Cabot Holyoke
102 Cabot Street, Holyoke, MA 1040Plant Summary Information
Cabot Holyoke is ranked #26 out of 29 hydroelectric power plants in Massachusetts in terms of total annual net electricity generation.
Cabot Holyoke is comprised of 4 generators and generated 1.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Cabot Holyoke |
---|---|
Utility Name | City of Holyoke Gas and Electric Dept. |
Location | Hampden County, MA |
Initial Operation Date | January 1893 |
Last Update | Dec 2023 |
Annual Generation | 6.1 GWh |
Annual Consumption | 21.6 k MMBtu |
Ranked #7,253 out of 11,852 Power Plants Nationwide | |
Ranked #1,105 out of 1,371 Water Power Plants Nationwide | |
Ranked #175 out of 598 Massachusetts Power Plants | |
Ranked #26 out of 29 Massachusetts Water Power Plants | |
Fuel Types | Water |
Map of Cabot Holyoke
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cabot Holyoke.
Monthly Net Generation for Cabot Holyoke
Cabot Holyoke Details
Summary Information | |
---|---|
Plant Name | Cabot Holyoke (9864) |
Plant Address | 102 Cabot Street, Holyoke, MA 1040 |
Utility | City of Holyoke Gas and Electric Dept. (8776) |
Latitude, Longitude | 42.2, -72.61 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1893 |
Annual Generation | 6.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Connecticut River |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Holyoke - (MA) (8774) MA |
Grid Voltage | 4.80 kV |
Energy Storage | No |
Generator 1 Details Operating January 1893
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1893 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating January 1907
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1907 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating January 1938
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1938 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating January 1939
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1939 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Cabot Holyoke Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1095 | Peters Drive Plant | Hood River, OR | 6.3 GWh |
#1096 | Arpin Dam | Radisson, WI | 6.3 GWh |
#1097 | International Paper Woronoco Mill | Woronoco, MA | 6.2 GWh |
#1098 | Saluda Dam | Greenville, SC | 6.2 GWh |
#1099 | Burney Creek | Burney, CA | 6.2 GWh |
#1100 | Mother Ann Lee | Harrodsburg, KY | 6.2 GWh |
#1101 | Fontana | Rialto, CA | 6.2 GWh |
#1102 | Texon Hydroelectric Project | Russell, MA | 6.1 GWh |
#1103 | Mottville | White Pigeon, MI | 6.1 GWh |
#1104 | Radford | Radford, VA | 6.1 GWh |
#1106 | Way Dam | Crystal Falls, MI | 6.0 GWh |
#1107 | Lilliwaup Falls Generating | Lilliwaup, WA | 6.0 GWh |
#1108 | East Barnet | Barnet, VT | 6.0 GWh |
#1109 | Carters | Chatsworth, GA | 6.0 GWh |
#1110 | Fulton Hydro | Fulton, NY | 6.0 GWh |
#1111 | Hat Rapids | Rhinelander, WI | 5.9 GWh |
#1112 | Indian Valley Dam Hydro Project | Clearlake Oaks, CA | 5.9 GWh |
#1113 | International Paper Riley Hydro | Jay, ME | 5.9 GWh |
#1114 | Cow Creek | Millville, CA | 5.9 GWh |
#1115 | Stillwater Reservoir Hydro | Webb, NY | 5.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cabot Holyoke.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 14.1 GWh | 4.6 mi |
Boatlock | Holyoke, MA | 21.3 GWh | 0.7 mi |
CED Chicopee Solar | Chicopee, MA | 4.9 GWh | 3 mi |
Chemical | Holyoke, MA | 7.4 GWh | 0.6 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.4 GWh | 3 mi |
Chicopee River Solar | Springfield, MA | 3.0 GWh | 4.5 mi |
Chicopee Solar | Chicopee, MA | 4.5 GWh | 1.7 mi |
Dwight | Chicopee, MA | 9.8 GWh | 3.5 mi |
East Springfield Solar PV | Springfield, MA | 1.9 GWh | 5.2 mi |
Easthampton CSG | Easthampton, MA | 3.5 GWh | 4.9 mi |
Front Street | Chicopee, MA | 476.0 MWh | 3.7 mi |
Granby LFG | Granby, MA | 2.9 GWh | 3.7 mi |
Granby Solar, LLC CSG | Granby, MA | 5.6 GWh | 4.9 mi |
Hadley Falls | Holyoke, MA | 218.2 GWh | 0.9 mi |
Holyoke Solar Cooperative at Mueller | Holyoke, MA | 3.9 GWh | 3.8 mi |
Mt. Tom Solar Project Hybrid | Holyoke, MA | 5.3 GWh | 4.8 mi |
Riverside Holyoke | Holyoke, MA | 40.4 GWh | 0.8 mi |
Smith & Wesson at Springfield MA PV | Springfield, MA | 2.3 GWh | 5.2 mi |
Southampton Solar PV | Southampton, MA | 2.6 GWh | 5.1 mi |
Stony Brook | Ludlow, MA | 25.0 GWh | 5.1 mi |