahoskie | Ahoskie, NC | 7.4 GWh |
#2213 | Bar D | Meeker, CO | 7.4 GWh |
#2214 | Cicero Energy Storage 1 LLC | East Syracuse, NY | 7.4 GWh |
#2215 | SR Jonesborough | Jonesborough, TN | 7.4 GWh |
#2216 | BWC Origination 18 | Mattapoisett, MA | 7.4 GWh |
#2218 | Venture 1 - 1A CSG | Aurora, CO | 7.4 GWh |
#2219 | Farmington Holdco Solar | Farmington, MN | 7.4 GWh |
#2220 | McDougle-Mitchell Solar Project Hybrid CSG | Charlton, MA | 7.3 GWh |
#2221 | Blanchard Road 2 Community Solar | Clayton, NY | 7.4 GWh |
#2222 | Dennis Landfill | Dennis, MA | 7.4 GWh |
#2223 | East Brookfield Adams Road Solar LLC CSG | East Brookfield, MA | 7.4 GWh |
#2224 | Rollingstone Holdco CSG | Rollingstone, MN | 7.4 GWh |
#2225 | East Nash PV2 | Spring Hope, NC | 7.4 GWh |
#2226 | Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.4 GWh |
#2227 | Iron Horse Solar 4, LLC | North Billerica, MA | 7.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CalCity Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beacon Solar Plant Site 2 | Cantil, CA | 112.3 GWh | 8.8 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 93.2 GWh | 8.4 mi |
California City | California City, CA | 5.3 GWh | 1.4 mi |
Difwind Farms Ltd VI | Mojave, CA | 15.3 GWh | 13.2 mi |
Edwards Sanborn E1B | Mojave, CA | 333.6 GWh | 14.2 mi |
Edwards Sanborn E5 | Mojave, CA | 132.1 GWh | 13.7 mi |
Edwards Sanborn S1 | Mojave, CA | 93.1 GWh | 12.3 mi |
Edwards Sanborn S3 | Mojave, CA | 80.0 GWh | 12.4 mi |
Edwards Sanborn S4 | Mojave, CA | 71.6 GWh | 12.4 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 128.8 GWh | 9.3 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 132.9 GWh | 8.2 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 114.0 GWh | 8.5 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 14.3 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 13.9 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 7.3 mi |
RE Columbia 3 LLC | Mojave, CA | 21.9 GWh | 13.8 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 14.1 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 244.9 GWh | 2.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 7.5 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 7.5 mi |