Butte College Main Campus Solar
3536 Butte Campus Drive, Oroville, CA 95965Plant Summary Information
Butte College Main Campus Solar is ranked #356 out of 799 solar farms in California in terms of total annual net electricity generation.
Butte College Main Campus Solar generated 1.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Butte College Main Campus Solar |
---|---|
Utility Name | Butte-Glenn Community College District |
Location | Butte County, CA |
Initial Operation Date | July 2011 |
Last Update | Dec 2023 |
Annual Generation | 6.7 GWh |
Annual Consumption | 23.7 k MMBtu |
Ranked #7,057 out of 11,852 Power Plants Nationwide | |
Ranked #2,382 out of 5,655 Solar Power Plants Nationwide | |
Ranked #981 out of 1,570 California Power Plants | |
Ranked #356 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Butte College Main Campus Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Butte College Main Campus Solar.
Monthly Net Generation for Butte College Main Campus Solar
Butte College Main Campus Solar Details
Summary Information | |
---|---|
Plant Name | Butte College Main Campus Solar (57970) |
Plant Address | 3536 Butte Campus Drive, Oroville, CA 95965 |
Utility | Butte-Glenn Community College District (57345) |
Latitude, Longitude | 39.64806, -121.64417 |
Generation Dates on File | Jan 2012 to Dec 2023 |
Initial Operation Date | July 2011 |
Annual Generation | 6.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator SOL1 Details Operating July 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Summer Capacity | 3.6 MW |
Winter Capacity | 3.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 195 |
Tilt Angle | 18 |
DC Net Capacity | 5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 5 MW |
Virtual Net Metering Agreement | No |
Butte College Main Campus Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2372 | 1073 Onslow Solar | Hubert, NC | 6.7 GWh |
#2373 | Catlin Solar 1 LLC | Beaver Dams, NY | 6.7 GWh |
#2374 | DG Crystal Spring CSG | Mattapoisett, MA | 6.7 GWh |
#2375 | Cicero Energy Storage 2 LLC | East Syracuse, NY | 6.7 GWh |
#2376 | Cortlandville III Solar CSG | Cortland, NY | 6.7 GWh |
#2377 | Tioga Solar South(CSG) | Owego, NY | 6.7 GWh |
#2378 | Tioga Solar North(CSG) | Owego, NY | 6.7 GWh |
#2379 | Knaggs Brothers Farm | Altamont, NY | 6.7 GWh |
#2380 | Douglas Solar | Douglas, MA | 6.7 GWh |
#2381 | GMP Solar - Williston | Williston, VT | 6.7 GWh |
#2383 | SEPV Sierra | Lancaster, CA | 14.5 GWh |
#2384 | Gilead | Gilead, NC | 6.7 GWh |
#2385 | Las Virgenes | Calabasas, CA | 6.7 GWh |
#2386 | Watervliet PV | Watervliet, MI | 6.6 GWh |
#2387 | American Canyon Solar | American Canyon, CA | 6.6 GWh |
#2388 | Aloha Solar Energy Fund 1 PK1 | Waianae, HI | 6.6 GWh |
#2389 | Railroad Farm | St. Pauls, NC | 6.6 GWh |
#2390 | Plymouth Site 1 | Plympton, MA | 6.6 GWh |
#2391 | BWC Gibbs Brook | Wareham, MA | 6.6 GWh |
#2392 | Zuma Solar, LLC | Providence, NC | 6.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Butte College Main Campus Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2127 Harris Solar Project | Live Oak, CA | 1.5 GWh | 24.7 mi |
Ameresco Butte County | Paradise, CA | 16.0 GWh | 4.9 mi |
Bucks Creek | Storrie, CA | 84.5 GWh | 24.7 mi |
Cresta | Storrie, CA | 121.7 GWh | 17.5 mi |
De Sabla | Magalia, CA | 47.2 GWh | 15.3 mi |
Edward C Hyatt | Oroville, CA | 2.4 TWh | 10.9 mi |
Enloe Medical - Chico | Chico, CA | 13.5 GWh | 12.7 mi |
Forbestown | Forbestown, CA | 155.0 GWh | 20.6 mi |
Forks of Butte Hydro Project | Magalia, CA | 41.9 GWh | 15.3 mi |
Gridley Main | Gridley, CA | 1.6 GWh | 19.1 mi |
Gridley Main Two | Gridley, CA | 4.0 GWh | 19.1 mi |
Kelly Ridge | Oroville, CA | 65.0 GWh | 11.4 mi |
Oroville Cogeneration LP | Oroville, CA | 235.0 MWh | 11.6 mi |
Poe | Storrie, CA | 589.5 GWh | 10.6 mi |
Rock Creek | Storrie, CA | 559.2 GWh | 23.8 mi |
Sierra Nevada Brewing Co Hybrid | Chico, CA | 9.3 GWh | 10.5 mi |
Thermalito | Oroville, CA | 350.5 GWh | 9.2 mi |
Thermalito Diverson Dam | Oroville, CA | 16.5 GWh | 9.8 mi |
Toadtown | Magalia, CA | 2.5 GWh | 17.2 mi |
Woodleaf | Forbestown, CA | 231.6 GWh | 24.3 mi |