Cabot Holyoke

102 Cabot Street, Holyoke, MA 1040

Plant Summary Information

Cabot Holyoke is ranked #26 out of 29 hydroelectric power plants in Massachusetts in terms of total annual net electricity generation.

Cabot Holyoke is comprised of 4 generators and generated 1.5 GWh during the 3-month period between September 2023 to December 2023.

Plant NameCabot Holyoke
Utility NameCity of Holyoke Gas and Electric Dept.
LocationHampden County, MA
Initial Operation DateJanuary 1893
Last Update Dec 2023
Annual Generation 6.1 GWh
Annual Consumption 21.6 k MMBtu
Ranked #7,244 out of 11,835 Power Plants Nationwide
Ranked #1,105 out of 1,371 Water Power Plants Nationwide
Ranked #175 out of 598 Massachusetts Power Plants
Ranked #26 out of 29 Massachusetts Water Power Plants
Fuel Types Water

Map of Cabot Holyoke

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cabot Holyoke.

Create Your Account Today

Monthly Net Generation for Cabot Holyoke

Cabot Holyoke Details

Summary Information
Plant NameCabot Holyoke (9864)
Plant Address102 Cabot Street, Holyoke, MA 1040
UtilityCity of Holyoke Gas and Electric Dept. (8776)
Latitude, Longitude42.2, -72.61
Generation Dates on FileJan 2001 to Dec 2023
Initial Operation DateJanuary 1893
Annual Generation 6.1 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceConnecticut River
Ash Impoundment No
Transmission / Distribution OwnerCity of Holyoke - (MA) (8774) MA
Grid Voltage 4.80 kV
Energy StorageNo

Generator 1 Details Operating January 1893

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1893
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator 4 Details Operating January 1907

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Nameplate Power Factor0.8
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1907
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator 2 Details Operating January 1938

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1938
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator 3 Details Operating January 1939

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.4 MW
Nameplate Power Factor0.8
Summer Capacity0.4 MW
Winter Capacity0.4 MW
Minimum Load0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1939
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Cabot Holyoke Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#1095Peters Drive PlantHood River, OR6.3 GWh
#1096Arpin DamRadisson, WI6.3 GWh
#1097International Paper Woronoco MillWoronoco, MA6.2 GWh
#1098Saluda DamGreenville, SC6.2 GWh
#1099Burney CreekBurney, CA6.2 GWh
#1100Mother Ann LeeHarrodsburg, KY6.2 GWh
#1101FontanaRialto, CA6.2 GWh
#1102Texon Hydroelectric ProjectRussell, MA6.1 GWh
#1103MottvilleWhite Pigeon, MI6.1 GWh
#1104RadfordRadford, VA6.1 GWh
#1106Way DamCrystal Falls, MI6.0 GWh
#1107Lilliwaup Falls GeneratingLilliwaup, WA6.0 GWh
#1108East BarnetBarnet, VT6.0 GWh
#1109Fulton HydroFulton, NY6.0 GWh
#1110Hat RapidsRhinelander, WI5.9 GWh
#1111Indian Valley Dam Hydro ProjectClearlake Oaks, CA5.9 GWh
#1112International Paper Riley HydroJay, ME5.9 GWh
#1113Cow CreekMillville, CA5.9 GWh
#1114Stillwater Reservoir HydroWebb, NY5.8 GWh
#1115Dunn PaperGouverneur, NY5.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Cabot Holyoke.

Plant NamePlant LocationAnnual GenerationDistance
Ameresco Chicopee EnergyChicopee, MA14.1 GWh4.6 mi
BoatlockHolyoke, MA21.3 GWh0.7 mi
CED Chicopee SolarChicopee, MA4.9 GWh3 mi
ChemicalHolyoke, MA7.4 GWh0.6 mi
Chicopee Granby Road SolarChicopee, MA2.4 GWh3 mi
Chicopee River SolarSpringfield, MA3.0 GWh4.5 mi
Chicopee SolarChicopee, MA4.5 GWh1.7 mi
DwightChicopee, MA9.8 GWh3.5 mi
East Springfield Solar PVSpringfield, MA1.9 GWh5.2 mi
Easthampton CSGEasthampton, MA3.5 GWh4.9 mi
Front StreetChicopee, MA476.0 MWh3.7 mi
Granby LFGGranby, MA2.9 GWh3.7 mi
Granby Solar, LLC CSGGranby, MA5.6 GWh4.9 mi
Hadley FallsHolyoke, MA218.2 GWh0.9 mi
Holyoke Solar Cooperative at MuellerHolyoke, MA3.9 GWh3.8 mi
Mt. Tom Solar Project HybridHolyoke, MA5.3 GWh4.8 mi
Riverside HolyokeHolyoke, MA40.4 GWh0.8 mi
Smith & Wesson at Springfield MA PVSpringfield, MA2.3 GWh5.2 mi
Southampton Solar PVSouthampton, MA2.6 GWh5.1 mi
Stony BrookLudlow, MA26.3 GWh5.1 mi