CA - Madera USD - Madera South HS

705 W Pecan Ave, Madera, CA 93637

Plant Summary Information

CA - Madera USD - Madera South HS is ranked #784 out of 799 solar farms in California in terms of total annual net electricity generation.

CA - Madera USD - Madera South HS generated 387.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameCA - Madera USD - Madera South HS
Utility NameForefront Power, LLC
LocationMadera County, CA
Initial Operation DateSeptember 2023
Last Update Dec 2023
Annual Generation 462.0 MWh
Annual Consumption 1.6 k MMBtu
Ranked #11,049 out of 11,835 Power Plants Nationwide
Ranked #5,533 out of 5,643 Solar Power Plants Nationwide
Ranked #1,539 out of 1,569 California Power Plants
Ranked #784 out of 799 California Solar Power Plants
Fuel Types Solar

Map of CA - Madera USD - Madera South HS

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA - Madera USD - Madera South HS.

Create Your Account Today

Monthly Net Generation for CA - Madera USD - Madera South HS

CA - Madera USD - Madera South HS Details

Summary Information
Plant NameCA - Madera USD - Madera South HS (65615)
Plant Address705 W Pecan Ave, Madera, CA 93637
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.95, -120.05
Generation Dates on FileSep 2023 to Dec 2023
Initial Operation DateSeptember 2023
Annual Generation 462.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageNo

Generator 19009 Details Operating September 2023

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.2 MW
Summer Capacity1.2 MW
Winter Capacity1.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2023
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle7
DC Net Capacity1.5 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.5 MW
Virtual Net Metering AgreementNo

CA - Madera USD - Madera South HS Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5523BEMS East SolarSouthhampton, NJ486.0 MWh
#5524Solar Photovoltaic Project #02Chino, CA482.7 MWh
#5525Metro Support Services Center SolarLos Angeles, CA479.0 MWh
#5526MCCo Solar Generating FacilityCleveland, OH478.0 MWh
#5527Hunterdon Health System Solar ProjectClinton, NJ476.2 MWh
#5528Blue Elk VII Solar, LLCFlint, MI474.0 MWh
#5529William G Mennen Sports SolarMorristown, NJ468.0 MWh
#5530NY Lancaster Shisler Rd Site 2 Solar CSGLancaster, NY466.0 MWh
#5531Edison 0308 SolarEdison, NJ464.0 MWh
#5532Gray SolarRutland, VT463.0 MWh
#5534Amazon JFK8 Solar ProjectStaten Island, NY460.0 MWh
#5535SV CSG Baileyville 1 LLCBaileyville, IL460.0 MWh
#5536OswegoOswego, NY457.0 MWh
#5537Solar Photovoltaic Project #03Rialto, CA452.8 MWh
#5538NY Lancaster Gunnville Rd Site 1 Solar CSGLancaster, NY451.0 MWh
#5539SV CSG Baileyville 2 LLCBaileyville, IL450.0 MWh
#5540SV CSG South Dekalb 1 LLCDekalb, IL447.0 MWh
#5541Manteca Land PVManteca, CA444.0 MWh
#5542Blue Elk III Solar, LLCEaton Rapids, MI433.0 MWh
#5543SV CSG South Dekalb 2 LLCDekalb, IL432.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding CA - Madera USD - Madera South HS.

Plant NamePlant LocationAnnual GenerationDistance
Ampersand Chowchilla Biomass LLCChowchilla, CA49.1 GWh15.4 mi
Borden Solar FarmMadera, CA117.8 GWh5 mi
Chowchilla IIChowchilla, CA13.6 GWh15.4 mi
City of Madera WWTPMadera, CA1.9 GWh6 mi
Clovis North High SchoolFresno, CA1.4 GWh17.8 mi
DGS Central California Womens FacilityChowchilla, CA3.2 GWh11.1 mi
DGS Valley State PrisonChowchilla, CA4.0 GWh11.9 mi
Diamond H Dairy PowerChowchilla, CA10.9 GWh18.4 mi
Five H Farms Solar ArrayMerced, CA2.3 GWh17.8 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh16.1 mi
Fresno Hoover High School HybridFresno, CA2.1 GWh17.9 mi
Madera 1 PVMadera, CA2.7 GWh9.8 mi
Madera Community HospitalMadera, CA1.8 GWh0.6 mi
Pacific Ethanol Madera Solar ArrayMadera, CA1.4 GWh4.9 mi
Saint Agnes Medical CenterFresno, CA26.1 GWh17.6 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh18.1 mi
Sealed Air Madera Solar ProjectMadera, CA5.6 GWh0.5 mi
Site 980 65Madera, CA6.3 GWh11.1 mi
Wonderful FirebaughFirebaugh, CA10.1 GWh16.9 mi
Wonderful Orchards - New ColumbiaFirebaugh, CA9.4 GWh17.1 mi