Butte College Main Campus Solar is ranked #364 out of 808 solar farms in California in terms of total annual net electricity generation.

Butte College Main Campus Solar generated 1.1 GWh during the 3-month period between September 2023 to December 2023.

Plant NameButte College Main Campus Solar
Utility NameButte-Glenn Community College District
LocationButte County, CA
Initial Operation DateJuly 2011
Last Update Dec 2023
Annual Generation 6.7 GWh
Annual Consumption 23.7 k MMBtu
Ranked #7,197 out of 11,993 Power Plants Nationwide
Ranked #2,500 out of 5,778 Solar Power Plants Nationwide
Ranked #988 out of 1,579 California Power Plants
Ranked #364 out of 808 California Solar Power Plants
Fuel Types Solar

Map of Butte College Main Campus Solar

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Butte College Main Campus Solar.

Create Your Account Today

Monthly Net Generation for Butte College Main Campus Solar

80080060060040040020020000201220122013201320142014201520152016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Butte College Main Campus Solar Details

Summary Information
Plant NameButte College Main Campus Solar (57970)
Plant Address3536 Butte Campus Drive, Oroville, CA 95965
UtilityButte-Glenn Community College District (57345)
Latitude, Longitude39.64806, -121.64417
Generation Dates on FileJan 2012 to Dec 2023
Initial Operation DateJuly 2011
Annual Generation 6.7 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeEducational Services (611)
Sector Commercial Non-CHP (4)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator SOL1 Details Operating July 2011

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3.5 MW
Summer Capacity3.6 MW
Winter Capacity3.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2011
Combined Heat & Power No
Sector NameCommercial Non-CHP (4)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle195
Tilt Angle18
DC Net Capacity5 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity5 MW
Virtual Net Metering AgreementNo

Butte College Main Campus Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#24901073 Onslow SolarHubert, NC6.7 GWh
#2491Catlin Solar 1 LLCBeaver Dams, NY6.7 GWh
#2492DG Crystal Spring CSGMattapoisett, MA6.7 GWh
#2493Cicero Energy Storage 2 LLCEast Syracuse, NY6.7 GWh
#2494Cortlandville III Solar CSGCortland, NY6.7 GWh
#2495Founders Homestead Farms SolarPortsmouth, RI6.7 GWh
#2496Tioga Solar South(CSG)Owego, NY6.7 GWh
#2497Tioga Solar North(CSG)Owego, NY6.7 GWh
#2498Knaggs Brothers FarmAltamont, NY6.7 GWh
#2499Douglas SolarDouglas, MA6.7 GWh
#2501SEPV SierraLancaster, CA14.5 GWh
#2502GileadGilead, NC6.7 GWh
#2503Las VirgenesCalabasas, CA6.7 GWh
#2504Watervliet PVWatervliet, MI6.6 GWh
#2505GMP Solar - WillistonWilliston, VT6.6 GWh
#2506American Canyon SolarAmerican Canyon, CA6.6 GWh
#2507Aloha Solar Energy Fund 1 PK1Waianae, HI6.6 GWh
#2508Railroad FarmSt. Pauls, NC6.6 GWh
#2509Plymouth Site 1Plympton, MA6.6 GWh
#2510BWC Gibbs BrookWareham, MA6.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Butte College Main Campus Solar.

Plant NamePlant LocationAnnual GenerationDistance
2127 Harris Solar ProjectLive Oak, CA1.5 GWh24.7 mi
Ameresco Butte CountyParadise, CA16.0 GWh4.9 mi
Bucks CreekStorrie, CA84.5 GWh24.7 mi
CrestaStorrie, CA121.7 GWh17.5 mi
De SablaMagalia, CA47.2 GWh15.3 mi
Edward C HyattOroville, CA2.4 TWh10.9 mi
Enloe Medical - ChicoChico, CA13.5 GWh12.7 mi
ForbestownForbestown, CA155.0 GWh20.6 mi
Forks of Butte Hydro ProjectMagalia, CA41.9 GWh15.3 mi
Gridley MainGridley, CA1.6 GWh19.1 mi
Gridley Main TwoGridley, CA4.0 GWh19.1 mi
Kelly RidgeOroville, CA65.0 GWh11.4 mi
Oroville Cogeneration LPOroville, CA235.0 MWh11.6 mi
PoeStorrie, CA590.8 GWh10.6 mi
Rock CreekStorrie, CA617.1 GWh23.8 mi
Sierra Nevada Brewing Co HybridChico, CA9.3 GWh10.5 mi
ThermalitoOroville, CA343.7 GWh9.2 mi
Thermalito Diverson DamOroville, CA16.5 GWh9.8 mi
ToadtownMagalia, CA2.5 GWh17.2 mi
WoodleafForbestown, CA231.6 GWh24.3 mi