C P Kelco San Diego Plant
2025 E Harbor Dr, San Diego, CA 92113Plant Summary Information
C P Kelco San Diego Plant is ranked #76 out of 338 natural gas power plants in California in terms of total annual net electricity generation.
C P Kelco San Diego Plant is comprised of 3 generators and generated 20.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | C P Kelco San Diego Plant |
---|---|
Utility Name | CPKelco U S Inc |
Location | San Diego County, CA |
Initial Operation Date | October 1983 |
Last Update | Mar 2024 |
Annual Generation | 111.9 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #2,999 out of 11,249 Power Plants Nationwide | |
Ranked #877 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #329 out of 1,501 California Power Plants | |
Ranked #76 out of 338 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of C P Kelco San Diego Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for C P Kelco San Diego Plant.
Monthly Net Generation for C P Kelco San Diego Plant
C P Kelco San Diego Plant Details
Summary Information | |
---|---|
Plant Name | C P Kelco San Diego Plant (52147) |
Plant Address | 2025 E Harbor Dr San Diego, CA 92113 |
Utility | CPKelco U S Inc (3221) |
Latitude, Longitude | 32.6947, -117.1436 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | October 1983 |
Annual Generation | 111.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 81-40-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Food Manufacturing (311) |
Sector | Industrial CHP (7) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
Natural Gas Storage | Yes |
Liquefied Natural Gas Storage | No |
Generator GEN1 Details Operating October 1983
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 9.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 9.2 MW |
Winter Capacity | 9.2 MW |
Minimum Load | 7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1983 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating October 1983
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 9.3 MW |
Winter Capacity | 9.3 MW |
Minimum Load | 7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1983 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Out of Service October 1983
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 9.3 MW |
Winter Capacity | 9.3 MW |
Minimum Load | 7 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | October 1983 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
C P Kelco San Diego Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#867 | Decker Creek | Austin, TX | 115.4 GWh |
#868 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 276.0 GWh |
#869 | Victoria Port Power II LLC | Victoria, TX | 115.1 GWh |
#870 | Kansas Ethanol, LLC | Lyons, KS | 114.3 GWh |
#871 | University of Illinois Cogen Facility | Chicago, IL | 114.3 GWh |
#872 | Cargill Corn Milling Division | Eddyville, IA | 113.8 GWh |
#873 | Whiting Refinery | Whiting, IN | 499.0 GWh |
#874 | Mariposa Energy Project | Byron, CA | 112.5 GWh |
#875 | Greenwood (MO) | Greenwood, MO | 123.2 GWh |
#876 | Phillips 66 Rodeo Refinery | Rodeo, CA | 363.2 GWh |
#878 | Pulliam | Green Bay, WI | 111.5 GWh |
#879 | Seminole Mill | Jacksonville, FL | 111.0 GWh |
#880 | Brownsville Peaking Power | Brownsville, TN | 110.0 GWh |
#881 | Biron Mill | Wisconsin Rapids, WI | 216.8 GWh |
#882 | MJMEUC Generating Station #1 | Laddonia, MO | 109.2 GWh |
#883 | Kalamazoo River Generating Station | Comstock, MI | 109.0 GWh |
#884 | Canyon Power Plant | Anaheim, CA | 109.0 GWh |
#885 | UCI Facilities Management Central Plant | Irvine, CA | 108.7 GWh |
#886 | Domtar Kingsport Mill | Kingsport, TN | 163.3 GWh |
#887 | Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 108.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding C P Kelco San Diego Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Childrens Hospital | San Diego, CA | 28.9 GWh | 7.2 mi |
Chula Vista Energy Center | Chula Vista, CA | 2.4 GWh | 8.7 mi |
County of San Diego COC Hybrid | San Diego, CA | 3.5 GWh | 9.6 mi |
County of San Diego SBRC | Chula Vista, CA | 2.5 GWh | 5.7 mi |
Cuyamaca Peak Energy Plant | El Cajon, CA | 13.7 GWh | 12.2 mi |
Gas Utilization Facility | San Diego, CA | 32.5 GWh | 6.1 mi |
Grossmont Hospital | La Mesa, CA | 31.5 GWh | 9.9 mi |
Grossmont HS Solar Project | El Cajon, CA | 2.4 GWh | 11.9 mi |
Illumina Way SD | San Diego, CA | 28.0 GWh | 12.7 mi |
Kyocera International Inc.(San Diego) | San Diego, CA | 11.6 GWh | 8.6 mi |
Lindberg FIeld Solar | San Diego, CA | 5.1 GWh | 4.4 mi |
Lindberg Field Solar 2 | San Diego, CA | 3.7 GWh | 4.3 mi |
Miramar Energy Facility | San Diego, CA | 23.3 GWh | 12.7 mi |
MM San Diego-Miramar | San Diego, CA | 47.1 GWh | 10.4 mi |
Naval Hospital Medical Center | San Diego, CA | 20.7 GWh | 2.2 mi |
PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.3 GWh | 7.5 mi |
San Diego Community College | San Diego, CA | 7.8 GWh | 7.8 mi |
San Diego State University | San Diego, CA | 62.4 GWh | 7.2 mi |
SeaWorld Aquatica | Chula Vista, CA | 2.0 GWh | 11 mi |
University of San Diego | San Diego, CA | 7.6 GWh | 6 mi |