Calabro Airport North Solar Project
192 Flower Hill Dr, Shirley, NY 11967Plant Summary Information
Calabro Airport North Solar Project is ranked #304 out of 378 solar farms in New York in terms of total annual net electricity generation.
Calabro Airport North Solar Project generated 669.9 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Calabro Airport North Solar Project |
---|---|
Utility Name | CVI Renewables Holdings, LLC. |
Location | Suffolk County, NY |
Initial Operation Date | December 2019 |
Last Update | Dec 2022 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.8 k MMBtu |
Ranked #9,169 out of 11,249 Power Plants Nationwide | |
Ranked #4,002 out of 5,158 Solar Power Plants Nationwide | |
Ranked #617 out of 748 New York Power Plants | |
Ranked #304 out of 378 New York Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Agilitas Energy, LLC (2019 to 2019) CVI Renewables Holdings, LLC. (2020 to 2022) |
Map of Calabro Airport North Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Calabro Airport North Solar Project.
Monthly Net Generation for Calabro Airport North Solar Project
Calabro Airport North Solar Project Details
Summary Information | |
---|---|
Plant Name | Calabro Airport North Solar Project (63497) |
Plant Address | 192 Flower Hill Dr Shirley, NY 11967 |
Utility | CVI Renewables Holdings, LLC. (63970) |
Latitude, Longitude | 40.8224, -72.875 |
Generation Dates on File | Jan 2020 to Dec 2022 |
Initial Operation Date | December 2019 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-276-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator NORTH Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Parabolic Trough | No |
Power Tower | No |
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Calabro Airport North Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3992 | Calabro Airport South Solar Project | Shirley, NY | 2.4 GWh |
#3993 | Bed Bath & Beyond DC Port Reading NJ | Port Reading, NJ | 2.4 GWh |
#3994 | Springer Solar 1 | Springer, NM | 2.4 GWh |
#3995 | Whately Solar | Whately, MA | 2.4 GWh |
#3996 | Lane Ave Solar LLC | North Brookfield, MA | 2.4 GWh |
#3997 | IKEA Westhampton 061 | Westampton, NJ | 2.4 GWh |
#3998 | USS Itasca Clean Energy Solar LLC | Grand Rapids, MN | 2.4 GWh |
#3999 | Corvias - Fort Riley II | Fort Riley, KS | 2.4 GWh |
#4000 | Epic Verona | Verona, WI | 2.6 GWh |
#4001 | Southbridge Solar | Southbridge, MA | 2.4 GWh |
#4003 | IKEA New Haven Rooftop PV & Fuel Cell | New Haven, CT | 3.9 GWh |
#4004 | BWC Pocasset River | Wareham, MA | 2.4 GWh |
#4005 | BWC Swan Pond River CSG | Rehoboth, MA | 2.4 GWh |
#4006 | DG AMP Solar Brewster | Brewster, OH | 2.4 GWh |
#4007 | US GSA - Sacramento | Sacramento, CA | 2.4 GWh |
#4008 | Chatham Landfill | Chatham, MA | 2.4 GWh |
#4009 | Tom Sifers Solar | Fraser, CO | 2.4 GWh |
#4010 | FELPS 7- Floresville West | Floresville, TX | 2.4 GWh |
#4011 | SR Kersey II | Kersey, CO | 2.4 GWh |
#4012 | Grossmont HS Solar Project | El Cajon, CA | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Calabro Airport North Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Caithness Long Island Energy Center | Yaphank, NY | 2.7 TWh | 3.5 mi |
Calabro Airport South Solar Project | Shirley, NY | 2.4 GWh | 1.2 mi |
Calverton | Calverton, NY | 4.5 GWh | 9.7 mi |
Calverton Solar Energy Center | Calverton, NY | 22.9 GWh | 9.1 mi |
Holtsville | Holtsville, NY | 30.0 GWh | 10 mi |
Holtsville Solar Project | Holtsville, NY | 1.7 GWh | 8.5 mi |
Leavenworth Greenworks LLC | Calverton, NY | 17.5 GWh | 9.2 mi |
Lincoln Ave Solar Project | Holbrook, NY | 3.7 GWh | 11.3 mi |
Long Island Solar Farm LLC | Upton, NY | 51.3 GWh | 3 mi |
MacArthur Waste to Energy Facility | Ronkonkoma, NY | 57.2 GWh | 12.3 mi |
Orbit Bloom Fuel Cell | Medford, NY | 53.0 GWh | 4.8 mi |
Richard M Flynn | Holtsville, NY | 683.8 GWh | 9.9 mi |
Riverhead Solar Farm | Calverton, NY | 36.0 GWh | 9 mi |
Shoreham | Wading River, NY | 1.4 GWh | 9.6 mi |
Shoreham Energy LLC | Shoreham, NY | 22.1 GWh | 9.3 mi |
Shoreham Solar Commons | Shoreham, NY | 54.4 GWh | 7.8 mi |
Sutter Greenworks LLC | Calverton, NY | 8.6 GWh | 9.1 mi |
SWM Fuel Cell | Yaphank, NY | 59.5 GWh | 3.6 mi |
Wading River | Shoreham, NY | 24.1 GWh | 9.3 mi |
William Floyd School District | Mastic Beach, NY | 4.1 GWh | 3.4 mi |