C&H Sugar Plant is ranked #6 out of 7 purchased steam power plants nationwide in terms of total annual net electricity generation.

C&H Sugar Plant is comprised of 2 generators and generated 8.7 GWh during the 3-month period between June 2024 to September 2024.

Plant NameC&H Sugar Plant
Utility NameC&H Sugar Company Inc
LocationContra Costa County, CA
Initial Operation DateOctober 1957
Last Update Sep 2024
Annual Generation 38.7 GWh
Annual Consumption 145.8 k MMBtu
Ranked #4,201 out of 11,852 Power Plants Nationwide
Ranked #6 out of 7 Purchased Steam Power Plants Nationwide
Ranked #543 out of 1,570 California Power Plants
Ranked #1 out of 1 California Purchased Steam Power Plants
Fuel Types Purchased Steam

Map of C&H Sugar Plant

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for C&H Sugar Plant.

Create Your Account Today

Monthly Net Generation for C&H Sugar Plant

C&H Sugar Plant Details

Summary Information
Plant NameC&H Sugar Plant (58251)
Plant Address830 Loring Ave, Crockett, CA 94525
UtilityC&H Sugar Company Inc (58223)
Latitude, Longitude38.05722, -122.21889
Generation Dates on FileJan 2012 to Sep 2024
Initial Operation DateOctober 1957
Annual Generation 38.7 GWh
Fuel Types Purchased Steam
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeFood Manufacturing (311)
Sector Industrial CHP (7)
Water SourceMunicipality
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 230.00 kV
Energy StorageNo

Generator TG4 Details Operating October 1957

TechnologyAll Other
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity4 MW
Nameplate Power Factor0.8
Summer Capacity5 MW
Winter Capacity5 MW
Minimum Load1.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 1957
Combined Heat & Power Yes
Sector NameIndustrial CHP (7)
Topping Or BottomingT
Energy SourcePurchased Steam
Startup SourcePurchased Steam
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Subcritical TechnologyNo
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator TG3 Details Operating January 1958

TechnologyAll Other
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity4 MW
Nameplate Power Factor0.8
Summer Capacity5 MW
Winter Capacity5 MW
Minimum Load1.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1958
Combined Heat & Power Yes
Sector NameIndustrial CHP (7)
Topping Or BottomingT
Energy SourcePurchased Steam
Startup SourcePurchased Steam
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Subcritical TechnologyNo
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

C&H Sugar Plant Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Purchased Steam.

RankPlant NamePlant LocationAnnual Generation
#1Granite City WorksGranite City, IL497.2 GWh
#2Shell Deer ParkDeer Park, TX1.4 TWh
#3Twin Rivers Paper Co LLCMadawaska, ME105.5 GWh
#4PPG RiversideLake Charles, LA98.5 GWh
#5Texas City Plant Union CarbideTexas City, TX42.3 GWh
#7Franklin Heating StationRochester, MN56.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding C&H Sugar Plant.

Plant NamePlant LocationAnnual GenerationDistance
American Canyon SolarAmerican Canyon, CA6.6 GWh7.2 mi
Bio-RadHercules, CA3.3 GWh3.8 mi
CA Dept of Public Health at RichmondRichmond, CA3.8 GWh11.7 mi
CCCSD Wastewater Treatment PlntMartinez, CA21.0 GWh9.1 mi
Crockett Cogen ProjectCrockett, CA1.5 TWh0.2 mi
Foundation ABFairfield, CA2.9 GWh13.9 mi
Lake HermanBenicia, CA13.1 GWh5 mi
Marathon Bay Area CogenMartinez, CA662.3 GWh9 mi
Marin Clean Energy Solar OneRichmond, CA19.9 GWh11.6 mi
Martinez RefiningMartinez, CA708.4 GWh6.5 mi
Martinez Sulfuric Acid Regeneration PltMartinez, CA15.6 GWh6 mi
Nove Power PlantRichmond, CA35.0 MWh10.8 mi
PE BerkeleyBerkeley, CA161.2 GWh13.1 mi
Phillips 66 Carbon PlantRodeo, CA50.1 GWh2.8 mi
Phillips 66 Rodeo RefineryRodeo, CA291.0 GWh2.4 mi
Richmond CogenRichmond, CA922.3 GWh12.3 mi
SFDK SolarVallejo, CA10.0 GWh5.2 mi
Soscol Ferry SolarNapa, CA4.3 GWh12.8 mi
SunEdison Anheuser Busch FairfieldFairfield, CA747.0 MWh13.9 mi
Valero Refinery Cogeneration Unit 1Benicia, CA181.8 GWh4.4 mi